Cost effectiveness comparison of pre-fabrication with conventional construction method for RMAF ground defense bunker
Pre-fabrication construction method is not new in Malaysian construction industry yet the utilization of such method still relatively low. Government should conduct thorough study of pre-fabrication method aspects and implement it widely especially for government based projects including national se...
| Auteur principal: | Tan, Swee Kok |
|---|---|
| Format: | Thèse |
| Langue: | anglais |
| Publié: |
2010
|
| Sujets: | |
| Accès en ligne: | http://eprints.utm.my/10636/6/TanSweeKokMFKA2010.pdf |
Documents similaires
Economic comparison of industrialized building system with conventional system through cost estimation using building information modeling
par: Faghirinejadfard, Amir
Publié: (2014)
par: Faghirinejadfard, Amir
Publié: (2014)
Comparing conventional to industrialised building system construction costing : a case study of school building projects
par: Abdul Aziz, Zuraidah
Publié: (2012)
par: Abdul Aziz, Zuraidah
Publié: (2012)
Life cycle costing of industrialized building system and conventional building system
par: Ali Naji Al-Attabi, Ali Mohammed
Publié: (2014)
par: Ali Naji Al-Attabi, Ali Mohammed
Publié: (2014)
A study on comparison between solar cooling system and conventional cooling system
par: Jamaluddin, Nur Fateha
Publié: (2013)
par: Jamaluddin, Nur Fateha
Publié: (2013)
Implementation of microsoft project to improve conventional construction reporting system
par: Liew , Eric Cheok Fai
Publié: (2004)
par: Liew , Eric Cheok Fai
Publié: (2004)
Pre-award interest in construction arbitration
par: Hiew, Fong Poh
Publié: (2010)
par: Hiew, Fong Poh
Publié: (2010)
A study of problems during construction stage for conventional housing project
par: Chong , Voon Yaw
Publié: (2004)
par: Chong , Voon Yaw
Publié: (2004)
Profiling of valid available grounds to claim extension of time in construction industry
par: Lam, Tian Sui
Publié: (2020)
par: Lam, Tian Sui
Publié: (2020)
Cost of compliance with safety and health requirements in construction site
par: Sulong, Akmal Wani
Publié: (2009)
par: Sulong, Akmal Wani
Publié: (2009)
Comparison of collateral warranty and indemnity in construction contract
par: Mohd. Zin, Nurshafeeqah
Publié: (2013)
par: Mohd. Zin, Nurshafeeqah
Publié: (2013)
Effectiveness of defensive driving among commercial truck drivers: a case study at MISC integrated Logistics Sdn. Bhd. (MILS)
par: Md. Mahdzir, Afwan Hakim
Publié: (2013)
par: Md. Mahdzir, Afwan Hakim
Publié: (2013)
An evaluation of effectiveness of approximate quantity method in estimating construction cost
par: Siew, Sik Nguong
Publié: (2013)
par: Siew, Sik Nguong
Publié: (2013)
Sustainable construction materials and assemblies for Nigerian low cost housing
par: Alhaji Saba, Liman
Publié: (2018)
par: Alhaji Saba, Liman
Publié: (2018)
Reviewing the project delivery systems used in Malaysia Construction Industry : focus on the conventional method and the design and build method
par: Tee, Beng Hock
Publié: (2000)
par: Tee, Beng Hock
Publié: (2000)
Analysis of factors affecting the accuracy of early cost estimate in construction projects
par: Woyowarsito, Dodi Ardianto
Publié: (2011)
par: Woyowarsito, Dodi Ardianto
Publié: (2011)
Comparison between construction contract used for governmnet projects in Indonesia and Malaysia
par: Soewendo, Adi Argo
Publié: (2011)
par: Soewendo, Adi Argo
Publié: (2011)
Inventory rationalisation in RMAF - a case study
par: Leong, Angeline Yee Hoong
Publié: (2007)
par: Leong, Angeline Yee Hoong
Publié: (2007)
Wing-in-ground for rescue operation in Kepulauan Riau
par: Prayetno, Eko
Publié: (2013)
par: Prayetno, Eko
Publié: (2013)
Contractor’s liability under unforeseen ground conditions
par: Permana, Assad Idea
Publié: (2015)
par: Permana, Assad Idea
Publié: (2015)
Cost control in construction phase in joint operation contractors : a case study of joint operation contractors in Sumatera Indonesia
par: Muhammad Yuwono, Aditya
Publié: (2011)
par: Muhammad Yuwono, Aditya
Publié: (2011)
Modelling of ground penetrating radar backscatter for water pipeline leakage detection
par: Lee, Le Ming
Publié: (2019)
par: Lee, Le Ming
Publié: (2019)
Interference: dispute associated with determination of own employment by contractor in construction
par: Kok, Wing Yan
Publié: (2017)
par: Kok, Wing Yan
Publié: (2017)
Computerised building cost estimating system
par: Marjuki, Mofti
Publié: (2006)
par: Marjuki, Mofti
Publié: (2006)
Hidden Cost In Building Conservation Works
par: Wee, Li Woon
Publié: (2011)
par: Wee, Li Woon
Publié: (2011)
The structural response of a bunker subjected to blast loading
par: Mohd Pilus, Mohd Nordin
Publié: (2007)
par: Mohd Pilus, Mohd Nordin
Publié: (2007)
Optimization of liquefied natural gas bunkering vessel design
par: Muhammad, Hamedullah
Publié: (2018)
par: Muhammad, Hamedullah
Publié: (2018)
The Influence Of Uncertainty Variables On
Project Cost Estimation
par: Rauzana, Anita
Publié: (2015)
par: Rauzana, Anita
Publié: (2015)
Maintenance management problems in low-cost flats
par: Goh, Keng Chai
Publié: (2003)
par: Goh, Keng Chai
Publié: (2003)
Assessing loss and expenses claim by prolongation cost
par: Ramli, Raiha Azene
Publié: (2015)
par: Ramli, Raiha Azene
Publié: (2015)
Constructability comparison between IBS and conventional construction
par: Harirchian, Ehsan
Publié: (2015)
par: Harirchian, Ehsan
Publié: (2015)
Cost planning in water resources infrastructure maintenance project
par: Rachmadi, Erwando
Publié: (2011)
par: Rachmadi, Erwando
Publié: (2011)
Information management to integrate cost and schedule for infrastructure projects
par: Chung , Keat Wei
Publié: (2004)
par: Chung , Keat Wei
Publié: (2004)
Application of BIM in early stage design cost estimation
par: Maskuriy, Raihan
Publié: (2014)
par: Maskuriy, Raihan
Publié: (2014)
Claims for additional preliminaries costs due to project prolongation
par: Saidin, Aminuddin
Publié: (2015)
par: Saidin, Aminuddin
Publié: (2015)
Integration of building maintenance cost model into the design stage
par: Islam, Md. Rashidul
Publié: (2018)
par: Islam, Md. Rashidul
Publié: (2018)
Construction coordination activities in local construction industry
par: Lau , Guan Heng
Publié: (2004)
par: Lau , Guan Heng
Publié: (2004)
Cost-benefit analysis of sediment management in Sutami Dam, East Java, Indonesia
par: Ardianto, Didik
Publié: (2011)
par: Ardianto, Didik
Publié: (2011)
Construction insurance
par: Lim, Wan Wei
Publié: (2010)
par: Lim, Wan Wei
Publié: (2010)
Profiling of termination grounds in construction contract
par: Liew, Sock Tin
Publié: (2018)
par: Liew, Sock Tin
Publié: (2018)
Constructability database knowledge model and guidelines of industrial plant at construction stage
par: Bakti, Erman Surya
Publié: (2012)
par: Bakti, Erman Surya
Publié: (2012)
Documents similaires
-
Economic comparison of industrialized building system with conventional system through cost estimation using building information modeling
par: Faghirinejadfard, Amir
Publié: (2014) -
Comparing conventional to industrialised building system construction costing : a case study of school building projects
par: Abdul Aziz, Zuraidah
Publié: (2012) -
Life cycle costing of industrialized building system and conventional building system
par: Ali Naji Al-Attabi, Ali Mohammed
Publié: (2014) -
A study on comparison between solar cooling system and conventional cooling system
par: Jamaluddin, Nur Fateha
Publié: (2013) -
Implementation of microsoft project to improve conventional construction reporting system
par: Liew , Eric Cheok Fai
Publié: (2004)