Modelling the knowledge management processes for planning and scheduling of construction projects based on state-of-the-art technology
Construction management is an information intensive industry. In construction projects, knowledge is usually buried in unread reports and arcane filing systems, or lost because people move on, leads to wasted activity of reinventing the wheel and impaired project performance. The application o...
| Main Author: | Bahtiar, Siti Fazreena Idayu |
|---|---|
| Format: | Thesis |
| Language: | English English English |
| Published: |
2012
|
| Subjects: | |
| Online Access: | http://eprints.uthm.edu.my/2462/ |
| Abstract | Abstract here |
Similar Items
Integration of program evaluation and review technique (PERT), gantt chart and genetic algorithm in project management scheduling
by: Ahmad, Siti Hasziani
Published: (2014)
by: Ahmad, Siti Hasziani
Published: (2014)
Leadership capability of team leaders in construction industry
by: Wan Muda, Wan Hanim Nadrah
Published: (2013)
by: Wan Muda, Wan Hanim Nadrah
Published: (2013)
Linkage between knowledge management practices towards library user’s satisfaction at Malaysian University Libraries
by: Che Rusuli, Muhamad Saufi
Published: (2014)
by: Che Rusuli, Muhamad Saufi
Published: (2014)
Influence of crisis management factors and moderation of technology business analytics on organisational performance of the UAE municipals
by: Mohamed Almualla, Shk Ahmed Rashed Abdulla
Published: (2023)
by: Mohamed Almualla, Shk Ahmed Rashed Abdulla
Published: (2023)
Study & review of project planning and control in project division / Ahmad Zamri Hamdan
by: Hamdan, Ahmad Zamri
Published: (1997)
by: Hamdan, Ahmad Zamri
Published: (1997)
A system dynamics model to assess the interrelationship between different knowledge areas of PMBOK in a construction project
by: Zainab, A Malik
Published: (2018)
by: Zainab, A Malik
Published: (2018)
Abandoned project restoration model (APRM) for residential construction projects
by: Doraisamy, Sanitha V.
Published: (2017)
by: Doraisamy, Sanitha V.
Published: (2017)
Drivers and barriers of project management practices in logistic industry
by: Faiqah Masturina, Abd Aziz
Published: (2022)
by: Faiqah Masturina, Abd Aziz
Published: (2022)
An evaluation of pre-construction contract variables influencing occupational safety & health performance in Malaysian design & build and design-bid-build construction projects
by: Thian, Kah Kien.
Published: (2011)
by: Thian, Kah Kien.
Published: (2011)
Goal clarity, management functions and project success of the construction companies in Abu Dhabi from the project managers perspectives
by: Mai, Mahmoud M.M
Published: (2022)
by: Mai, Mahmoud M.M
Published: (2022)
Improving construction project scheduling performance amid COVID-19 pandemic / Lu Haw Zheng
by: Lu , Haw Zheng
Published: (2022)
by: Lu , Haw Zheng
Published: (2022)
Impact of project and organizational related factors on project performance of construction companies in Malaysia
by: Gopal, Sekar
Published: (2017)
by: Gopal, Sekar
Published: (2017)
Factors affecting design & build construction project success in Manila, Philippines
by: Yip, Hock Seng
Published: (2019)
by: Yip, Hock Seng
Published: (2019)
Design REA Ontology For Knowledge Sharing In IT Project
by: Al-Oudat, Mohammad Atallah Moh'd
Published: (2008)
by: Al-Oudat, Mohammad Atallah Moh'd
Published: (2008)
Modelling success factors influencing industrialized building system project performance using dematel
by: Yusmin, Jaffar
Published: (2021)
by: Yusmin, Jaffar
Published: (2021)
The effect of foreign labour involvement on the Malaysian construction project performance / Florina Salleh
by: Florina , Salleh
Published: (2013)
by: Florina , Salleh
Published: (2013)
Stochastic Multi-mode Resource-constrained Project Scheduling Problem Under Resource Calendar And Risk-net Present Value.
by: Zhang, Qian
Published: (2024)
by: Zhang, Qian
Published: (2024)
Project management in the Malaysian construction industry / T. Suresh a/l V.M. Thambyiah
by: V. M. Thambyiah, T. Suresh
Published: (1998)
by: V. M. Thambyiah, T. Suresh
Published: (1998)
Information technology adoption inhibitor-influencer model for SMEs in the construction industry
by: Ibrahim, Magaji Umar
Published: (2018)
by: Ibrahim, Magaji Umar
Published: (2018)
Renewable energy project success in malaysia: the influence of stakeholder engagement indicators with the moderating effect of renewable energy policy implementation
by: Zarith Sufia, Azlan
Published: (2022)
by: Zarith Sufia, Azlan
Published: (2022)
Accident prevention through employee participation and ownership in pipeline construction of Oil and Gas Project, Sarawak
by: Jelian Sudum
Published: (2020)
by: Jelian Sudum
Published: (2020)
The Influence Of Leaders’ Bases Of Power On Knowledge
Management Project Performance: The Mediating Effect Of
Knowledge Management Practices
by: Jayasingam, Sharmila
Published: (2009)
by: Jayasingam, Sharmila
Published: (2009)
Effect of green supply chain management practices on sustainability perpormance of ISO14001 SMEs
by: Habib Qazi, Fawad
Published: (2016)
by: Habib Qazi, Fawad
Published: (2016)
Perkaitan antara pengurusan berkesan dari segi kesediaan pengurus makmal , pengendalian peralatan dan keadaan persekitaran dengan peningkatan ciri-ciri keselamatan di makmal
by: Abd Rashid, Samsul
Published: (2001)
by: Abd Rashid, Samsul
Published: (2001)
Penghasilan modul komunikasi juru ukur tanah
by: Yee, Wui Chee
Published: (2002)
by: Yee, Wui Chee
Published: (2002)
Mengenal pasti tahap pengetahuan pelajar tahun akhir ijazah sarjana muda kejuruteraan di KUiTTHO dalam bidang keusahawanan dari aspek pengurusan modal
by: Shafee, Zakiah
Published: (2003)
by: Shafee, Zakiah
Published: (2003)
Amalan komunikasi berkesan antara ketua jabatan dengan staf akademik di politeknik semenanjung Malaysia: satu kajian
by: Mohd Yusof, Nor Zalina
Published: (2003)
by: Mohd Yusof, Nor Zalina
Published: (2003)
Kepimpinan autentik dalam pendidikan teknik dan vokasional (PTV) di politeknik
by: Yunus, Fazlina
Published: (2007)
by: Yunus, Fazlina
Published: (2007)
Penghasilan manual penyediaan perancangan perniagaan bagi industri kecil dan sederhana: satu kajian di Politeknik Seberang Perai
by: Jamaludin, Mohd Faizal
Published: (2003)
by: Jamaludin, Mohd Faizal
Published: (2003)
Pendekatan penilaian untuk analisa cerun tanah
by: Zainal Abidin, Mohd Hazreek
Published: (2006)
by: Zainal Abidin, Mohd Hazreek
Published: (2006)
Pembangunan Modul Pengurusan dan Identifikasi Stail Kepimpinan (MPISK) untuk latihan dan pendidikan bagi sektor penghasilan seramik di Johorcraft Village, Simpang Renggam, Johor
by: Ismail, Norhafizah
Published: (2004)
by: Ismail, Norhafizah
Published: (2004)
Penilaian pengurusan pengetahuan di kalangan pensyarah politeknik
by: Ariffin, Noor Farina
Published: (2006)
by: Ariffin, Noor Farina
Published: (2006)
Supply chain collaboration among Malaysian SME manufacturers
by: Pakir Mohamed, Mohamed Ismail
Published: (2012)
by: Pakir Mohamed, Mohamed Ismail
Published: (2012)
The total quality management practices in Yemeni Public Universities
by: Hussein Al-Amri, Ali Abdullah
Published: (2012)
by: Hussein Al-Amri, Ali Abdullah
Published: (2012)
Corporate social responsibility and organisational performance in a banking institutions
by: Jacqulene, Anthony
Published: (2021)
by: Jacqulene, Anthony
Published: (2021)
The relationship between supplier selection criteria and supply chain agility performance in electric and electronics industry in Somalia
by: Hussein, Anas Abdullahi
Published: (2023)
by: Hussein, Anas Abdullahi
Published: (2023)
Factors influencing future workforce readiness for digital transformation among SCM students: A study at Polytechnic Seberang Perai
by: Kanchana, Kannan
Published: (2025)
by: Kanchana, Kannan
Published: (2025)
Determinant Of Information
Technology Project Success: The
Mediating Effect Of Information
Technology Governance In Banking
Industry In Indonesia
by: Gui, Anderes
Published: (2015)
by: Gui, Anderes
Published: (2015)
The development of emotional intelligence (EI) conceptual model for construction project management
by: Abdul Ghafur, Hanafi
Published: (2022)
by: Abdul Ghafur, Hanafi
Published: (2022)
Effects of international contractors involvement in construction project / Ernie Aryanee Sapiyan
by: Sapiyan, Ernie Aryanee
Published: (2019)
by: Sapiyan, Ernie Aryanee
Published: (2019)
Similar Items
-
Integration of program evaluation and review technique (PERT), gantt chart and genetic algorithm in project management scheduling
by: Ahmad, Siti Hasziani
Published: (2014) -
Leadership capability of team leaders in construction industry
by: Wan Muda, Wan Hanim Nadrah
Published: (2013) -
Linkage between knowledge management practices towards library user’s satisfaction at Malaysian University Libraries
by: Che Rusuli, Muhamad Saufi
Published: (2014) -
Influence of crisis management factors and moderation of technology business analytics on organisational performance of the UAE municipals
by: Mohamed Almualla, Shk Ahmed Rashed Abdulla
Published: (2023) -
Study & review of project planning and control in project division / Ahmad Zamri Hamdan
by: Hamdan, Ahmad Zamri
Published: (1997)
