Buildability in bridge construction : case study of Sungai Johor cable-stayed bridge
Nowadays, construction projects are becoming much more complex and difficult which include the bridge project. Thus, delay in project duration and overrun in project cost becomes a common occurrence which sometime the quality and safety aspect also been affected. Previous studies show that one of th...
| المؤلف الرئيسي: | Zahidi, Mardiyah |
|---|---|
| التنسيق: | أطروحة |
| اللغة: | الإنجليزية |
| منشور في: |
2009
|
| الموضوعات: | |
| الوصول للمادة أونلاين: | http://eprints.utm.my/18183/1/MardiyahZahidiMFKA2009.pdf |
مواد مشابهة
Fatigue of cable anchorages on a cable-stayed bridge
حسب: Nor Ashikin, Muhamad Khairussaleh
منشور في: (2016)
حسب: Nor Ashikin, Muhamad Khairussaleh
منشور في: (2016)
Appraisal and performance prediction of Senai-Desaru expressway cable-stayed bridge subject to earthquakes
حسب: Aizon, Nabila Huda
منشور في: (2021)
حسب: Aizon, Nabila Huda
منشور في: (2021)
Seismic behaviour investigation of a cable-stayed bridge with hybrid passive control system / Ahad Javanmardi
حسب: Ahad , Javanmardi
منشور في: (2019)
حسب: Ahad , Javanmardi
منشور في: (2019)
Parametric study on the static behaviour of radiating-type steel cable-stayed bridges
حسب: Yap, Choy Keen
منشور في: (2002)
حسب: Yap, Choy Keen
منشور في: (2002)
Effects Of Cable Diameter Reduction And Snapping On The Behavior Of Cable-Stayed Bridges
حسب: Ajaj, Sayed Mahamed
منشور في: (2007)
حسب: Ajaj, Sayed Mahamed
منشور في: (2007)
The characteristics of a sustainable bridge: a case study of Second Penang Bridge
حسب: Ansari, Reza
منشور في: (2013)
حسب: Ansari, Reza
منشور في: (2013)
Implementing numerical simulation for static and dynamic loading of cable-stayed Penang Bridge
حسب: Mohammed, Mohammed Idris
منشور في: (2016)
حسب: Mohammed, Mohammed Idris
منشور في: (2016)
Construction of precast segmental box girder bridge using overhead gantry - a case study
حسب: Salleh @ Mohamed Salleh, Jazlan
منشور في: (2006)
حسب: Salleh @ Mohamed Salleh, Jazlan
منشور في: (2006)
Seismic vulnerability study of guillemard railway bridge
حسب: Teow, Ching Ching
منشور في: (2008)
حسب: Teow, Ching Ching
منشور في: (2008)
Performance of integral bridge with various span lengths
حسب: Tuan Abdul Manaf, Tuan Khusairry
منشور في: (2014)
حسب: Tuan Abdul Manaf, Tuan Khusairry
منشور في: (2014)
Condition assessment of reinforced concrete : bridge structure
حسب: M. Saeed, Aseel Abdulhaleem
منشور في: (2019)
حسب: M. Saeed, Aseel Abdulhaleem
منشور في: (2019)
Reliability analysis of prestressed concrete bridge girder beam
حسب: Kumar, Guna
منشور في: (2005)
حسب: Kumar, Guna
منشور في: (2005)
Hydrodynamic modelling of a sea-crossing bridge in the Maldives
حسب: Shiraz, Hassan
منشور في: (2019)
حسب: Shiraz, Hassan
منشور في: (2019)
Finite element analysis of prestressed concrete box girder bridge
حسب: Othman, Rebaz Abdulghafoor
منشور في: (2013)
حسب: Othman, Rebaz Abdulghafoor
منشور في: (2013)
Empirical model of natural frequency for single span integral bridge
حسب: Ibrahim, Muhammad Khairil
منشور في: (2020)
حسب: Ibrahim, Muhammad Khairil
منشور في: (2020)
Parasitic moment effect for the three spans continuous prestressed concrete bridge
حسب: Salim, Siti Sarah
منشور في: (2014)
حسب: Salim, Siti Sarah
منشور في: (2014)
Nonlinear seismic performance of integral prestressed concrete boxgirder bridge in Malaysia
حسب: Meldi, Meldi
منشور في: (2011)
حسب: Meldi, Meldi
منشور في: (2011)
Finite element analysis of standard T-section bridge prestressed concrete beam
حسب: Akbar, Ibrisam
منشور في: (2001)
حسب: Akbar, Ibrisam
منشور في: (2001)
Experimental and computational studies of fluid structure interaction of tsunami bore on coastal bridges / Iman Mazinani
حسب: Iman , Mazinani
منشور في: (2021)
حسب: Iman , Mazinani
منشور في: (2021)
The characteristics of a sustainable bridge : a case study of Second Penang Bridge
حسب: Ansari, Reza
منشور في: (2013)
حسب: Ansari, Reza
منشور في: (2013)
Load distribution in edge-stiffening beam of a simply supported bridge deck
حسب: Kusuma, Iwan Permadi
منشور في: (2005)
حسب: Kusuma, Iwan Permadi
منشور في: (2005)
Analysis and design of hammerhead bridge pier using a strut and tie method
حسب: Ahyat, Abdul Kadir
منشور في: (2005)
حسب: Ahyat, Abdul Kadir
منشور في: (2005)
Non-linear analysis of RC bridge slab on prestressed beams in transverse direction
حسب: Gan, Zhi Han
منشور في: (2019)
حسب: Gan, Zhi Han
منشور في: (2019)
Creep and thermal response of long span prestressed concrete integral abutment bridge
حسب: Muhammad, Akilu
منشور في: (2017)
حسب: Muhammad, Akilu
منشور في: (2017)
Modal analysis of concrete bridge decks subjected to free vibration
حسب: Mohamad Bhkari, Norshariza
منشور في: (2005)
حسب: Mohamad Bhkari, Norshariza
منشور في: (2005)
Construction of multiple design and build bridge projects: case study in Sabah
حسب: Chidambaram Ramanathan
منشور في: (2008)
حسب: Chidambaram Ramanathan
منشور في: (2008)
The application of artificial neural network in nondestructive testing for concrete bridge inspection rating system
حسب: Alih, Sophia C.
منشور في: (2007)
حسب: Alih, Sophia C.
منشور في: (2007)
Integrated bridge health monitoring, evaluation and alert system using neuro-genetic hybrids
حسب: Suryanita, Reni
منشور في: (2014)
حسب: Suryanita, Reni
منشور في: (2014)
Comparison of bridge design in Malaysia between American codes and British codes
حسب: Wan Ahmad Kamal, Wan Ikram Wajdee
منشور في: (2005)
حسب: Wan Ahmad Kamal, Wan Ikram Wajdee
منشور في: (2005)
Arduino based SPWM three phase full bridge inverter for variable speed drive application
حسب: Muhamad Aiman, Muhamad Azmi
منشور في: (2016)
حسب: Muhamad Aiman, Muhamad Azmi
منشور في: (2016)
Impedance estimation of single-phase diode bridge rectifier using kalman filter
حسب: Nor Syuhaida, Othman
منشور في: (2022)
حسب: Nor Syuhaida, Othman
منشور في: (2022)
Modelling Of Park And Ride Programme For Penang Bridge Express Shuttle Transit (Best)
حسب: Alpi, Mustaqin
منشور في: (2017)
حسب: Alpi, Mustaqin
منشور في: (2017)
Application Of Multi-Criteria Decision Making
Approaches In Prioritizing Highway Bridges
Inventory For Seismic Retrofitting
حسب: Yousefi, Ali
منشور في: (2013)
حسب: Yousefi, Ali
منشور في: (2013)
Risk management of bridge construction project in Indonesia
حسب: Mahardika, Destrian Adi
منشور في: (2012)
حسب: Mahardika, Destrian Adi
منشور في: (2012)
Managing construction project risks; case study: contractors in Johor Bahru
حسب: Abdul Rahiman, Nafisah
منشور في: (2006)
حسب: Abdul Rahiman, Nafisah
منشور في: (2006)
Construction of multiple design and build bridge projects: case study in Sabah
حسب: Chidambaram Ramanathan
منشور في: (2018)
حسب: Chidambaram Ramanathan
منشور في: (2018)
A comparison study between bailey bridge and prestressed concrete bridge / Kamarul Izwad Che Kamarudin
حسب: Che Kamarudin, Kamarul Izwad
منشور في: (2008)
حسب: Che Kamarudin, Kamarul Izwad
منشور في: (2008)
Geometric parametric study on concrete beam bridge
حسب: Nge, Siew Boon
منشور في: (2001)
حسب: Nge, Siew Boon
منشور في: (2001)
Suspension bridge modeling
حسب: Haa, Wai Kang
منشور في: (2010)
حسب: Haa, Wai Kang
منشور في: (2010)
Investigation of carbon footprint emission for highway bridge construction in Malaysia
حسب: Jawad Musafer, Karar Nadhum
منشور في: (2021)
حسب: Jawad Musafer, Karar Nadhum
منشور في: (2021)
مواد مشابهة
-
Fatigue of cable anchorages on a cable-stayed bridge
حسب: Nor Ashikin, Muhamad Khairussaleh
منشور في: (2016) -
Appraisal and performance prediction of Senai-Desaru expressway cable-stayed bridge subject to earthquakes
حسب: Aizon, Nabila Huda
منشور في: (2021) -
Seismic behaviour investigation of a cable-stayed bridge with hybrid passive control system / Ahad Javanmardi
حسب: Ahad , Javanmardi
منشور في: (2019) -
Parametric study on the static behaviour of radiating-type steel cable-stayed bridges
حسب: Yap, Choy Keen
منشور في: (2002) -
Effects Of Cable Diameter Reduction And Snapping On The Behavior Of Cable-Stayed Bridges
حسب: Ajaj, Sayed Mahamed
منشور في: (2007)