Improvement of change glue schedule down time at lid attachment process for semiconductor devices
This research report presents the work done on the improvement of change glue schedule down time at lid attachment process for semiconductor devices. Lid attachment is the end of line process for Plastic Dual Small Outline Flat (PDSOF) package which is one of the semiconductor devices. The process...
| Main Author: | Abd Rahman, Rozeana |
|---|---|
| Format: | Thesis |
| Language: | English English |
| Published: |
UTeM
2017
|
| Subjects: | |
| Online Access: | http://eprints.utem.edu.my/id/eprint/23785/ https://plh.utem.edu.my/cgi-bin/koha/opac-detail.pl?biblionumber=109159 TJ211.42.L64 2017 |
| Abstract | Abstract here |
Similar Items
Lean manufacturing and OEE optimization of semiconductor industry through scheduled downtime reduction at testing process
by: Ho, Chee Huay
Published: (2016)
by: Ho, Chee Huay
Published: (2016)
Productivity improvement using overall equipment efficiency in semiconductor industry
by: Chinnappan, Ushananthini
Published: (2021)
by: Chinnappan, Ushananthini
Published: (2021)
Automation Of The Manual Task At Strip Test Process In Semiconductor Manufacturing
by: Teoh, Woei Sheng
Published: (2021)
by: Teoh, Woei Sheng
Published: (2021)
An improved fair nurse scheduling optimisation using particle swarm intelligent technique
by: Ramli, Mohamad Raziff
Published: (2015)
by: Ramli, Mohamad Raziff
Published: (2015)
A crystallographic optimization study in Ta TaN bi-layer sputtering to reduce semiconductor manufacturing queue time constraint
by: Ahmad, Anuar Fadzil
Published: (2022)
by: Ahmad, Anuar Fadzil
Published: (2022)
Headcount Optimization For Trim And Form Process At End Of Line Operation In Semiconductor Industry
by: Shafiei, Nuraini
Published: (2020)
by: Shafiei, Nuraini
Published: (2020)
Feasibility study on handheld devices-based augmented reality system for identification and inspection processes in manufacturing industry / Chiang Yoong Fatt
by: Chiang, Yoong Fatt
Published: (2019)
by: Chiang, Yoong Fatt
Published: (2019)
WIP control at end of line of semiconductor industry using CONWIP
by: Lim, Ke Sin
Published: (2014)
by: Lim, Ke Sin
Published: (2014)
Quality improvement in electrodeposition process of commercial vehicle using PDCA approach
by: Nabiilah, Ab Rahim
Published: (2018)
by: Nabiilah, Ab Rahim
Published: (2018)
Implementation of Kanban Systems through Auto Scheduling tools at Die Bond process
by: Sabah, Mariati
Published: (2016)
by: Sabah, Mariati
Published: (2016)
Smart control sampling system for metrology tool in semiconductor production line
by: Tan, Cheerrein Cher Ring
Published: (2021)
by: Tan, Cheerrein Cher Ring
Published: (2021)
Productivity improvement preventive actions for hard defect failure reduction at hard disk drive assembly process
by: Ramachandran, Eswari Devi
Published: (2014)
by: Ramachandran, Eswari Devi
Published: (2014)
The application of using time-driven activity-based costing in product operation and service operation
by: Sri Nur Areena, Mohd Zaini
Published: (2021)
by: Sri Nur Areena, Mohd Zaini
Published: (2021)
Time and cost study on cold-formed steel and reinforced concrete construction - a comparison
by: Hu, Wei Kiet
Published: (2008)
by: Hu, Wei Kiet
Published: (2008)
Remote global alignment error for cycle time improvement of pad inductor layer
by: Devadas, Saandilian
Published: (2018)
by: Devadas, Saandilian
Published: (2018)
Simulation Driven Design Of Automated Storage And Retrieval System (ASRS) : A Case Study In Semiconductor Manufacturing
by: Lim, Wen Chiang
Published: (2020)
by: Lim, Wen Chiang
Published: (2020)
A comparative study of activitybased costing (abc) and time-driven activity-based costing (tdabc) on cost accounting
by: Nurul Farahin, Zamrud
Published: (2021)
by: Nurul Farahin, Zamrud
Published: (2021)
Changeover time improvement of pressure die casting machine by single minute exchange of die implementation
by: Embok Resa, Mohammad Afif
Published: (2020)
by: Embok Resa, Mohammad Afif
Published: (2020)
A case study in electrical & electronic industry using mahalanobis-taguchi system and time-driven activity-based costing on production environment
by: Nik Nurharyantie, Nik Mohd Kamil
Published: (2021)
by: Nik Nurharyantie, Nik Mohd Kamil
Published: (2021)
The Application Of Strategic Cooling Technique In Bobbin Friction Stir Welding To Improve Weld Strength
by: Salehuddin, Syaidatul Syakirah
Published: (2021)
by: Salehuddin, Syaidatul Syakirah
Published: (2021)
The New Conceptual Model for the Net Benefits Improvement in the Intelligent Hanging Production System for Jeans in China
by: YARUI, HUO
Published: (2023)
by: YARUI, HUO
Published: (2023)
Investigation on improving mechanical properties of aluminium alloy sheet 5052-h32 for automotive application / Hidayat
by: Hidayat, -
Published: (2019)
by: Hidayat, -
Published: (2019)
Optimization-based simulation algorithm for predictive-reactive job-shop scheduling of reconfigurable manufacturing systems
by: Tan, Joe Yee
Published: (2022)
by: Tan, Joe Yee
Published: (2022)
Hybrid-discrete multi-objective particle swarm optimization for multi-objective job-shop scheduling
by: Anuar, Nurul Izah
Published: (2022)
by: Anuar, Nurul Izah
Published: (2022)
Job shop scheduling problem (JSSP)
by: Abdullah, Nurul Azma
Published: (2004)
by: Abdullah, Nurul Azma
Published: (2004)
Improvement of mobility and stability for small electric vehicle : integration of oversteering characteristic, four wheel drive and independent steering
by: Muhammad Izhar, Ishak
Published: (2016)
by: Muhammad Izhar, Ishak
Published: (2016)
Manufacturing process selection for pet bottles using analytical hierarchy process
by: Razali, Adibah
Published: (2013)
by: Razali, Adibah
Published: (2013)
Reduction of work in process and manufacturing lead time using value stream mapping in the medical industry
by: Nor Najwafatima, Yusaini
Published: (2023)
by: Nor Najwafatima, Yusaini
Published: (2023)
Design And Development Of Process And Production Plant For Agarwood Oil
by: Muhammad Nasardin, Norul Rasyidi
Published: (2018)
by: Muhammad Nasardin, Norul Rasyidi
Published: (2018)
Design of a thermoforming process for a semi-crystalline polymer
by: Farah Amira, Mohd Ghazali
Published: (2017)
by: Farah Amira, Mohd Ghazali
Published: (2017)
The development of a heat assisted section rolling process for strip
by: Mohd Zaidi, Sidek
Published: (2013)
by: Mohd Zaidi, Sidek
Published: (2013)
Change management strategies for the success of lean adoption
by: Muhammad Shafee, Nur Ain Qistina
Published: (2022)
by: Muhammad Shafee, Nur Ain Qistina
Published: (2022)
Bottleneck-based heuristic for three-machine flow shop scheduling
by: Abdul Rahim, Mohd Salleh
Published: (2011)
by: Abdul Rahim, Mohd Salleh
Published: (2011)
Optimisation of injection moulding process parameters using taguchi and desirability function
by: Vivekanandan, Panneerselvam
Published: (2020)
by: Vivekanandan, Panneerselvam
Published: (2020)
Investigation on paint removal operation using multiple passes in waterjet cleaning process
by: Mohd Nazir, Mat Nawi
Published: (2021)
by: Mohd Nazir, Mat Nawi
Published: (2021)
Real Time Production Monitoring System
by: Siva Kumar, Subramaniam
Published: (2009)
by: Siva Kumar, Subramaniam
Published: (2009)
Investigation of surface metal matrix composites of reinforced aluminium alloy produced using friction stir processing
by: Che Dini Marini, Che Mohammad Ishkandar El-Rahimin
Published: (2020)
by: Che Dini Marini, Che Mohammad Ishkandar El-Rahimin
Published: (2020)
Productivity improvement of mark, scan and pack process through lean Six Sigma
by: Sapee, Mohd Sukri Sazlan
Published: (2018)
by: Sapee, Mohd Sukri Sazlan
Published: (2018)
An Application Of Statistical Quality Control On Process Improvement: Case Study In Stayrod Manufacturing
by: Norhidayah, Mohamed Hussin
Published: (2010)
by: Norhidayah, Mohamed Hussin
Published: (2010)
A study of yield quantity discrepancy reduction in semi-conductor back-end process / Allina Binti Abdullah.
by: Allina, Abdullah
Published: (2011)
by: Allina, Abdullah
Published: (2011)
Similar Items
-
Lean manufacturing and OEE optimization of semiconductor industry through scheduled downtime reduction at testing process
by: Ho, Chee Huay
Published: (2016) -
Productivity improvement using overall equipment efficiency in semiconductor industry
by: Chinnappan, Ushananthini
Published: (2021) -
Automation Of The Manual Task At Strip Test Process In Semiconductor Manufacturing
by: Teoh, Woei Sheng
Published: (2021) -
An improved fair nurse scheduling optimisation using particle swarm intelligent technique
by: Ramli, Mohamad Raziff
Published: (2015) -
A crystallographic optimization study in Ta TaN bi-layer sputtering to reduce semiconductor manufacturing queue time constraint
by: Ahmad, Anuar Fadzil
Published: (2022)
