Study on the determination of nominated subcontractor / Mohd Izwan Shah Fadzil
In a construction industry there are various problems that may arise. Due to this findings, two important document was introduced namely PAM 98 and PWD 203, where it gives a guide to how contract works are done and carried out and to ensure all parties benefit the same. A study was made on this topi...
| المؤلف الرئيسي: | |
|---|---|
| التنسيق: | أطروحة |
| اللغة: | الإنجليزية |
| منشور في: |
2003
|
| الموضوعات: | |
| الوصول للمادة أونلاين: | https://ir.uitm.edu.my/id/eprint/26694/2/26694.pdf |