A Financial Analysis To Identify Constraint Tools And Its Operational Impacts

Basic downtime analysis refers to the effort of understanding overall downtime rates which is related to production issues leading to the efficiency improvement of the whole production. However, in a large production system, there are a lot of different types of machines and processes with their ind...

Description complète

Détails bibliographiques
Auteur principal: Lim, Poh Siong
Format: Thèse
Langue:anglais
anglais
Publié: 2016
Sujets:
Accès en ligne:http://eprints.utem.edu.my/id/eprint/20783/
https://plh.utem.edu.my/cgi-bin/koha/opac-detail.pl?biblionumber=104907
Abstract Abstract here
_version_ 1855619675428225024
author Lim, Poh Siong
author_facet Lim, Poh Siong
author_sort Lim, Poh Siong
description Basic downtime analysis refers to the effort of understanding overall downtime rates which is related to production issues leading to the efficiency improvement of the whole production. However, in a large production system, there are a lot of different types of machines and processes with their individual capacities despite being linear in manner. The specification is referred as the parameters of the downtime cost related factors which have different impact on the downtime analysis. As a result, common study is unable to justify which process or machine requires focus and priority in any downtime improvement program. The justification needs to be supported with a financial analysis which requires the costing method on the downtime issues since the improvement program requires possible financial budget and the potential cost saving activities should be well planned and managed. The main objectives of this project are to link up actual downtime issues to the cost followed by a further analysis on the impact of the downtime cost. The project will be a future tool for the top management to make decision and changes in their operations to move their companies towards better practices and most importantly reducing the operational costs. A period of ten consecutive weeks of downtime monitoring has been conducted in a chosen company by selecting two of its bottleneck processes. During this study, two major downtime cost categories from each process is calculated by using the introduced costing method and an overall potential cost saving improvement program is established. Findings from this study will provide linkages of downtime to financial losses followed by a detailed Pareto breakdown of key drivers. Therefore, this clear determination enables necessary recommendations of downtime improvement effort to be provided within the factory.
format Thesis
id utem-20783
institution Universiti Teknikal Malaysia Melaka
language English
English
publishDate 2016
record_format EPrints
record_pdf Restricted
spelling utem-207832021-10-08T17:08:59Z http://eprints.utem.edu.my/id/eprint/20783/ A Financial Analysis To Identify Constraint Tools And Its Operational Impacts Lim, Poh Siong T Technology (General) TS Manufactures Basic downtime analysis refers to the effort of understanding overall downtime rates which is related to production issues leading to the efficiency improvement of the whole production. However, in a large production system, there are a lot of different types of machines and processes with their individual capacities despite being linear in manner. The specification is referred as the parameters of the downtime cost related factors which have different impact on the downtime analysis. As a result, common study is unable to justify which process or machine requires focus and priority in any downtime improvement program. The justification needs to be supported with a financial analysis which requires the costing method on the downtime issues since the improvement program requires possible financial budget and the potential cost saving activities should be well planned and managed. The main objectives of this project are to link up actual downtime issues to the cost followed by a further analysis on the impact of the downtime cost. The project will be a future tool for the top management to make decision and changes in their operations to move their companies towards better practices and most importantly reducing the operational costs. A period of ten consecutive weeks of downtime monitoring has been conducted in a chosen company by selecting two of its bottleneck processes. During this study, two major downtime cost categories from each process is calculated by using the introduced costing method and an overall potential cost saving improvement program is established. Findings from this study will provide linkages of downtime to financial losses followed by a detailed Pareto breakdown of key drivers. Therefore, this clear determination enables necessary recommendations of downtime improvement effort to be provided within the factory. 2016 Thesis NonPeerReviewed text en http://eprints.utem.edu.my/id/eprint/20783/1/A%20Financial%20Analysis%20To%20Identify%20Constraint%20Tools%20And%20Its%20Operational%20Impacts%20-%20Lim%20Poh%20Siong%20-%2024%20Pages.pdf text en http://eprints.utem.edu.my/id/eprint/20783/2/A%20Financial%20Analysis%20To%20Identify%20Constraint%20Tools%20And%20Its%20Operational%20Impacts%20-%20Lim%20Poh%20Siong.pdf Lim, Poh Siong (2016) A Financial Analysis To Identify Constraint Tools And Its Operational Impacts. Masters thesis, Universiti Teknikal Malaysia Melaka. https://plh.utem.edu.my/cgi-bin/koha/opac-detail.pl?biblionumber=104907
spellingShingle T Technology (General)
TS Manufactures
Lim, Poh Siong
A Financial Analysis To Identify Constraint Tools And Its Operational Impacts
thesis_level Master
title A Financial Analysis To Identify Constraint Tools And Its Operational Impacts
title_full A Financial Analysis To Identify Constraint Tools And Its Operational Impacts
title_fullStr A Financial Analysis To Identify Constraint Tools And Its Operational Impacts
title_full_unstemmed A Financial Analysis To Identify Constraint Tools And Its Operational Impacts
title_short A Financial Analysis To Identify Constraint Tools And Its Operational Impacts
title_sort financial analysis to identify constraint tools and its operational impacts
topic T Technology (General)
TS Manufactures
url http://eprints.utem.edu.my/id/eprint/20783/
https://plh.utem.edu.my/cgi-bin/koha/opac-detail.pl?biblionumber=104907
work_keys_str_mv AT limpohsiong afinancialanalysistoidentifyconstrainttoolsanditsoperationalimpacts
AT limpohsiong financialanalysistoidentifyconstrainttoolsanditsoperationalimpacts