Labour Productivity Measurement Method for Malaysian Housing Industry
The industrialised building system (IBS) was introduced in Malaysia in 1966, but it failed to establish itself though there is a sustained large market for residential projects. One of the main reasons behind this failure is a lack of scientific data on labour productivity in the construction ind...
| المؤلف الرئيسي: | |
|---|---|
| التنسيق: | أطروحة |
| اللغة: | الإنجليزية الإنجليزية |
| منشور في: |
2005
|
| الموضوعات: | |
| الوصول للمادة أونلاين: | http://psasir.upm.edu.my/id/eprint/7078/1/FK_2005_41%28a%29.pdf |