Yap, A. K. (2008). Reducing Production Lead Time Through Value Stream Mapping Approach.
Chicagoスタイル(17版)引用形式Yap, Ai Kin. Reducing Production Lead Time Through Value Stream Mapping Approach. 2008.
MLA(9版)引用形式Yap, Ai Kin. Reducing Production Lead Time Through Value Stream Mapping Approach. 2008.
警告: この引用は必ずしも正確ではありません.