Productivity improvement preventive actions for hard defect failure reduction at hard disk drive assembly process

Hard defect failures in hard disk drives are detected from the first level failure analysis of the Final Quality Assurance failed drives at Company AB. The hard defect failures are then send for second level failure analysis to determine the potential root cause of the failure. High hard defect fail...

Full description

Bibliographic Details
Main Author: Ramachandran, Eswari Devi
Format: Thesis
Language:English
English
Published: 2014
Subjects:
Online Access:http://eprints.utem.edu.my/id/eprint/14749/
https://plh.utem.edu.my/cgi-bin/koha/opac-detail.pl?biblionumber=92236
Abstract Abstract here
_version_ 1855619569355325440
author Ramachandran, Eswari Devi
author_facet Ramachandran, Eswari Devi
author_sort Ramachandran, Eswari Devi
description Hard defect failures in hard disk drives are detected from the first level failure analysis of the Final Quality Assurance failed drives at Company AB. The hard defect failures are then send for second level failure analysis to determine the potential root cause of the failure. High hard defect failures causes low lot acceptance rate which delays drives shipment due to long lead time and also deliver poor quality drives to customer. The recovery activity for FQA failure lots also requires additional space and tester. The aim of this project is to reduce hard defect failure at Final Quality Assurance through three objectives; (i) to identify and analyze potential root causes of the hard defect failures, (ii) to develop a model of prevention action and (iii) to validate the preventive action model effectiveness. The analysis of data is based on six weeks Final Quality Assurance failed tested data of product 'A' trend analysis using QUALITY DATABASE system and sampling of two drives per week for Aslab second level FA for continuous five weeks. 5 Whys and FMEA are performed to determine the potential preventive action and preventive action model is developed. Pre and post DPPM and lot acceptance rate results are monitored and compared to validate the effectiveness of the preventive actions after one month. Results show the actuator component from U supplier show significant trend from QUALITY DAT ABASE analysis as well as the AsLab results. Three potential root causes of hard defect failures have been determined as incoming material cleanliness, poor screening at backend test and assembly cleanliness. The main actions implemented are temporary stop U actuator supplier; introduce hard defect long test screen REV Q at backend and briefing and awareness on assembly related findings. From the implementation the main actions, observed 92.8% hard defect failure dppm reduction and LAR above 70% is achieved. The benefits of this project are the reduction of failed lots due to hard defect failures, minimiz.e the rework activity and also improve customer satisfaction. The result is based on comparable sample size and show significant with P value <0.05. For the future work, the proposed model can be improved using the application of Fuzzy Logic for data storage and data retrieval.
format Thesis
id utem-14749
institution Universiti Teknikal Malaysia Melaka
language English
English
publishDate 2014
record_format EPrints
record_pdf Restricted
spelling utem-147492022-12-29T15:32:27Z http://eprints.utem.edu.my/id/eprint/14749/ Productivity improvement preventive actions for hard defect failure reduction at hard disk drive assembly process Ramachandran, Eswari Devi TS Manufactures Hard defect failures in hard disk drives are detected from the first level failure analysis of the Final Quality Assurance failed drives at Company AB. The hard defect failures are then send for second level failure analysis to determine the potential root cause of the failure. High hard defect failures causes low lot acceptance rate which delays drives shipment due to long lead time and also deliver poor quality drives to customer. The recovery activity for FQA failure lots also requires additional space and tester. The aim of this project is to reduce hard defect failure at Final Quality Assurance through three objectives; (i) to identify and analyze potential root causes of the hard defect failures, (ii) to develop a model of prevention action and (iii) to validate the preventive action model effectiveness. The analysis of data is based on six weeks Final Quality Assurance failed tested data of product 'A' trend analysis using QUALITY DATABASE system and sampling of two drives per week for Aslab second level FA for continuous five weeks. 5 Whys and FMEA are performed to determine the potential preventive action and preventive action model is developed. Pre and post DPPM and lot acceptance rate results are monitored and compared to validate the effectiveness of the preventive actions after one month. Results show the actuator component from U supplier show significant trend from QUALITY DAT ABASE analysis as well as the AsLab results. Three potential root causes of hard defect failures have been determined as incoming material cleanliness, poor screening at backend test and assembly cleanliness. The main actions implemented are temporary stop U actuator supplier; introduce hard defect long test screen REV Q at backend and briefing and awareness on assembly related findings. From the implementation the main actions, observed 92.8% hard defect failure dppm reduction and LAR above 70% is achieved. The benefits of this project are the reduction of failed lots due to hard defect failures, minimiz.e the rework activity and also improve customer satisfaction. The result is based on comparable sample size and show significant with P value <0.05. For the future work, the proposed model can be improved using the application of Fuzzy Logic for data storage and data retrieval. 2014 Thesis NonPeerReviewed text en http://eprints.utem.edu.my/id/eprint/14749/1/Productivity%20Improvement%20Preventive%20Actions%20For%20Hard%20Defect%20Failure%20Reduction%20At%20Hard%20Disk%20Drive%20Assembly%20Prosecc%2024pages.pdf text en http://eprints.utem.edu.my/id/eprint/14749/2/Productivity%20improvement%20preventive%20actions%20for%20hard%20defect%20failure%20reduction%20at%20hard%20disk%20drive%20assembly%20process.pdf Ramachandran, Eswari Devi (2014) Productivity improvement preventive actions for hard defect failure reduction at hard disk drive assembly process. Masters thesis, Universiti Teknikal Malaysia Melaka. https://plh.utem.edu.my/cgi-bin/koha/opac-detail.pl?biblionumber=92236
spellingShingle TS Manufactures
Ramachandran, Eswari Devi
Productivity improvement preventive actions for hard defect failure reduction at hard disk drive assembly process
thesis_level Master
title Productivity improvement preventive actions for hard defect failure reduction at hard disk drive assembly process
title_full Productivity improvement preventive actions for hard defect failure reduction at hard disk drive assembly process
title_fullStr Productivity improvement preventive actions for hard defect failure reduction at hard disk drive assembly process
title_full_unstemmed Productivity improvement preventive actions for hard defect failure reduction at hard disk drive assembly process
title_short Productivity improvement preventive actions for hard defect failure reduction at hard disk drive assembly process
title_sort productivity improvement preventive actions for hard defect failure reduction at hard disk drive assembly process
topic TS Manufactures
url http://eprints.utem.edu.my/id/eprint/14749/
https://plh.utem.edu.my/cgi-bin/koha/opac-detail.pl?biblionumber=92236
work_keys_str_mv AT ramachandraneswaridevi productivityimprovementpreventiveactionsforharddefectfailurereductionatharddiskdriveassemblyprocess