The accuracy of preliminary cost estimates in Public Works Department (PWD) of Peninsular Malaysia / Mohd Azrai Azman
| Auteur principal: | Mohd Azrai, Azman |
|---|---|
| Format: | Thèse |
| Publié: |
2012
|
| Sujets: |
Documents similaires
Termination procedures of projects by the public works department (PWD)
par: Sanusi, Intan Safina
Publié: (2015)
par: Sanusi, Intan Safina
Publié: (2015)
Analysis of factors affecting the accuracy of early cost estimate in construction projects
par: Woyowarsito, Dodi Ardianto
Publié: (2011)
par: Woyowarsito, Dodi Ardianto
Publié: (2011)
Claims for additional preliminaries costs due to project prolongation
par: Saidin, Aminuddin
Publié: (2015)
par: Saidin, Aminuddin
Publié: (2015)
Management of variation order in Public Work Department Malaysia construction project
par: Amir Mohamed, Sharil Amran
Publié: (2013)
par: Amir Mohamed, Sharil Amran
Publié: (2013)
Construction project cost estimation software utilization in construction industry / Khairul Izzuddin Shah Azman Shah
par: Azman Shah, Khairul Izzuddin
Publié: (2020)
par: Azman Shah, Khairul Izzuddin
Publié: (2020)
Impact of waqf financing on Federal government expenditure and debt in Malaysia / Azniza Hartini Azrai Azaimi Ambrose
par: Azniza Hartini, Azrai Azaimi Ambrose
Publié: (2018)
par: Azniza Hartini, Azrai Azaimi Ambrose
Publié: (2018)
The superintending officer’s duties under JKR Sarawak form of contract PWD 75 (Ver. 2006)
par: Engkamat, Frauline
Publié: (2009)
par: Engkamat, Frauline
Publié: (2009)
Computerised building cost estimating system
par: Marjuki, Mofti
Publié: (2006)
par: Marjuki, Mofti
Publié: (2006)
Building Information Modelling (BIM) execution plan framework : a case study of pre-approved plan (PAP) design modelling project in the Public Work Department (PWD) of Malaysia
par: Ahmad Ridzuan, Abu Bakar
Publié: (2023)
par: Ahmad Ridzuan, Abu Bakar
Publié: (2023)
The Influence Of Uncertainty Variables On
Project Cost Estimation
par: Rauzana, Anita
Publié: (2015)
par: Rauzana, Anita
Publié: (2015)
Level of understanding the contract requirements of PWD 203A (Rev.2007) standard form of contract among the construction professional
par: Abu Bakar, Norazreen
Publié: (2011)
par: Abu Bakar, Norazreen
Publié: (2011)
Application of BIM in early stage design cost estimation
par: Maskuriy, Raihan
Publié: (2014)
par: Maskuriy, Raihan
Publié: (2014)
Hidden Cost In Building Conservation Works
par: Wee, Li Woon
Publié: (2011)
par: Wee, Li Woon
Publié: (2011)
Status of estimates for emergency work
par: Maidin, Noraini
Publié: (2010)
par: Maidin, Noraini
Publié: (2010)
An evaluation of effectiveness of approximate quantity method in estimating construction cost
par: Siew, Sik Nguong
Publié: (2013)
par: Siew, Sik Nguong
Publié: (2013)
Thermal design of roof: A case study of PWD new quarters design, Malaysia / Nor Zaini Ikrom Zakaria
par: Nor Zaini Ikrom, Zakaria
Publié: (2006)
par: Nor Zaini Ikrom, Zakaria
Publié: (2006)
An approach to manage termination due to national interest in clause 52.0 OF public work department form 203A (REV.1/2010).
par: Mansor, Lydiana
Publié: (2022)
par: Mansor, Lydiana
Publié: (2022)
Isolation and expression analysis of oil palm suppressor of PPI1 Locus1 (SP1) / Mohd Azrai Loh Mohd Azlan Loh
par: Mohd Azrai Loh , Mohd Azlan Loh
Publié: (2022)
par: Mohd Azrai Loh , Mohd Azlan Loh
Publié: (2022)
The cost overruns in green building development : case study Ministry of Public Works new green building project Republic of Indonesia
par: Putro, Anggoro
Publié: (2012)
par: Putro, Anggoro
Publié: (2012)
Population genetics of Rhizophora apiculata in peninsular malaysia using microsatellite markers / Amelia Azman
par: Amelia , Azman
Publié: (2020)
par: Amelia , Azman
Publié: (2020)
Economic comparison of industrialized building system with conventional system through cost estimation using building information modeling
par: Faghirinejadfard, Amir
Publié: (2014)
par: Faghirinejadfard, Amir
Publié: (2014)
Establishing the norm of organisational structure for public works department
par: Othman, Mohamad Farijal
Publié: (2010)
par: Othman, Mohamad Farijal
Publié: (2010)
Study of technology acceptance of computerized maintenance management systems (CMMS) as a tool for measuring contractor's performance: A case study of public work department, Putrajaya / Noor Farisya Azahar
par: Noor Farisya, Azahar
Publié: (2017)
par: Noor Farisya, Azahar
Publié: (2017)
The development of cost estimation model for Indonesian state building: The case of West Sumatera province / Dwi Fitra Yenti Jumas
par: Dwi Fitra Yenti, Jumas
Publié: (2019)
par: Dwi Fitra Yenti, Jumas
Publié: (2019)
Energy consumption: Characteristics and user’s attitude / Azman Arifin
par: Arifin, Azman
Publié: (2003)
par: Arifin, Azman
Publié: (2003)
Framework development of bills of quantities accuracy in construction organisation
par: Bandi, Shamsulhadi
Publié: (2015)
par: Bandi, Shamsulhadi
Publié: (2015)
Framework of measurement engineer workload at Public Work Department district of Malaysia
par: Awang @ Muda, Mohd. Aswarudin
Publié: (2015)
par: Awang @ Muda, Mohd. Aswarudin
Publié: (2015)
The comparison on the milestone and monthly payment of project performance in public works department
par: Ishak, Shukri
Publié: (2015)
par: Ishak, Shukri
Publié: (2015)
The effects of dialysis on body bioimpedance / Nurulnisa Nor Azman
par: Nurulnisa , Nor Azman
Publié: (2012)
par: Nurulnisa , Nor Azman
Publié: (2012)
Collaboration and communication of project team in PWD web based project monitoring system
par: Jaafar, Redzuan
Publié: (2010)
par: Jaafar, Redzuan
Publié: (2010)
Employers' attitudes towards people with disabilities (PWD) and employment intention in Kota Kinabalu
par: Goy, Peng Liak
Publié: (2014)
par: Goy, Peng Liak
Publié: (2014)
Road maintenance management system : a case study at public work department
par: Mohamed, Nurul Wahida
Publié: (2010)
par: Mohamed, Nurul Wahida
Publié: (2010)
Mobile Tender (M-Tender) For Public Work Department Within Malaysian Government.
par: Zahrawi, Ali Ahmad Deeb
Publié: (2007)
par: Zahrawi, Ali Ahmad Deeb
Publié: (2007)
3D Tic Tac Toe / Irma Yuliana Azman
par: Irma Yuliana, Azman
Publié: (2003)
par: Irma Yuliana, Azman
Publié: (2003)
Visual approach of Malaysian animations from 1990s to 2000s / Khairul Azman
par: Azman, Khairul
Publié: (2019)
par: Azman, Khairul
Publié: (2019)
An ensemble model to improve effort estimation accuracy for software development
par: Mahmood, Yasir
Publié: (2022)
par: Mahmood, Yasir
Publié: (2022)
Determination dynamic characteristic of simple beam using experimental modal analysis and finite element analysis / Mohd Azra'ie Jusop
par: Jusop, Mohd Azra'ie
Publié: (2010)
par: Jusop, Mohd Azra'ie
Publié: (2010)
Improving safety control of PWD project through the inclusion of safety requirement in the bill of quantity
par: Md. Rabani , Norman
Publié: (2010)
par: Md. Rabani , Norman
Publié: (2010)
MY Legalis Management System / Muhammad Hanif Nor Azman
par: Nor Azman, Muhammad Hanif
Publié: (2017)
par: Nor Azman, Muhammad Hanif
Publié: (2017)
Estimate in formation of construction contract
par: Ahmad Termizi, Ezatul Sharida
Publié: (2013)
par: Ahmad Termizi, Ezatul Sharida
Publié: (2013)
Documents similaires
-
Termination procedures of projects by the public works department (PWD)
par: Sanusi, Intan Safina
Publié: (2015) -
Analysis of factors affecting the accuracy of early cost estimate in construction projects
par: Woyowarsito, Dodi Ardianto
Publié: (2011) -
Claims for additional preliminaries costs due to project prolongation
par: Saidin, Aminuddin
Publié: (2015) -
Management of variation order in Public Work Department Malaysia construction project
par: Amir Mohamed, Sharil Amran
Publié: (2013) -
Construction project cost estimation software utilization in construction industry / Khairul Izzuddin Shah Azman Shah
par: Azman Shah, Khairul Izzuddin
Publié: (2020)