Impak pengurusan sisa dan teknologi hijau terhadap prestasi projek: Kajian ke atas pihak berkepentingan dalam industri pembinaan di Malaysia
Nowadays, the construction industry development requires efficiency, productive, cost effective and environmental friendly. As a result, the government through the Construction Industry Development Board Malaysia (CIDB) in collaboration with stakeholders in construction industry have been implementi...
| Main Author: | Nur Najihah, Osman |
|---|---|
| Format: | Dissertation |
| Language: | English English English English |
| Published: |
2017
|
| Subjects: | |
| Online Access: | https://etd.uum.edu.my/9939/1/kebenaran%20mendeposit-tidak%20membenarkan-818203.pdf https://etd.uum.edu.my/9939/2/s818203_01.pdf https://etd.uum.edu.my/9939/3/s818203_02.pdf https://etd.uum.edu.my/9939/4/s818203_rujukan.docx https://etd.uum.edu.my/9939/ |
| Abstract | Abstract here |
Similar Items
Permodelan pelaksanaan teknologi hijau dalam pengurusan di agensi kerajaan
by: Ismaniza, Ishak
Published: (2021)
by: Ismaniza, Ishak
Published: (2021)
Study of environmental management systems (ISO 14001) for MESRA HIJAU Sdn. Bhd. / Evelyn Chee Siew Poh.
by: Chee, Evelyn Siew Poh
Published: (1998)
by: Chee, Evelyn Siew Poh
Published: (1998)
Impak kilang simen terhadap penghasilan PM10 di Rawang, Selangor Darul Ehsan
by: Mohamad Ihsan Muhamad Ismail
Published: (2016)
by: Mohamad Ihsan Muhamad Ismail
Published: (2016)
Penjerap komposit “lignoselulosa-karbon teraktif (buah semarak api)” dan kaolin dalam rawatan air sisa getah asli mentah
by: Ahmad, Baharin
Published: (2022)
by: Ahmad, Baharin
Published: (2022)
Penglibatan pihak berkepentingan dalam pengurusan alam sekitar Tanah Tinggi di Pulau Pinang
by: Raman, Mariyappan
Published: (2017)
by: Raman, Mariyappan
Published: (2017)
Persepsi pihak berkepentingan terhadap pembangunan dan pengurusan landskap hutan rekreasi di Selangor, Malaysia
by: Mohd. Kher Hussein (P42342)
Published: (2023)
by: Mohd. Kher Hussein (P42342)
Published: (2023)
Keperluan Tenaga Kerja Mengikut Tred Kemahiran bagi Projek Pembinaan Sekolah di Sekitar Lembah Klang, Malaysia
by: Azizun, Hashim
Published: (2011)
by: Azizun, Hashim
Published: (2011)
Faktor Persekitaran Dan Prestasi Kerja Pengurus Projek Di Dalam Industri Pembinaan : Kajian Terhadap Pengurus Projek Di Firma Pembinaan
by: Muhammad, Samsiah
Published: (2007)
by: Muhammad, Samsiah
Published: (2007)
Biodegradation of pharmaceutical compounds caffeine and carbamazepine using gram-positive bacteria / Najihah Mohamad Nasir
by: Mohamad Nasir, Najihah
Published: (2019)
by: Mohamad Nasir, Najihah
Published: (2019)
Impak kecerdasan emosi terhadap prestasi kerja
by: Nur Syazwani Zuhaidi
Published: (2025)
by: Nur Syazwani Zuhaidi
Published: (2025)
Persepsi Inspektor Kesihatan Kawalan Mutu Air Minuman Ke Atas Rekabentuk Kursus Kajian Kebersihan Di Dalam Mempertingkatkan Prestasi Kajian Kebersihan Sistem Bekalan Air
by: Noorazlina, Zainuddin
Published: (2001)
by: Noorazlina, Zainuddin
Published: (2001)
Sikap pihak berkepentingan terhadap undang–undang biokeselamatan di Malaysia
by: Noor Sharizad Rusly (P59644)
Published: (2023)
by: Noor Sharizad Rusly (P59644)
Published: (2023)
Tahap kesediaan pihak berkepentingan sekiranya 'SHASSIC' diwajibkan menjelang 2020
by: Wan Afiq Azwan Wan Othman
Published: (2025)
by: Wan Afiq Azwan Wan Othman
Published: (2025)
The influence pathways of residential environment on quality of life for migrants through social integration across different neighbourhoods: A case study of Yiwu, China / Liyan Huang
by: Liyan , Huang
Published: (2024)
by: Liyan , Huang
Published: (2024)
Faktor Kejayaan Kritikal Pengurusan Projek : Suatu Kes Kajian Kes Projek KLIA
by: Azham, Hussain
Published: (2000)
by: Azham, Hussain
Published: (2000)
Pengoptimuman pra-olahan air sisa kilang kelapa sawit (pome) menggunakan kaedah elektro-penggumpalan
by: Ahmad Taib, Jamilullail
Published: (2013)
by: Ahmad Taib, Jamilullail
Published: (2013)
Species-specific eDNA markers for rapid detection of invasive fishes in Tasik Raban, Malaysia
by: Nurul Fizatul Nabilah Osman
Published: (2023)
by: Nurul Fizatul Nabilah Osman
Published: (2023)
Pembangunan kerangka kerja pelaporan bersepadu sektor awam menurut perspektif pihak berkepentingan
by: Mona Othman (P100848)
Published: (2023)
by: Mona Othman (P100848)
Published: (2023)
Proses jaringan interaksi di antara pihak berkepentingan dalam pengurusan zon pinggir pantai di Malaysia: dari perspektif perundangan
by: Juliana Mohamed (P70493)
Published: (2023)
by: Juliana Mohamed (P70493)
Published: (2023)
Hubungan Antara Kepuasan Gaji dengan Pandangan Gaji Berasaskan Prestasi, Kepuasan Kerja dan Prestasi Kerja : Kajian di Kalangan Kakitangan Sokongan di Kementerian Sains, Teknologi dan Alam Sekitar dan di Ibupejabat Jabatan-Jabatan di Bawahnya
by: Abd. Rahim, Muhd. Zain
Published: (1994)
by: Abd. Rahim, Muhd. Zain
Published: (1994)
Penilaian Projek Pencegahan Pencemaran dan Peningkatan Kualiti Air Sungai Raja Alor Setar, Kedah: Satu Pendekatan IRBM
by: Muhammad Zaki Ichsan Noe, ,
Published: (2013)
by: Muhammad Zaki Ichsan Noe, ,
Published: (2013)
Pengaruh kepimpinan pengurus projek terhadap prestasi karja ahli-ahli pasukan projek pembinaan di Selangor
by: Suzyanty Mohd Shokory (P70784)
Published: (2023)
by: Suzyanty Mohd Shokory (P70784)
Published: (2023)
Penghasilan e-album untuk proses rawatan air sebagai medium pengajaran dan pembelajaran bagi mata pelajaran kejuruteraan bekalan air dan air sisa
by: Raja Ahmad, Raja Nadia
Published: (2004)
by: Raja Ahmad, Raja Nadia
Published: (2004)
Peranan FINAS Dalam Pembangunan Filem Cereka Melayu: Analisis Daripada Persepsi Pihak Berkepentingan
by: Maizira Abdul Majid (P41822)
Published: (2023)
by: Maizira Abdul Majid (P41822)
Published: (2023)
Keberkesanan Projek Pembangunan: Kajian Kes Tapak Perniagaan di Alor Setar, Kedah
by: Nursyidah, ,
Published: (2012)
by: Nursyidah, ,
Published: (2012)
Isu-isu penguatkuasaan terhadap penilaian kesan ke atas alam sekeliling (EIA) bagi projek perumahan di kawasan lereng bukit, kajian kes: Negeri Selangor Darul Ehsan
by: Ahmad, Madya Herawati
Published: (2012)
by: Ahmad, Madya Herawati
Published: (2012)
PEMBANGUNAN PROFIL KOMPETENSI TEKNOLOGIS PROJEK BAGI BIDANG HVAC
by: FAUZI, MUHAMMAD FAWWAZ
Published: (2024)
by: FAUZI, MUHAMMAD FAWWAZ
Published: (2024)
Risiko projek semasa pembinaan
by: Izdihar Mohd. Zain
Published: (2025)
by: Izdihar Mohd. Zain
Published: (2025)
Penentu kepercayaan terhadap institusi zakat: kajian dalam kalangan pihak berkepentingan di negeri Kedah
by: Hafizah, Zainal
Published: (2017)
by: Hafizah, Zainal
Published: (2017)
Perilaku berniat dan faktor peramal pihak berkepentingan di Lembah Klang terhadap genetik perubatan
by: Muhammad Adzran Che Mustapa (P85979)
Published: (2023)
by: Muhammad Adzran Che Mustapa (P85979)
Published: (2023)
Source apportionment and pollution loading in Lake Chini watershed using multivariate statistical analysis
by: Arafat, Md Yasir
Published: (2017)
by: Arafat, Md Yasir
Published: (2017)
Evaluation of the sanitary sewerage system flow design in Kuantan city
by: Yap, Hiew Thong
Published: (2018)
by: Yap, Hiew Thong
Published: (2018)
The compatibility of osmotic and vapour equilibrium techniques in establishing soil-water characteristics curve : a case study for bentonite
by: Nurhidayah, Mahazam
Published: (2017)
by: Nurhidayah, Mahazam
Published: (2017)
Application of upflow anaerobic sludge blanket (UASB) reactor for food waste and pome treatment with biogas production
by: Muhammad Asif, Latif
Published: (2011)
by: Muhammad Asif, Latif
Published: (2011)
Introducing a new trio effects portable water treatment plant for rural areas
by: Oluwasoga, Akindoyo Edward
Published: (2013)
by: Oluwasoga, Akindoyo Edward
Published: (2013)
Assessment of heavy metal deposition in surface water and sediment in Balok and Tunggak River, Kuantan, Malaysia
by: Liza Evianti, Tanjung
Published: (2013)
by: Liza Evianti, Tanjung
Published: (2013)
Ultrasonic membrane anaerobic system for wastewater treatment
by: Khaled Salem, Aljfairi
Published: (2013)
by: Khaled Salem, Aljfairi
Published: (2013)
Environmental sustainability and engineering performance of OPC-fly ash mortar mixs with different workability
by: Putri Zulaiha, Razi
Published: (2014)
by: Putri Zulaiha, Razi
Published: (2014)
Pilycoremediation of palm oil mill effluents (POME) using scenedesmus dimorphus and ciilorella vulgaris
by: Kamrul Fakir, Kamarudin
Published: (2014)
by: Kamrul Fakir, Kamarudin
Published: (2014)
Treatment and enhanced degradation of petrochemical wastewater by continuous stirred tank reactor
by: Siddique, Md. Nurul Islam
Published: (2012)
by: Siddique, Md. Nurul Islam
Published: (2012)
Similar Items
-
Permodelan pelaksanaan teknologi hijau dalam pengurusan di agensi kerajaan
by: Ismaniza, Ishak
Published: (2021) -
Study of environmental management systems (ISO 14001) for MESRA HIJAU Sdn. Bhd. / Evelyn Chee Siew Poh.
by: Chee, Evelyn Siew Poh
Published: (1998) -
Impak kilang simen terhadap penghasilan PM10 di Rawang, Selangor Darul Ehsan
by: Mohamad Ihsan Muhamad Ismail
Published: (2016) -
Penjerap komposit “lignoselulosa-karbon teraktif (buah semarak api)” dan kaolin dalam rawatan air sisa getah asli mentah
by: Ahmad, Baharin
Published: (2022) -
Penglibatan pihak berkepentingan dalam pengurusan alam sekitar Tanah Tinggi di Pulau Pinang
by: Raman, Mariyappan
Published: (2017)
