Force majeure in extension of time

Time is extremely important issue in construction. Most of construction contract specify time to complete the construction work. However, during the execution of the contract, circumstances may arise and leads to delay. In circumstances that delay occurs, the employer is entitled to claim for damage...

全面介紹

書目詳細資料
主要作者: Sanis, Kathleen
格式: Thesis
語言:英语
出版: 2008
主題:
在線閱讀:http://eprints.utm.my/18024/1/KathleenSanisMFAB2008.pdf
_version_ 1846215656023785472
author Sanis, Kathleen
author_facet Sanis, Kathleen
author_sort Sanis, Kathleen
description Time is extremely important issue in construction. Most of construction contract specify time to complete the construction work. However, during the execution of the contract, circumstances may arise and leads to delay. In circumstances that delay occurs, the employer is entitled to claim for damages but time of completion also can be extended if the delay is caused by the relevant event which provided in extension of time provision in construction contract. One of the relevant events is force majeure. What is the definition of force majeure that applies in construction contract What are the circumstances that are accepted as force majuere event in claiming for extension of time The study aimed is to determine the meaning of a force majeure clause as the relevant events of extension of time. The findings of this study will assist to reduce uncertainty or difficulties in the event that relate to claiming of extension of time under the event of force majeure. The approach adopted in this research is law based cases. There are no limitations as for the court cases referred to in this study in terms of type of projects as long as the case is related to the force majeure event in claiming of extension of time. A total of six cases focusing on what is the interpretation of force majeure were studied. Through the analysis of court’s judgments, the meaning of force majeure in extension of time have been determined. Force majeure means all circumstances independent of will of man, and which it is not in his power to control or responsibility which is caused by a superior force or irresistible force or overwhelming power.
format Thesis
id uthm-18024
institution Universiti Teknologi Malaysia
language English
publishDate 2008
record_format eprints
spelling uthm-180242021-08-26T15:53:11Z http://eprints.utm.my/18024/ Force majeure in extension of time Sanis, Kathleen H Social Sciences (General) Time is extremely important issue in construction. Most of construction contract specify time to complete the construction work. However, during the execution of the contract, circumstances may arise and leads to delay. In circumstances that delay occurs, the employer is entitled to claim for damages but time of completion also can be extended if the delay is caused by the relevant event which provided in extension of time provision in construction contract. One of the relevant events is force majeure. What is the definition of force majeure that applies in construction contract What are the circumstances that are accepted as force majuere event in claiming for extension of time The study aimed is to determine the meaning of a force majeure clause as the relevant events of extension of time. The findings of this study will assist to reduce uncertainty or difficulties in the event that relate to claiming of extension of time under the event of force majeure. The approach adopted in this research is law based cases. There are no limitations as for the court cases referred to in this study in terms of type of projects as long as the case is related to the force majeure event in claiming of extension of time. A total of six cases focusing on what is the interpretation of force majeure were studied. Through the analysis of court’s judgments, the meaning of force majeure in extension of time have been determined. Force majeure means all circumstances independent of will of man, and which it is not in his power to control or responsibility which is caused by a superior force or irresistible force or overwhelming power. 2008 Thesis NonPeerReviewed application/pdf en http://eprints.utm.my/18024/1/KathleenSanisMFAB2008.pdf Sanis, Kathleen (2008) Force majeure in extension of time. Masters thesis, Universiti Teknologi Malaysia, Faculty of Built Environment. http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:134742
spellingShingle H Social Sciences (General)
Sanis, Kathleen
Force majeure in extension of time
title Force majeure in extension of time
title_full Force majeure in extension of time
title_fullStr Force majeure in extension of time
title_full_unstemmed Force majeure in extension of time
title_short Force majeure in extension of time
title_sort force majeure in extension of time
topic H Social Sciences (General)
url http://eprints.utm.my/18024/1/KathleenSanisMFAB2008.pdf
url-record http://eprints.utm.my/18024/
http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:134742
work_keys_str_mv AT saniskathleen forcemajeureinextensionoftime