Automatic Data Extraction And Management Through Integration With Database At RPT Lab Infineon Technologies

Due to increase in demand and request for reliability qualification and evaluation, Reliability Product Testing (RPT) Lab in Infineon Technologies also outsource electrical testing process at available production testers at production block. However, electrical testing cannot be done through Reliabi...

Full description

Bibliographic Details
Main Author: Hamdan, Mohd Syamil
Format: Thesis
Language:English
English
Published: 2020
Subjects:
Online Access:http://eprints.utem.edu.my/id/eprint/25571/
https://plh.utem.edu.my/cgi-bin/koha/opac-detail.pl?biblionumber=119195
Abstract Abstract here
_version_ 1855619771724201984
author Hamdan, Mohd Syamil
author_facet Hamdan, Mohd Syamil
author_sort Hamdan, Mohd Syamil
description Due to increase in demand and request for reliability qualification and evaluation, Reliability Product Testing (RPT) Lab in Infineon Technologies also outsource electrical testing process at available production testers at production block. However, electrical testing cannot be done through Reliability Evaluation and Logistic Information System (REALIS), instead, it has to be done offline. Due to this certain limitation and condition, data log is sometimes unable to be generated by testers, hence effort and time of operator or technician who conduct the electrical test is wasted. Bound with critical timeline to meet customer demand, missing data log is a huge loss in effort, energy, time and cost for RPT. The main objectives of this research is to identify root cause of data log not able to be produced when test is completed. Apart from that, this study is to optimize existing workflow in preparing the data logs that comply with RPT standard format and are readable by customers. Last but not least, aim of this research is to evaluate the overall benefit of the proposed system. Ishikawa fishbone diagram, flow chart, time study and survey are used to execute the objectives. After the implementation of new flow system, the average rate of missing data log has been significantly reduced and eliminated. The lead time of preparing the data log process has been tremendously reduced to half, from 83.5 minutes/lot to 44.9 minutes/lot. The number of software and application used are also reduced from six to two. Positive feedback from operation team on user-friendliness, efficiency and ergonomic topic have been highlighted and discovered.
format Thesis
id utem-25571
institution Universiti Teknikal Malaysia Melaka
language English
English
publishDate 2020
record_format EPrints
record_pdf Restricted
spelling utem-255712022-01-06T13:21:48Z http://eprints.utem.edu.my/id/eprint/25571/ Automatic Data Extraction And Management Through Integration With Database At RPT Lab Infineon Technologies Hamdan, Mohd Syamil T Technology (General) TS Manufactures Due to increase in demand and request for reliability qualification and evaluation, Reliability Product Testing (RPT) Lab in Infineon Technologies also outsource electrical testing process at available production testers at production block. However, electrical testing cannot be done through Reliability Evaluation and Logistic Information System (REALIS), instead, it has to be done offline. Due to this certain limitation and condition, data log is sometimes unable to be generated by testers, hence effort and time of operator or technician who conduct the electrical test is wasted. Bound with critical timeline to meet customer demand, missing data log is a huge loss in effort, energy, time and cost for RPT. The main objectives of this research is to identify root cause of data log not able to be produced when test is completed. Apart from that, this study is to optimize existing workflow in preparing the data logs that comply with RPT standard format and are readable by customers. Last but not least, aim of this research is to evaluate the overall benefit of the proposed system. Ishikawa fishbone diagram, flow chart, time study and survey are used to execute the objectives. After the implementation of new flow system, the average rate of missing data log has been significantly reduced and eliminated. The lead time of preparing the data log process has been tremendously reduced to half, from 83.5 minutes/lot to 44.9 minutes/lot. The number of software and application used are also reduced from six to two. Positive feedback from operation team on user-friendliness, efficiency and ergonomic topic have been highlighted and discovered. 2020 Thesis NonPeerReviewed text en http://eprints.utem.edu.my/id/eprint/25571/1/Automatic%20Data%20Extraction%20And%20Management%20Through%20Integration%20With%20Database%20At%20RPT%20Lab%20Infineon%20Technologies.pdf text en http://eprints.utem.edu.my/id/eprint/25571/2/Automatic%20Data%20Extraction%20And%20Management%20Through%20Integration%20With%20Database%20At%20RPT%20Lab%20Infineon%20Technologies.pdf Hamdan, Mohd Syamil (2020) Automatic Data Extraction And Management Through Integration With Database At RPT Lab Infineon Technologies. Masters thesis, Universiti Teknikal Malaysia Melaka. https://plh.utem.edu.my/cgi-bin/koha/opac-detail.pl?biblionumber=119195
spellingShingle T Technology (General)
TS Manufactures
Hamdan, Mohd Syamil
Automatic Data Extraction And Management Through Integration With Database At RPT Lab Infineon Technologies
thesis_level Master
title Automatic Data Extraction And Management Through Integration With Database At RPT Lab Infineon Technologies
title_full Automatic Data Extraction And Management Through Integration With Database At RPT Lab Infineon Technologies
title_fullStr Automatic Data Extraction And Management Through Integration With Database At RPT Lab Infineon Technologies
title_full_unstemmed Automatic Data Extraction And Management Through Integration With Database At RPT Lab Infineon Technologies
title_short Automatic Data Extraction And Management Through Integration With Database At RPT Lab Infineon Technologies
title_sort automatic data extraction and management through integration with database at rpt lab infineon technologies
topic T Technology (General)
TS Manufactures
url http://eprints.utem.edu.my/id/eprint/25571/
https://plh.utem.edu.my/cgi-bin/koha/opac-detail.pl?biblionumber=119195
work_keys_str_mv AT hamdanmohdsyamil automaticdataextractionandmanagementthroughintegrationwithdatabaseatrptlabinfineontechnologies