Improving time estimation in JKR project

Accurate time estimation is very critical to ensure smooth operation and timely completion of any construction project delivery. In determining the time of the project completion the only known methodology currently used by JKR is based on prediction from the experience of completing past project. H...

詳細記述

書誌詳細
第一著者: Hasan, Muhamad Khair
フォーマット: 学位論文
言語:英語
出版事項: 2010
主題:
オンライン・アクセス:http://eprints.utm.my/15436/6/MuhamadKhairHasan2010.pdf
_version_ 1846215522497069056
author Hasan, Muhamad Khair
author_facet Hasan, Muhamad Khair
author_sort Hasan, Muhamad Khair
description Accurate time estimation is very critical to ensure smooth operation and timely completion of any construction project delivery. In determining the time of the project completion the only known methodology currently used by JKR is based on prediction from the experience of completing past project. However evidently the project delay issues are very common for JKR projects. Many reasons contributed to this phenomenon. One of such reasons is that the time estimation process done by JKR might no be accurate. To understand further of such issue this study has been for carry out with the aim to determine the cause of the delay that lead with the slippage time from the original estimate. This study has benefited from thousands of data available from JKR SKALA’s database. Other methodologies adopted include the used of questionnaire survey distributed to JKR personnel and contractors. The findings of this study has determined the major factors that contributed to the delay. Comparisons was made for the findings from different sources. Factors that can contributed for improving JKR project time estimating process had also been identified. Various comparison have been made on the trend of the delay with regard to time factor, project size and location. The information generated from this study can provide a very useful guide for JKR in planning the more reliable project duration in future.
format Thesis
id uthm-15436
institution Universiti Teknologi Malaysia
language English
publishDate 2010
record_format eprints
spelling uthm-154362017-09-19T03:39:20Z http://eprints.utm.my/15436/ Improving time estimation in JKR project Hasan, Muhamad Khair TA Engineering (General). Civil engineering (General) Accurate time estimation is very critical to ensure smooth operation and timely completion of any construction project delivery. In determining the time of the project completion the only known methodology currently used by JKR is based on prediction from the experience of completing past project. However evidently the project delay issues are very common for JKR projects. Many reasons contributed to this phenomenon. One of such reasons is that the time estimation process done by JKR might no be accurate. To understand further of such issue this study has been for carry out with the aim to determine the cause of the delay that lead with the slippage time from the original estimate. This study has benefited from thousands of data available from JKR SKALA’s database. Other methodologies adopted include the used of questionnaire survey distributed to JKR personnel and contractors. The findings of this study has determined the major factors that contributed to the delay. Comparisons was made for the findings from different sources. Factors that can contributed for improving JKR project time estimating process had also been identified. Various comparison have been made on the trend of the delay with regard to time factor, project size and location. The information generated from this study can provide a very useful guide for JKR in planning the more reliable project duration in future. 2010-12 Thesis NonPeerReviewed application/pdf en http://eprints.utm.my/15436/6/MuhamadKhairHasan2010.pdf Hasan, Muhamad Khair (2010) Improving time estimation in JKR project. Masters thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering.
spellingShingle TA Engineering (General). Civil engineering (General)
Hasan, Muhamad Khair
Improving time estimation in JKR project
title Improving time estimation in JKR project
title_full Improving time estimation in JKR project
title_fullStr Improving time estimation in JKR project
title_full_unstemmed Improving time estimation in JKR project
title_short Improving time estimation in JKR project
title_sort improving time estimation in jkr project
topic TA Engineering (General). Civil engineering (General)
url http://eprints.utm.my/15436/6/MuhamadKhairHasan2010.pdf
url-record http://eprints.utm.my/15436/
work_keys_str_mv AT hasanmuhamadkhair improvingtimeestimationinjkrproject