Comprehensive project management model to enhance software management success
The management of software projects success with current project management models formally based and developed with traditional or plan-based, agile and hybrid management methodologies in dynamic flexibility and size complexity environments have not worked to its expectation in increasing the su...
| المؤلف الرئيسي: | Mohanarajah, S. |
|---|---|
| التنسيق: | أطروحة |
| اللغة: | الإنجليزية |
| منشور في: |
2020
|
| الموضوعات: | |
| الوصول للمادة أونلاين: | http://psasir.upm.edu.my/id/eprint/98118/1/FSKTM%202020%2025%20-%20IR.pdf |
مواد مشابهة
Optimum Time-Cost Trade-Off Strategies on Critical Path Method for Project Management
حسب: Khalaf, Wakas S.
منشور في: (2010)
حسب: Khalaf, Wakas S.
منشور في: (2010)
Time-Uncertainty Analysis by Using Simulation in Project Scheduling Networks
حسب: Mohammed Omer, Anwar
منشور في: (1999)
حسب: Mohammed Omer, Anwar
منشور في: (1999)
Recurring Project Overrun and Project Management Problems in Engineering and Construction Industries
حسب: Lim, Cheong Seng
منشور في: (2001)
حسب: Lim, Cheong Seng
منشور في: (2001)
Introducing Control and Structure in Software Prototyping
حسب: Rahim, Md. Mahbubur
منشور في: (1992)
حسب: Rahim, Md. Mahbubur
منشور في: (1992)
The Effect of Organizational Context on Quality Management in Small and Medium Scale Enterprises of Pakistan
حسب: Tariq, Abdul Naveed
منشور في: (2002)
حسب: Tariq, Abdul Naveed
منشور في: (2002)
Mediator Connector for Composing Loosely Coupled Software Components
حسب: Sanatnama, Hamid
منشور في: (2009)
حسب: Sanatnama, Hamid
منشور في: (2009)
A Case Study of Transformative Learning Experience Amongst Middle Managers
حسب: Ng, Chiew Sum
منشور في: (2008)
حسب: Ng, Chiew Sum
منشور في: (2008)
Towards Sustainable Management of Pineapple Residues
حسب: Ahmed, Osumanu Haruna
منشور في: (2002)
حسب: Ahmed, Osumanu Haruna
منشور في: (2002)
Development of risk management framework in Malaysian landscape project
حسب: S.Muthuveeran, Adam Aruldewan
منشور في: (2020)
حسب: S.Muthuveeran, Adam Aruldewan
منشور في: (2020)
Modeling Workflow Processes Based on Tasks and Transactions:
A Case Study of the UPM Graduate School Office
حسب: Cheang, Mei Chuin
منشور في: (1997)
حسب: Cheang, Mei Chuin
منشور في: (1997)
Knowledge transfer model of team capability in non-collocated software architecture development
حسب: Abdullah, Salfarina
منشور في: (2012)
حسب: Abdullah, Salfarina
منشور في: (2012)
Development of an industrial toxic and hazardous waste management model based on end-of-pipe and industrial ecology approaches
حسب: Mohamed, Ahmad Fariz
منشور في: (2007)
حسب: Mohamed, Ahmad Fariz
منشور في: (2007)
Crisis Communication: A Case Study in Tenaga Nasional Berhad
حسب: Mat Tazin, Saidathul Nizah
منشور في: (1999)
حسب: Mat Tazin, Saidathul Nizah
منشور في: (1999)
Career Success of Managers and the Moderating Roles of Gender and Managerial Level in the Malaysian Public Sector
حسب: Mohd Rasdi, Roziah
منشور في: (2009)
حسب: Mohd Rasdi, Roziah
منشور في: (2009)
Work Place Learning Among Successful Professionals: A Case Study of Selected Television Producers in a Public Television Station
حسب: Ponnan, Ramachandran
منشور في: (2003)
حسب: Ponnan, Ramachandran
منشور في: (2003)
An Assessment Of Participatory Integrated Watershed Management In The Hilkot Watershed, Mansehra,Pakistan
حسب: Shah, Hakim
منشور في: (2008)
حسب: Shah, Hakim
منشور في: (2008)
Biology and Management of Fimbristylis Miliacea (L.) Vahl
حسب: Begum, Mahfuza
منشور في: (2006)
حسب: Begum, Mahfuza
منشور في: (2006)
Development of visualized earned value management tool for project management
حسب: Abdullah, Andy-Al-Affendi
منشور في: (2018)
حسب: Abdullah, Andy-Al-Affendi
منشور في: (2018)
System dynamics simulation model to assess impacts of personnel factors on delayed software projects
حسب: Farshchi, Mostafa
منشور في: (2011)
حسب: Farshchi, Mostafa
منشور في: (2011)
Optimization of Lipase Catalyzed Synthesis of 3-O-benzoylbetulinic Acid
حسب: Yasin, Yamin
منشور في: (2004)
حسب: Yasin, Yamin
منشور في: (2004)
Maintaining Replica Consistency Over Large-Scale Data Grid Using Update Propagation Technique
حسب: A. Radi, Mohammed A.
منشور في: (2009)
حسب: A. Radi, Mohammed A.
منشور في: (2009)
A Survey on Total Quality Management Implementation in Malaysian Manufacturing Companies
حسب: Tan, Hui Mieng
منشور في: (1997)
حسب: Tan, Hui Mieng
منشور في: (1997)
The work ethics of Malay construction project managers / Madinah Hussin Torrance
حسب: Torrance, Madinah Hussin
منشور في: (2007)
حسب: Torrance, Madinah Hussin
منشور في: (2007)
Chemical Constituents From Annona Muricata (Linn.) and Garcinia Mangostana (Linn.) and Their Biological Activities
حسب: Daud, Shaari
منشور في: (2005)
حسب: Daud, Shaari
منشور في: (2005)
Properties and Utilisation of Tropical Bamboo (Gigantochloa Scortechinii), for Structural Plywood
حسب: Uyup, Mohd Khairul Anwar
منشور في: (2003)
حسب: Uyup, Mohd Khairul Anwar
منشور في: (2003)
Modification of Alginate Controlled-Release Formulations of Alachlor and Diuron with Pectin: Their Release Kinetics and Efficacy
حسب: Basari, Sopiah
منشور في: (2003)
حسب: Basari, Sopiah
منشور في: (2003)
Chemical Constituents and Biological Activities of Selected Artocarpus Spp.
حسب: Mohd. Hashim, Najihah
منشور في: (2011)
حسب: Mohd. Hashim, Najihah
منشور في: (2011)
Quality of service-based selection model for Software as-a-Service in small and medium enterprises
حسب: Ogunrinde, Rowland Rotimi
منشور في: (2019)
حسب: Ogunrinde, Rowland Rotimi
منشور في: (2019)
Effects of Forest Harvesting Operations on Suspended Sediment and Solute Loads in the Sungai Weng Experimental Watersheds, Kedah, Peninsular Malaysia
حسب: Akkharath, Inthavy
منشور في: (2005)
حسب: Akkharath, Inthavy
منشور في: (2005)
Effects of the Irrigation Management Programme on Boro Rice Productivity and Agrarian Income Inequality
In North-West Bangladesh
حسب: Arif, Md. Taufiqul
منشور في: (1991)
حسب: Arif, Md. Taufiqul
منشور في: (1991)
The Impact of Network Relationships on Smes' Internationalization Process: A Case Study of Malaysian Firms
حسب: Ng, Siew Imm
منشور في: (2002)
حسب: Ng, Siew Imm
منشور في: (2002)
Pembelajaran berbantukan komputer - pendekatan model gabungan : kajian kes pegawai pengurusan atasan sektor awam
حسب: Mohamad, Kamaruzaman
منشور في: (2002)
حسب: Mohamad, Kamaruzaman
منشور في: (2002)
Antecedents of Organizational Citizenship Behavior of Human Resource Managers in the Public Sector
حسب: Asgari, Ali
منشور في: (2009)
حسب: Asgari, Ali
منشور في: (2009)
Suitability Of Exserohilum Longirostratum (Subram.) As A Bioherbicide For Integrated Management Of Barnyard Grass [Echinochloa Crus-Galli (L.) Beauv. Spp. Crusgalli] In Malaysia
حسب: Ng, Saw Chin
منشور في: (2007)
حسب: Ng, Saw Chin
منشور في: (2007)
Development of project success model using partial least squares - structural equation modeling for Malaysia SMES
حسب: Khan, Ahmed Ali M.
منشور في: (2019)
حسب: Khan, Ahmed Ali M.
منشور في: (2019)
Management of Sambar Deer (Cervus Unicolor Brookei) Under Agroforestry System in Sarawak
حسب: Jiwan, Dawend
منشور في: (2001)
حسب: Jiwan, Dawend
منشور في: (2001)
Effects of strategy commitment, engagement, communication and organizational support on successful strategy execution
حسب: Chuah, Chin Wei
منشور في: (2015)
حسب: Chuah, Chin Wei
منشور في: (2015)
Project planning tool
حسب: Alias, Hafiza
منشور في: (2005)
حسب: Alias, Hafiza
منشور في: (2005)
Development of a fuzzy integral group model based on linguistic reasoning for project manager selection
حسب: Afshari, Ali Reza
منشور في: (2012)
حسب: Afshari, Ali Reza
منشور في: (2012)
Antioxidant Activity And Bioactive Compounds Of Selected Tropical Plants
حسب: Mustafa, Roheeyati Ashikin
منشور في: (2009)
حسب: Mustafa, Roheeyati Ashikin
منشور في: (2009)
مواد مشابهة
-
Optimum Time-Cost Trade-Off Strategies on Critical Path Method for Project Management
حسب: Khalaf, Wakas S.
منشور في: (2010) -
Time-Uncertainty Analysis by Using Simulation in Project Scheduling Networks
حسب: Mohammed Omer, Anwar
منشور في: (1999) -
Recurring Project Overrun and Project Management Problems in Engineering and Construction Industries
حسب: Lim, Cheong Seng
منشور في: (2001) -
Introducing Control and Structure in Software Prototyping
حسب: Rahim, Md. Mahbubur
منشور في: (1992) -
The Effect of Organizational Context on Quality Management in Small and Medium Scale Enterprises of Pakistan
حسب: Tariq, Abdul Naveed
منشور في: (2002)