Optimization-based simulation algorithm for predictive-reactive job-shop scheduling of reconfigurable manufacturing systems
Manufacturing industry is now moving forward rapidly towards reconfigurability and reliability to meet the hard-to-predict global business market, especially job-shop production. However, even there is a proper planned schedule for production, and there is also technique for scheduling in Reconfigur...
| المؤلف الرئيسي: | Tan, Joe Yee |
|---|---|
| التنسيق: | أطروحة |
| اللغة: | الإنجليزية الإنجليزية |
| منشور في: |
2022
|
| الموضوعات: | |
| الوصول للمادة أونلاين: | http://eprints.utem.edu.my/id/eprint/26973/ https://plh.utem.edu.my/cgi-bin/koha/opac-detail.pl?biblionumber=122230 |
| Abstract | Abstract here |
مواد مشابهة
Job shop scheduling problem (JSSP)
حسب: Abdullah, Nurul Azma
منشور في: (2004)
حسب: Abdullah, Nurul Azma
منشور في: (2004)
Hybrid-discrete multi-objective particle swarm optimization for multi-objective job-shop scheduling
حسب: Anuar, Nurul Izah
منشور في: (2022)
حسب: Anuar, Nurul Izah
منشور في: (2022)
Predictive and reactive algorithms for job shop scheduling problems
حسب: Nababan Erna Budhiarti
منشور في: (2023)
حسب: Nababan Erna Budhiarti
منشور في: (2023)
A Layout Optimization Approach For Reconfigurable Conveyor System Using Simulation Technology
حسب: Ling, Yee Ni
منشور في: (2020)
حسب: Ling, Yee Ni
منشور في: (2020)
Development Of Overall Performance Effectiveness In Job Shop Manufacturing Process
حسب: Teoh, Yong Siang
منشور في: (2018)
حسب: Teoh, Yong Siang
منشور في: (2018)
Lean manufacturing and OEE optimization of semiconductor industry through scheduled downtime reduction at testing process
حسب: Ho, Chee Huay
منشور في: (2016)
حسب: Ho, Chee Huay
منشور في: (2016)
Hybrid POLCA in a job shop environment
حسب: How, Whee Ching
منشور في: (2017)
حسب: How, Whee Ching
منشور في: (2017)
Bottleneck-based heuristic for three-machine flow shop scheduling
حسب: Abdul Rahim, Mohd Salleh
منشور في: (2011)
حسب: Abdul Rahim, Mohd Salleh
منشور في: (2011)
Springback prediction in sheet metal forming: constitutive equations, finite element simulations and experimental validation
حسب: Jasri, Mohamad
منشور في: (2013)
حسب: Jasri, Mohamad
منشور في: (2013)
Bottleneck adjacent matching heuristics for scheduling a re-entrant flow shop with dominant machine problem
حسب: Sh Ahmad, Sh Salleh
منشور في: (2009)
حسب: Sh Ahmad, Sh Salleh
منشور في: (2009)
Production scheduling system for job shop enterprise using ant colony optimization approach
منشور في: (2025)
منشور في: (2025)
Job shop conversion of manufacturing system to cellular manufacturing
حسب: Hamza, Sanaa Ali
منشور في: (2024)
حسب: Hamza, Sanaa Ali
منشور في: (2024)
Simulated Kalman Filter algorithms for solving optimization problems
حسب: Nor Hidayati, Abdul Aziz
منشور في: (2019)
حسب: Nor Hidayati, Abdul Aziz
منشور في: (2019)
Analysis of additive manufacturing (AM) multi material behaviour using numerical simulation with experimental verification
حسب: Abd Rahman, Azri Rahimi
منشور في: (2025)
حسب: Abd Rahman, Azri Rahimi
منشور في: (2025)
Development Of Simulator Training Centre For The Manufacturing Of Automative Seating
حسب: Zainul Abidin, Siti Nursyafiqa
منشور في: (2017)
حسب: Zainul Abidin, Siti Nursyafiqa
منشور في: (2017)
Electronic manufacturing industry in Asia
حسب: Chai, Shin Wang
منشور في: (2013)
حسب: Chai, Shin Wang
منشور في: (2013)
Design and simulation of proposed automation system in existing manufacturing work environment
حسب: Salam, Zainila
منشور في: (2013)
حسب: Salam, Zainila
منشور في: (2013)
Public Electricity Provision and Performance of Manufacturing Firms in Nigeria
حسب: Tata, Ibrahim Abba
منشور في: (2012)
حسب: Tata, Ibrahim Abba
منشور في: (2012)
Optimization Of Dynamic Transportation Task Assignment In A Manufacturing Facility
حسب: Tugiman, Muhammad Najib
منشور في: (2020)
حسب: Tugiman, Muhammad Najib
منشور في: (2020)
Critical Success Factor of Six Sigma Implementation in Manufacturing Industry
حسب: Nor Zilawati, Ismail
منشور في: (2011)
حسب: Nor Zilawati, Ismail
منشور في: (2011)
Vehicle color glossiness study using SPC in an automotive manufacturing company
حسب: A. R., Razali
منشور في: (2004)
حسب: A. R., Razali
منشور في: (2004)
Manufacturing process selection for pet bottles using analytical hierarchy process
حسب: Razali, Adibah
منشور في: (2013)
حسب: Razali, Adibah
منشور في: (2013)
Development of a simulation-based decision support model for high precision component manufacturer
حسب: Gan, Sin Yi
منشور في: (2013)
حسب: Gan, Sin Yi
منشور في: (2013)
Process optimization in rubber injection moulding manufacturing / Ng Yeow Chian
حسب: Ng, Yeow Chian
منشور في: (2019)
حسب: Ng, Yeow Chian
منشور في: (2019)
Computational fluid dynamic simulation of abrasive waterjet nozzle erosion
حسب: Naqib Hakim, Kamarudin
منشور في: (2020)
حسب: Naqib Hakim, Kamarudin
منشور في: (2020)
Enhancement of lean manufacturing implementation based on decision support system using simulation and intelligent agent
حسب: Ibrahim, Mohamad Amran
منشور في: (2017)
حسب: Ibrahim, Mohamad Amran
منشور في: (2017)
Integration framework of simulation-based data analytics and Internet of Things for lean manufacturing decision-making
حسب: Abd Rahman, Mohd Soufhwee
منشور في: (2022)
حسب: Abd Rahman, Mohd Soufhwee
منشور في: (2022)
Board structures, ownership structure and firm value in Malaysian public listed manufacturing companies
حسب: Lee, Wen Chiat
منشور في: (2011)
حسب: Lee, Wen Chiat
منشور في: (2011)
A Study on Critical Success Factors (CSFs) of Soft Technology Implementation in Manufacturing Companies
حسب: Zuraida, Muhammad Hashim
منشور في: (2012)
حسب: Zuraida, Muhammad Hashim
منشور في: (2012)
Product Disassembly Planning Using Design For Disassembly and Genetic Algorithm
حسب: Lau, Lee Lyn
منشور في: (2006)
حسب: Lau, Lee Lyn
منشور في: (2006)
Relationship among lean manufacturing practices, ISO 14001 and environmental performance in Malaysian automotive suppliers
حسب: Siti Norhafizan Hibadullah
منشور في: (2015)
حسب: Siti Norhafizan Hibadullah
منشور في: (2015)
Simulation Driven Design Of Automated Storage And Retrieval System (ASRS) : A Case Study In Semiconductor Manufacturing
حسب: Lim, Wen Chiang
منشور في: (2020)
حسب: Lim, Wen Chiang
منشور في: (2020)
The development of a hybrid knowledge-based system for designing a low volume automotive manufacturing environment
حسب: N. M. Zuki, N. M.
منشور في: (2012)
حسب: N. M. Zuki, N. M.
منشور في: (2012)
Simulation of wire and arc additive manufacturing of 308L stainless steel with coldarc gas metal arc welding
حسب: Mohd Jmmani, Nur Aisyah Nabilah
منشور في: (2021)
حسب: Mohd Jmmani, Nur Aisyah Nabilah
منشور في: (2021)
4 axis machining simulation routines via application programming interface (API) in cam systems
حسب: Mohamad Hafiz, Mohamad
منشور في: (2021)
حسب: Mohamad Hafiz, Mohamad
منشور في: (2021)
Green supply chain management and sustainable performance among certified manufacturing firms in Malaysia: the mediating effect of social capital
حسب: Che Sobry, Suheil
منشور في: (2022)
حسب: Che Sobry, Suheil
منشور في: (2022)
Optimizing the changeover of packaging machine by implementing single minute exchange of dies in textile manufacturing industry
حسب: Rosli, Mohamad Muzammir
منشور في: (2016)
حسب: Rosli, Mohamad Muzammir
منشور في: (2016)
Implementation of flexible manufacturing system in a fertilizer plant to reduce inventory and waste : a case study / Chien Wei Ee.
حسب: Chien, Wei Ee
منشور في: (2011)
حسب: Chien, Wei Ee
منشور في: (2011)
Feasibility study on handheld devices-based augmented reality system for identification and inspection processes in manufacturing industry / Chiang Yoong Fatt
حسب: Chiang, Yoong Fatt
منشور في: (2019)
حسب: Chiang, Yoong Fatt
منشور في: (2019)
Implementation of Kanban Systems through Auto Scheduling tools at Die Bond process
حسب: Sabah, Mariati
منشور في: (2016)
حسب: Sabah, Mariati
منشور في: (2016)
مواد مشابهة
-
Job shop scheduling problem (JSSP)
حسب: Abdullah, Nurul Azma
منشور في: (2004) -
Hybrid-discrete multi-objective particle swarm optimization for multi-objective job-shop scheduling
حسب: Anuar, Nurul Izah
منشور في: (2022) -
Predictive and reactive algorithms for job shop scheduling problems
حسب: Nababan Erna Budhiarti
منشور في: (2023) -
A Layout Optimization Approach For Reconfigurable Conveyor System Using Simulation Technology
حسب: Ling, Yee Ni
منشور في: (2020) -
Development Of Overall Performance Effectiveness In Job Shop Manufacturing Process
حسب: Teoh, Yong Siang
منشور في: (2018)
