Flexible lot size for kanban system to reduce material overflow in hard disc assembly process

This research was conducted based on a case study at an electronic manufacturing company that produces hard disc. Here, Kitting is the first step in assembly process. It is initiated well before the commencement of actual production to be able to prepare and deliver the material on time. Compound/Ki...

Full description

Bibliographic Details
Main Author: Astuti, Fatma Hermining
Format: Thesis
Language:English
English
Published: 2015
Subjects:
Online Access:http://eprints.utem.edu.my/id/eprint/16876/
https://plh.utem.edu.my/cgi-bin/koha/opac-detail.pl?biblionumber=96136
Abstract Abstract here

Similar Items