A Modified Multi-Step Crossover Fusion (MSXF) In Solving Some Deterministic Job Shop Scheduling Problem (JSSP) [TS157.5. M214 2008 f rb].
This thesis addresses the job shop scheduling problem (JSSP) with the objective of minimising the makespan value. Tesis ini membincangkan masalah penskedulan kerja kedaian (JSSP) dengan objektif untuk meminimumkan masa operasi.
| Main Author: | Omar, Mahanim |
|---|---|
| Format: | Thesis |
| Language: | English |
| Published: |
2008
|
| Subjects: | |
| Online Access: | http://eprints.usm.my/9513/ |
| Abstract | Abstract here |
Similar Items
Job shop scheduling problem (JSSP)
by: Abdullah, Nurul Azma
Published: (2004)
by: Abdullah, Nurul Azma
Published: (2004)
Visual Inspection System To Detect Connector Tilts In PCBAs [TS156. V844 2005 f rb] [Microfiche 7845].
by: Retnasamy, Vithyacharan
Published: (2005)
by: Retnasamy, Vithyacharan
Published: (2005)
GA Based Feature Recognition of Step File for CAD/CAM Integration
by: Syafnil, Alfais Admiral
Published: (2009)
by: Syafnil, Alfais Admiral
Published: (2009)
Development Of Decision Model For Maintenance Analysis Of Non-Repairable Component By Considering The External Factor [TS192. R821 2007 f rb].
by: Rosmaini, Ahmad
Published: (2007)
by: Rosmaini, Ahmad
Published: (2007)
Employee Involvement In EMS/ISO 14001 And Its Spillover Effect In Creating Consumer Environmentally Responsible Behavior [TS155.7. R173 2007 f rb].
by: Nik Abdul Rashid, Nik Ramli
Published: (2007)
by: Nik Abdul Rashid, Nik Ramli
Published: (2007)
Comparative Study Between Mixed Model Assembly Line And Flexible Assembly Line Based On Cost Minimization Approach [TS167. F278 2008 f rb].
by: Ahmed, Fawad
Published: (2008)
by: Ahmed, Fawad
Published: (2008)
Comparative Study Between Mixed Model Assembly Line And Flexible Assembly Line Based On Cost Minimization Approach [TS167. F278 2008 f rb].
by: Fawad Ahmed, Fawad Ahmed
Published: (2008)
by: Fawad Ahmed, Fawad Ahmed
Published: (2008)
A Proposed Single EWMA Chart Combining The X And R Charts For A Joint Monitoring Of The Process Mean And Variance [TS156. Y46 2008 f rb].
by: Yeong, Kah Wai
Published: (2008)
by: Yeong, Kah Wai
Published: (2008)
Kesan Perkhidmatan Pengurusan Fasiliti Ke Atas Kepuasan Penyelia Kilang Elektrik Dan Elektronik (E&E) Di Malaysia [TS155. A827 2005 f rb].
by: Zainuddin, Ashrof
Published: (2005)
by: Zainuddin, Ashrof
Published: (2005)
Machining feature-based system for supporting step-compliant milling process
by: Chen, Wong Keong
Published: (2017)
by: Chen, Wong Keong
Published: (2017)
Bottleneck-based heuristic for three-machine flow shop scheduling
by: Abdul Rahim, Mohd Salleh
Published: (2011)
by: Abdul Rahim, Mohd Salleh
Published: (2011)
Bottleneck adjacent matching heuristics for scheduling a re-entrant flow shop with dominant machine problem
by: Sh Ahmad, Sh Salleh
Published: (2009)
by: Sh Ahmad, Sh Salleh
Published: (2009)
A Proposed Double Moving Average (DMA) Control Chart [TS156.8. W872 2007 f rb].
by: Wong, Voon Hee
Published: (2007)
by: Wong, Voon Hee
Published: (2007)
The degree of JIT in mineral oil and asphalt industries in Libya
by: Mohamed Elbishti, Entsar Kouni Alhaj
Published: (2015)
by: Mohamed Elbishti, Entsar Kouni Alhaj
Published: (2015)
Characterization and development of polycaprolactone (PCL)/montmorillonite (MMT)/hydroxapaptite (HA) nano-composites for fused deposition modelling (FDM) process
by: Abdul Haq, Raezul Haq
Published: (2015)
by: Abdul Haq, Raezul Haq
Published: (2015)
Improved classifier chain methods based on heuristic optimization techniques for multi-label classification problem
by: Oyekunle, Adeleke Abdullahi
Published: (2022)
by: Oyekunle, Adeleke Abdullahi
Published: (2022)
The role of risks, collaboration and performance in the supply chain of manufacturing firms of Malaysia
by: Shahbaz, Muhammad Saeed
Published: (2019)
by: Shahbaz, Muhammad Saeed
Published: (2019)
Influence of organizational culture in the relationship between information system and operational performance on manufacturing sector in UAE
by: Abdulla Lari, Darwish Ahmed Darwish
Published: (2021)
by: Abdulla Lari, Darwish Ahmed Darwish
Published: (2021)
A contingency-based decision support instrument for selecting lean production tools and techniques
by: Yahya, Mohd Shahir
Published: (2021)
by: Yahya, Mohd Shahir
Published: (2021)
A guided artificial bee colony (GABC) heuristic for permutation flowshop scheduling problem (PFSP)
by: Sidek, Noor Azizah
Published: (2021)
by: Sidek, Noor Azizah
Published: (2021)
Development of new lean manufacturing approach through people development and process improvement as a mediator in the libyan companies
by: M. A. Ataalah, Abdurezzag
Published: (2019)
by: M. A. Ataalah, Abdurezzag
Published: (2019)
Analysis of various rapid prototyping techniques for investment casting
by: Marwah, Omar Mohd Faizan
Published: (2016)
by: Marwah, Omar Mohd Faizan
Published: (2016)
Heuristics method for truck disassembly process
by: Yeoh, Kim Hao
Published: (2020)
by: Yeoh, Kim Hao
Published: (2020)
Perception of success on implementation of ISO 9001 : 2008 and its influence to organizational commitment in Sabah Electricity Sdn. Bhd. (SESB)
by: Esther Masulah
Published: (2010)
by: Esther Masulah
Published: (2010)
The impact of ISO 9000 registration on Total Quality Management (TQM) practices in the public sector: A comparative study
by: Nor Fuad Abdul Hamid
Published: (2004)
by: Nor Fuad Abdul Hamid
Published: (2004)
Mechanical performances of eco- board from oil palm empty fruit bunch (OPEFB) and mahang (artocarpus oddorattisimus)
by: Mohd Fazil bin Jundam
Published: (2021)
by: Mohd Fazil bin Jundam
Published: (2021)
Enhancement of Kansei engineering methodology for sound design
by: Yiap, Shin Yi
Published: (2017)
by: Yiap, Shin Yi
Published: (2017)
The impact of lean six sigma practices based on industrial revolution 4.0 towards balanced scorecard indicators in Malaysia manufacturing sector
by: Zamri, Shafeeka Fadlikh
Published: (2021)
by: Zamri, Shafeeka Fadlikh
Published: (2021)
Dynamic weighted idle time heuristic for flowshop scheduling
by: Zainudin, Amira Syuhada
Published: (2017)
by: Zainudin, Amira Syuhada
Published: (2017)
Industrial revolution 4.0 implementation: current practice and barriers in manufacturing firms of Malaysia
by: Tay, Shu Ing
Published: (2020)
by: Tay, Shu Ing
Published: (2020)
Pattern recognition for manufacturing process variation using integrated statistical process control – artificial neural network
by: Mohd Ariffin, Ahmad Azrizal
Published: (2015)
by: Mohd Ariffin, Ahmad Azrizal
Published: (2015)
The framework of improving on-site materials tracking for inventory management process in construction projects
by: Liwan, Siti Radziah
Published: (2015)
by: Liwan, Siti Radziah
Published: (2015)
A study on extrusion of multiple material bonding for fused depostion modeling
by: Azahari, Mohamad Azhar
Published: (2014)
by: Azahari, Mohamad Azhar
Published: (2014)
Intergration of control chart and pattern recognizer for bivariate quality control
by: Mohd Sohaimi, Nurul Adlihisam
Published: (2015)
by: Mohd Sohaimi, Nurul Adlihisam
Published: (2015)
Design optimization for the two-stage bivariate pattern recognition scheme
by: Mokhtar, Mohd Shukri
Published: (2015)
by: Mokhtar, Mohd Shukri
Published: (2015)
Dynamic supply chain capabilities : a case of oil and gas industry in Malaysia
by: Shatina, Saad
Published: (2016)
by: Shatina, Saad
Published: (2016)
Relationship between lean manufacturing practices and sustainability in manufacturing organisations: Mediating effect of manufacturing performance and moderating effect of ethical climates
by: Mohd Zulfabli, Hasan
Published: (2021)
by: Mohd Zulfabli, Hasan
Published: (2021)
Inventory management strategies propensity toward supply chain management in the aerospace industry in Malaysia : the moderating effect of financial risk consideration
by: Khor, Wei Min
Published: (2017)
by: Khor, Wei Min
Published: (2017)
Proposed RFID-Based Inventory Control System Framework for Penfabric Sdn Bhd
by: Yiap, Pei Chuin
Published: (2006)
by: Yiap, Pei Chuin
Published: (2006)
Mechanical design of an automated vehicle driving system for drive cycle testing
by: Saini, Adam
Published: (2016)
by: Saini, Adam
Published: (2016)
Similar Items
-
Job shop scheduling problem (JSSP)
by: Abdullah, Nurul Azma
Published: (2004) -
Visual Inspection System To Detect Connector Tilts In PCBAs [TS156. V844 2005 f rb] [Microfiche 7845].
by: Retnasamy, Vithyacharan
Published: (2005) -
GA Based Feature Recognition of Step File for CAD/CAM Integration
by: Syafnil, Alfais Admiral
Published: (2009) -
Development Of Decision Model For Maintenance Analysis Of Non-Repairable Component By Considering The External Factor [TS192. R821 2007 f rb].
by: Rosmaini, Ahmad
Published: (2007) -
Employee Involvement In EMS/ISO 14001 And Its Spillover Effect In Creating Consumer Environmentally Responsible Behavior [TS155.7. R173 2007 f rb].
by: Nik Abdul Rashid, Nik Ramli
Published: (2007)
