Development of Wire-Bonding Dispatch System Using Lean Six Sigma for Semiconductor Back-End Assembly

In the rapid growth of the semiconductor industry, subcontractors are highly competitive to gain their market segment and sustain the business. The ability to meet the shipment commits is critical, often gated by the process cycle time. Increasing challenges arise with high product customization in...

詳細記述

書誌詳細
第一著者: Siti Mariam, Man
フォーマット: 学位論文
言語:英語
英語
英語
出版事項: 2024
主題:
オンライン・アクセス:https://etd.uum.edu.my/10989/1/depositpermission-s900375.pdf
https://etd.uum.edu.my/10989/2/s900375_01.pdf
https://etd.uum.edu.my/10989/3/s900375_02.pdf
https://etd.uum.edu.my/10989/
Abstract Abstract here
_version_ 1855575003649540096
author Siti Mariam, Man
author_facet Siti Mariam, Man
author_sort Siti Mariam, Man
description In the rapid growth of the semiconductor industry, subcontractors are highly competitive to gain their market segment and sustain the business. The ability to meet the shipment commits is critical, often gated by the process cycle time. Increasing challenges arise with high product customization in a make-to-order (MTO) environment. Such a company is Carsem (M) Sdn. Bhd. which had faced the issues of long cycle time resulting in shipment de-commits, and profit loss. The manual planning procedure could not cater to the demands of a quick turnaround for complex products
format Thesis
id oai:etd.uum.edu.my:10989
institution Universiti Utara Malaysia
language English
English
English
publishDate 2024
record_format EPrints
record_pdf Restricted
spelling oai:etd.uum.edu.my:109892024-02-20T01:33:34Z https://etd.uum.edu.my/10989/ Development of Wire-Bonding Dispatch System Using Lean Six Sigma for Semiconductor Back-End Assembly Siti Mariam, Man HE Transportation and Communications In the rapid growth of the semiconductor industry, subcontractors are highly competitive to gain their market segment and sustain the business. The ability to meet the shipment commits is critical, often gated by the process cycle time. Increasing challenges arise with high product customization in a make-to-order (MTO) environment. Such a company is Carsem (M) Sdn. Bhd. which had faced the issues of long cycle time resulting in shipment de-commits, and profit loss. The manual planning procedure could not cater to the demands of a quick turnaround for complex products 2024 Thesis NonPeerReviewed text en https://etd.uum.edu.my/10989/1/depositpermission-s900375.pdf text en https://etd.uum.edu.my/10989/2/s900375_01.pdf text en https://etd.uum.edu.my/10989/3/s900375_02.pdf Siti Mariam, Man (2024) Development of Wire-Bonding Dispatch System Using Lean Six Sigma for Semiconductor Back-End Assembly. Doctoral thesis, Universiti Utara Malaysia.
spellingShingle HE Transportation and Communications
Siti Mariam, Man
Development of Wire-Bonding Dispatch System Using Lean Six Sigma for Semiconductor Back-End Assembly
thesis_level PhD
title Development of Wire-Bonding Dispatch System Using Lean Six Sigma for Semiconductor Back-End Assembly
title_full Development of Wire-Bonding Dispatch System Using Lean Six Sigma for Semiconductor Back-End Assembly
title_fullStr Development of Wire-Bonding Dispatch System Using Lean Six Sigma for Semiconductor Back-End Assembly
title_full_unstemmed Development of Wire-Bonding Dispatch System Using Lean Six Sigma for Semiconductor Back-End Assembly
title_short Development of Wire-Bonding Dispatch System Using Lean Six Sigma for Semiconductor Back-End Assembly
title_sort development of wire bonding dispatch system using lean six sigma for semiconductor back end assembly
topic HE Transportation and Communications
url https://etd.uum.edu.my/10989/1/depositpermission-s900375.pdf
https://etd.uum.edu.my/10989/2/s900375_01.pdf
https://etd.uum.edu.my/10989/3/s900375_02.pdf
https://etd.uum.edu.my/10989/
work_keys_str_mv AT sitimariamman developmentofwirebondingdispatchsystemusingleansixsigmaforsemiconductorbackendassembly