The built then sell (bts) system in housing industry : obstacles to its implementation in Selangor
The Built then Sell (BTS) system has been an issue in the housing industry since its introduction in 2007. The system was offered as an option to developers due to several problems regarding its implementation. Several developers have opted to use this system in their housing project. Hence, the stu...
| Auteur principal: | Yakob, Hamizah |
|---|---|
| Format: | Thèse |
| Publié: |
2010
|
| Sujets: |
Documents similaires
Investigating The Purchase Intention Of House Buyers‟ In Choosing Between Sell Then Build (Stb) Or Build Then Sell (Bts) House
par: Jusoh, Mohd Hanafi
Publié: (2015)
par: Jusoh, Mohd Hanafi
Publié: (2015)
The Relationship Between The Level Of Defects And House-Buyers’ Satisfaction In Build-Then-Sell (BTS) Housing Delivery System
par: Fauzi, Siti Nur Fazillah Mohd
Publié: (2011)
par: Fauzi, Siti Nur Fazillah Mohd
Publié: (2011)
Bilingual Translation System (BTS) / Razlin Dawina Abdul Razak
par: Razlin Dawina , Abdul Razak
Publié: (2002)
par: Razlin Dawina , Abdul Razak
Publié: (2002)
To determine the selling price of houses in Serpong, Tangerang, West Java
par: Supriyanto, Benedictus
Publié: (1995)
par: Supriyanto, Benedictus
Publié: (1995)
A microcode-based built-in self test and self-diagnosis modules for embedded memory in FPGA hardware
par: Koh, Chee Yan
Publié: (2012)
par: Koh, Chee Yan
Publié: (2012)
Implementing knowledge sharing in construction industry firms
par: Bong, Winnie Chui Nyuk
Publié: (2011)
par: Bong, Winnie Chui Nyuk
Publié: (2011)
Issues in implementing electronic tendering in Indonesian's construction industry
par: Kusumawati, Ratih
Publié: (2012)
par: Kusumawati, Ratih
Publié: (2012)
Build then sell and sell then build on building quality / Mansor Mohamed
par: Mohamed, Mansor
Publié: (2010)
par: Mohamed, Mansor
Publié: (2010)
A study of human aspects on the implementation of ISO 9002 quality management system in plastic manufacturing industry
par: Tan, Teck Heng
Publié: (2000)
par: Tan, Teck Heng
Publié: (2000)
Built-in self-test method at register transfer level design for finite impulse response filter, infinite impulse response filter and greatest common divisor calculator
par: Aris, Muhammad Farhan
Publié: (2010)
par: Aris, Muhammad Farhan
Publié: (2010)
The implementation of eco-labelling for construction materials in Malaysian construction industry
par: Hosseini, Seyedmohsen
Publié: (2013)
par: Hosseini, Seyedmohsen
Publié: (2013)
Information system for implementing Kanban
par: Asadi, Mahmood
Publié: (2011)
par: Asadi, Mahmood
Publié: (2011)
Macroeconomic factors affecting house prices
par: Kek, Bee Wen
Publié: (2010)
par: Kek, Bee Wen
Publié: (2010)
The shape grammar of traditional Malay houses
par: Said, Suzana
Publié: (2010)
par: Said, Suzana
Publié: (2010)
Lean supply chain management and its effects in automotive industry
par: Mehrabbegi, Sajad
Publié: (2011)
par: Mehrabbegi, Sajad
Publié: (2011)
Case study of the development of a housing project
par: Quek, Jin Han
Publié: (2004)
par: Quek, Jin Han
Publié: (2004)
Obstacle Detection And Navigation System For Visually Impaired
par: Selvraju, Avinaash
Publié: (2019)
par: Selvraju, Avinaash
Publié: (2019)
Information system for implementing aggregate planning in supply chain
par: Nassiri, Fardokht
Publié: (2011)
par: Nassiri, Fardokht
Publié: (2011)
Determinant Factors Of Implementing Build Then Sell In Malaysia : Housing Developers Point Of View [HD7363.6.A3 N576 2007 f rb].
par: Ng, Lee Fen
Publié: (2007)
par: Ng, Lee Fen
Publié: (2007)
Solar chimney geometry for stack ventilation in Malaysia terrace house
par: Nugroho, Agung Murti
Publié: (2007)
par: Nugroho, Agung Murti
Publié: (2007)
The effects of culture on public housing non-occupancy in Ondo State, Nigeria
par: Santa Austin, Olowoyo
Publié: (2013)
par: Santa Austin, Olowoyo
Publié: (2013)
A framework of knowledge management system for enterprise resource planning implementation
par: Ebrahimi, Sepideh
Publié: (2011)
par: Ebrahimi, Sepideh
Publié: (2011)
Industrialized building system survey in Yemen
par: AbdulAziz Ali Asaad, AbdulWahab
Publié: (2012)
par: AbdulAziz Ali Asaad, AbdulWahab
Publié: (2012)
The determination of reasonable time in selling property
par: Danuza, Okky
Publié: (1997)
par: Danuza, Okky
Publié: (1997)
Masalah penggunaan dana industri kecil dan sederhana yang tidak optimum daripada perspektif usahawan bumiputera di Negeri Selangor Darul Ehsan
par: Zulkifli, Zulhaimi
Publié: (2000)
par: Zulkifli, Zulhaimi
Publié: (2000)
Geographic information system implementation issues in the planning departments of Kaula Lumpur City Hall, Malaysia
par: Mohd. Hussain, Mohd. Ramzi
Publié: (2010)
par: Mohd. Hussain, Mohd. Ramzi
Publié: (2010)
Benchmarking JKR quality management system with industry best practice
par: Khasim, Muhammad Syukri
Publié: (2011)
par: Khasim, Muhammad Syukri
Publié: (2011)
Defects on building facades in Desa Bakti employee housing, Universiti Teknologi Malaysia, Skudai, Johor, Malaysia
par: Mahar, Waqas Ahmed
Publié: (2012)
par: Mahar, Waqas Ahmed
Publié: (2012)
Cybercrime and the obstacles to convicting its perpetrators according to the law "special reference to UAE law"
par: Alshamsi, Hamad Salim Ali Mejearin
Publié: (2023)
par: Alshamsi, Hamad Salim Ali Mejearin
Publié: (2023)
Image recognition for measurement of quality in industrial building system production line
par: Nia, Moheb Rajaei
Publié: (2012)
par: Nia, Moheb Rajaei
Publié: (2012)
Implementation of skill test (Web based skill assessment system) using Java 2 platform for IKRAM solutions
par: Imrani, Khurram Junaid
Publié: (2006)
par: Imrani, Khurram Junaid
Publié: (2006)
Implementation plan for marine cadastre in peninsular Malaysia
par: Abdullah , Nazirah Mohamad
Publié: (2010)
par: Abdullah , Nazirah Mohamad
Publié: (2010)
Implementing customer service improvement plan in JKR
par: Hashim, Hadzeri
Publié: (2011)
par: Hashim, Hadzeri
Publié: (2011)
The obstacles preventing the small firms in Iraq to export
par: Salman, Mohammed Hassoon
Publié: (2016)
par: Salman, Mohammed Hassoon
Publié: (2016)
Application of self-tuning fuzzy PID controller on industrial hydraulic acuator using system identification approach
par: Yousefi, Rozbeh
Publié: (2010)
par: Yousefi, Rozbeh
Publié: (2010)
Establishment of value management framework for implementation in JKR construction project
par: Abd. Latif, Mukhzani
Publié: (2011)
par: Abd. Latif, Mukhzani
Publié: (2011)
Modelling of acidic wastes and dispersion in Sungai Selangor saline zone
par: Mohd. Yunus, Sabariah
Publié: (2005)
par: Mohd. Yunus, Sabariah
Publié: (2005)
Tourists perception of service quality at Kuala Selangor Nature Park
par: Razali, Mohamad Kazar
Publié: (2011)
par: Razali, Mohamad Kazar
Publié: (2011)
Managing Online Buying and Selling Products for UUM Students
par: Mohammad Rababa, Othman Mahmoud
Publié: (2012)
par: Mohammad Rababa, Othman Mahmoud
Publié: (2012)
Critical factors for the implementation of total quality management in construction project management
par: Yeow, Yoon Foo
Publié: (2010)
par: Yeow, Yoon Foo
Publié: (2010)
Documents similaires
-
Investigating The Purchase Intention Of House Buyers‟ In Choosing Between Sell Then Build (Stb) Or Build Then Sell (Bts) House
par: Jusoh, Mohd Hanafi
Publié: (2015) -
The Relationship Between The Level Of Defects And House-Buyers’ Satisfaction In Build-Then-Sell (BTS) Housing Delivery System
par: Fauzi, Siti Nur Fazillah Mohd
Publié: (2011) -
Bilingual Translation System (BTS) / Razlin Dawina Abdul Razak
par: Razlin Dawina , Abdul Razak
Publié: (2002) -
To determine the selling price of houses in Serpong, Tangerang, West Java
par: Supriyanto, Benedictus
Publié: (1995) -
A microcode-based built-in self test and self-diagnosis modules for embedded memory in FPGA hardware
par: Koh, Chee Yan
Publié: (2012)