A study on building defects in newly completed high-rise residential buildings during defects liability period / Zarul Azkief Che Zulkifli

In recent times. buildings defects are constantly arising in Malaysia though it is a newly completed building. These might be happened due to the poor of workmanship and the use of less quality materials. Although the defects of new buildings are not that bad, but it is yet to demonstrate that the s...

पूर्ण विवरण

ग्रंथसूची विवरण
मुख्य लेखक: Che Zulkifli, Zarul Azkief
स्वरूप: थीसिस
भाषा:अंग्रेज़ी
प्रकाशित: Faculty of Architecture, Planning and Surveying 2009
विषय:
ऑनलाइन पहुंच:https://ir.uitm.edu.my/id/eprint/25898/2/25898.pdf
_version_ 1846217951852625920
author Che Zulkifli, Zarul Azkief
author_facet Che Zulkifli, Zarul Azkief
author_sort Che Zulkifli, Zarul Azkief
description In recent times. buildings defects are constantly arising in Malaysia though it is a newly completed building. These might be happened due to the poor of workmanship and the use of less quality materials. Although the defects of new buildings are not that bad, but it is yet to demonstrate that the supervisory levels during the constructions practice are still insufficient. As the results, developers and contradors are still responsible for the defections occurred and it will be repaired during the defect liability period. Consequently, the purposes of this research are to identify the types of defect and percentages of defect during the defect liability period that fell under responsibility and which categories are not Apart from that, this research also implemented in order to spot the consumers (residential owners) right and responsibility during the defections phase. The only scope of the research is focusing on the types of defect that occurred on the new buildings along with that the buildings are still under the defect liability period. The methodology of the research was done by conducting site visits and simple inspection through the survey techniques. Afterward, the data and information acquired during the survey will be identified and analyzed to classify the defects under its respective categories. Apart from that, interview sessions were conducted with some interrelated individual whose involved under the process of construdions and the owners of the residential buildings for the reason of recognizing the respective rights and responsibilities for the defections throughout the defect liability period. As a conclusion, most defect happened during the defect liability period are fully liable by the developers and contractors as long as the rationale of the defections appeared from the developers and contractors themselves, for instant, the poor workmanship and less of material quality. However, should the defects are caused by the negligence of the residents; it would not be accounted as the developer’s liabilities, neither the contractor’s.
format Thesis
id oai:ir.uitm.edu.my:25898
institution Universiti Teknologi MARA
language English
publishDate 2009
publisher Faculty of Architecture, Planning and Surveying
record_format eprints
spelling oai:ir.uitm.edu.my:258982023-11-27T07:26:35Z https://ir.uitm.edu.my/id/eprint/25898/ A study on building defects in newly completed high-rise residential buildings during defects liability period / Zarul Azkief Che Zulkifli Che Zulkifli, Zarul Azkief Building inspection Building failures, errors, defects, etc. In recent times. buildings defects are constantly arising in Malaysia though it is a newly completed building. These might be happened due to the poor of workmanship and the use of less quality materials. Although the defects of new buildings are not that bad, but it is yet to demonstrate that the supervisory levels during the constructions practice are still insufficient. As the results, developers and contradors are still responsible for the defections occurred and it will be repaired during the defect liability period. Consequently, the purposes of this research are to identify the types of defect and percentages of defect during the defect liability period that fell under responsibility and which categories are not Apart from that, this research also implemented in order to spot the consumers (residential owners) right and responsibility during the defections phase. The only scope of the research is focusing on the types of defect that occurred on the new buildings along with that the buildings are still under the defect liability period. The methodology of the research was done by conducting site visits and simple inspection through the survey techniques. Afterward, the data and information acquired during the survey will be identified and analyzed to classify the defects under its respective categories. Apart from that, interview sessions were conducted with some interrelated individual whose involved under the process of construdions and the owners of the residential buildings for the reason of recognizing the respective rights and responsibilities for the defections throughout the defect liability period. As a conclusion, most defect happened during the defect liability period are fully liable by the developers and contractors as long as the rationale of the defections appeared from the developers and contractors themselves, for instant, the poor workmanship and less of material quality. However, should the defects are caused by the negligence of the residents; it would not be accounted as the developer’s liabilities, neither the contractor’s. Faculty of Architecture, Planning and Surveying 2009 Thesis NonPeerReviewed text en https://ir.uitm.edu.my/id/eprint/25898/2/25898.pdf Che Zulkifli, Zarul Azkief (2009) A study on building defects in newly completed high-rise residential buildings during defects liability period / Zarul Azkief Che Zulkifli. (2009) Degree thesis, thesis, Universiti Teknologi MARA (UiTM). <http://terminalib.uitm.edu.my/25898.pdf>
spellingShingle Building inspection
Building failures, errors, defects, etc.
Che Zulkifli, Zarul Azkief
A study on building defects in newly completed high-rise residential buildings during defects liability period / Zarul Azkief Che Zulkifli
title A study on building defects in newly completed high-rise residential buildings during defects liability period / Zarul Azkief Che Zulkifli
title_full A study on building defects in newly completed high-rise residential buildings during defects liability period / Zarul Azkief Che Zulkifli
title_fullStr A study on building defects in newly completed high-rise residential buildings during defects liability period / Zarul Azkief Che Zulkifli
title_full_unstemmed A study on building defects in newly completed high-rise residential buildings during defects liability period / Zarul Azkief Che Zulkifli
title_short A study on building defects in newly completed high-rise residential buildings during defects liability period / Zarul Azkief Che Zulkifli
title_sort study on building defects in newly completed high rise residential buildings during defects liability period zarul azkief che zulkifli
topic Building inspection
Building failures, errors, defects, etc.
url https://ir.uitm.edu.my/id/eprint/25898/2/25898.pdf
url-record https://ir.uitm.edu.my/id/eprint/25898/
work_keys_str_mv AT chezulkiflizarulazkief astudyonbuildingdefectsinnewlycompletedhighriseresidentialbuildingsduringdefectsliabilityperiodzarulazkiefchezulkifli
AT chezulkiflizarulazkief studyonbuildingdefectsinnewlycompletedhighriseresidentialbuildingsduringdefectsliabilityperiodzarulazkiefchezulkifli