Capacity Planning For Mixed-Load Tester Under Demand And Testing Time Uncertainty

Capacity planning is an important decision in production planning as it determines the capacity to install in order to satisfy customer demands and also to allocate products to those capacities.This research is based on mixed-load machine problem which is categorized by multiple products that can be...

全面介紹

書目詳細資料
主要作者: Asih, Hayati Mukti
格式: Thesis
語言:英语
英语
出版: 2018
主題:
在線閱讀:http://eprints.utem.edu.my/id/eprint/23390/
https://plh.utem.edu.my/cgi-bin/koha/opac-detail.pl?biblionumber=112887
Abstract Abstract here
_version_ 1855619926541205504
author Asih, Hayati Mukti
author_facet Asih, Hayati Mukti
author_sort Asih, Hayati Mukti
description Capacity planning is an important decision in production planning as it determines the capacity to install in order to satisfy customer demands and also to allocate products to those capacities.This research is based on mixed-load machine problem which is categorized by multiple products that can be processed simultaneously with different processing time.The problem is further complicated with high product varieties and high demand variabilities.This research was conducted based on a case company from a multinational manufacturing company in Malaysia that produces hard disk drives.The study focused on the automated testing process characterized by long lead time and high product variability.Each testing machine with 2880 slots is a mixed load tester with the ability to load and test multiple product families simultaneously.In addition,the uncertain demand and testing time makes the problem more challenging. Currently,the company’s issue is low tester utilization of about 71%,well below the target of 96%.The objective of this research is to improve tester utilization while achieving the production target under uncertain demand and testing time and also to determine the break-even point on the testers required.A novel approach of integrating a mathematical model,robust optimization model,genetic algorithm,simulation model and cost–volume –profit analysis was developed.Firstly,a mathematical model of mixed-load tester was formulated.Next,a set of discrete scenarios was proposed to address uncertain demand and testing time.A robust optimization and genetic algorithm model was developed to optimize the number of testers under the described uncertainties.Next,these scenarios were simulated using the Pro Model simulation software to validate the proposed models and to evaluate throughput and tester utilization.Finally,the cost–volume–profit analysis was performed for scenarios that require additional testers at various levels of uncertainties.The results showed that the proposed solution improved tester utilization by 25% compared to the current system.This research has contribution by developing novel hybrid methodology and able to provide useful insights to assist company’s managers to plan and allocate resources according to variations in customers’ demands and testing time.
format Thesis
id utem-23390
institution Universiti Teknikal Malaysia Melaka
language English
English
publishDate 2018
record_format EPrints
record_pdf Restricted
spelling utem-233902022-02-10T14:21:33Z http://eprints.utem.edu.my/id/eprint/23390/ Capacity Planning For Mixed-Load Tester Under Demand And Testing Time Uncertainty Asih, Hayati Mukti T Technology (General) TA Engineering (General). Civil engineering (General) Capacity planning is an important decision in production planning as it determines the capacity to install in order to satisfy customer demands and also to allocate products to those capacities.This research is based on mixed-load machine problem which is categorized by multiple products that can be processed simultaneously with different processing time.The problem is further complicated with high product varieties and high demand variabilities.This research was conducted based on a case company from a multinational manufacturing company in Malaysia that produces hard disk drives.The study focused on the automated testing process characterized by long lead time and high product variability.Each testing machine with 2880 slots is a mixed load tester with the ability to load and test multiple product families simultaneously.In addition,the uncertain demand and testing time makes the problem more challenging. Currently,the company’s issue is low tester utilization of about 71%,well below the target of 96%.The objective of this research is to improve tester utilization while achieving the production target under uncertain demand and testing time and also to determine the break-even point on the testers required.A novel approach of integrating a mathematical model,robust optimization model,genetic algorithm,simulation model and cost–volume –profit analysis was developed.Firstly,a mathematical model of mixed-load tester was formulated.Next,a set of discrete scenarios was proposed to address uncertain demand and testing time.A robust optimization and genetic algorithm model was developed to optimize the number of testers under the described uncertainties.Next,these scenarios were simulated using the Pro Model simulation software to validate the proposed models and to evaluate throughput and tester utilization.Finally,the cost–volume–profit analysis was performed for scenarios that require additional testers at various levels of uncertainties.The results showed that the proposed solution improved tester utilization by 25% compared to the current system.This research has contribution by developing novel hybrid methodology and able to provide useful insights to assist company’s managers to plan and allocate resources according to variations in customers’ demands and testing time. 2018 Thesis NonPeerReviewed text en http://eprints.utem.edu.my/id/eprint/23390/1/Capacity%20Planning%20For%20Mixed-Load%20Tester%20Under%20Demand%20And%20Testing%20Time%20Uncertainty.pdf text en http://eprints.utem.edu.my/id/eprint/23390/2/Capacity%20Planning%20For%20Mixed-Load%20Tester%20Under%20Demand%20And%20Testing%20Time%20Uncertainty.pdf Asih, Hayati Mukti (2018) Capacity Planning For Mixed-Load Tester Under Demand And Testing Time Uncertainty. Doctoral thesis, UTeM. https://plh.utem.edu.my/cgi-bin/koha/opac-detail.pl?biblionumber=112887
spellingShingle T Technology (General)
TA Engineering (General). Civil engineering (General)
Asih, Hayati Mukti
Capacity Planning For Mixed-Load Tester Under Demand And Testing Time Uncertainty
thesis_level Master
title Capacity Planning For Mixed-Load Tester Under Demand And Testing Time Uncertainty
title_full Capacity Planning For Mixed-Load Tester Under Demand And Testing Time Uncertainty
title_fullStr Capacity Planning For Mixed-Load Tester Under Demand And Testing Time Uncertainty
title_full_unstemmed Capacity Planning For Mixed-Load Tester Under Demand And Testing Time Uncertainty
title_short Capacity Planning For Mixed-Load Tester Under Demand And Testing Time Uncertainty
title_sort capacity planning for mixed load tester under demand and testing time uncertainty
topic T Technology (General)
TA Engineering (General). Civil engineering (General)
url http://eprints.utem.edu.my/id/eprint/23390/
https://plh.utem.edu.my/cgi-bin/koha/opac-detail.pl?biblionumber=112887
work_keys_str_mv AT asihhayatimukti capacityplanningformixedloadtesterunderdemandandtestingtimeuncertainty