Comparative study of defect liability period practices between Malaysia and Nigeria
Defect liability period is the period contractor is liable to make good of the defects but how reasonable is the defects liability period to allow defects (patent and latent) to manifest? This thesis examines the occurrence of defects during and after the defect liability period and the contractual...
| Auteur principal: | Oluwole, Alejo Ayodele |
|---|---|
| Format: | Thèse |
| Langue: | anglais |
| Publié: |
2012
|
| Sujets: | |
| Accès en ligne: | http://eprints.utm.my/32802/1/AlejoAyodeleOluwoleMFAB2012.pdf |
Documents similaires
Contractor's liability relating to defective works that are discovered after the defects liability period
par: Leong, Mei Wan
Publié: (2010)
par: Leong, Mei Wan
Publié: (2010)
Contractor's liabilities towards employer's defective building work claims during defect liability period
par: Lim, Tze Shwan
Publié: (2011)
par: Lim, Tze Shwan
Publié: (2011)
Limitation period in latent defects
par: Lin, Mazuan
Publié: (2016)
par: Lin, Mazuan
Publié: (2016)
Defect study during defect liability period / Mohd Asrul Hassin
par: Hassin, Mohd Asrul
Publié: (2010)
par: Hassin, Mohd Asrul
Publié: (2010)
Contractor's liability to third party for defective works
par: Mohmad Zainordi, Zainab
Publié: (2006)
par: Mohmad Zainordi, Zainab
Publié: (2006)
Occurrences of building defects during defects liability periods of low-cost housing projects / Addruse Hassan
par: Hassan, Addruse
Publié: (2006)
par: Hassan, Addruse
Publié: (2006)
Contractor's liability as an occupier of site during construction
par: Sahibudin, Shafika
Publié: (2009)
par: Sahibudin, Shafika
Publié: (2009)
Contractor’s liability under unforeseen ground conditions
par: Permana, Assad Idea
Publié: (2015)
par: Permana, Assad Idea
Publié: (2015)
Architect's liability in making decision during construction stage
par: Kamaludin, Nurhidayah
Publié: (2012)
par: Kamaludin, Nurhidayah
Publié: (2012)
A comparative study on Indonesia and Malaysia contractor selection practices
par: Dwi Prasetyo, Agung Nugroho
Publié: (2011)
par: Dwi Prasetyo, Agung Nugroho
Publié: (2011)
A study on building defects in newly completed high-rise residential buildings during defects liability period / Zarul Azkief Che Zulkifli
par: Che Zulkifli, Zarul Azkief
Publié: (2009)
par: Che Zulkifli, Zarul Azkief
Publié: (2009)
An analysis of the commonwealth courts decisions on liabilities of construction professionals with special reference to post-completion claims
par: Wan Ahmad, Wan Azlan
Publié: (1996)
par: Wan Ahmad, Wan Azlan
Publié: (1996)
Employer's rights and contractor's liabilities in relation to construction defects after final certificate
par: Tan, Pei Ling
Publié: (2007)
par: Tan, Pei Ling
Publié: (2007)
Measure of damages for defective building work
par: Wong, Bi Xia
Publié: (2009)
par: Wong, Bi Xia
Publié: (2009)
Defects in construction and the temporary disconformity principle
par: Abd. Jalil, Ahmad
Publié: (2014)
par: Abd. Jalil, Ahmad
Publié: (2014)
Contractor's implied duty to warn design defects
par: Gan, Gilbert Siang Yang
Publié: (2015)
par: Gan, Gilbert Siang Yang
Publié: (2015)
Comparison between the standard forms of building contract used in Nigeria and Malaysia
par: Mustapha, Bawa
Publié: (2011)
par: Mustapha, Bawa
Publié: (2011)
Defects and improving the maintainability of buildings at the advance technical training centres
par: Raman, Rajandran Suppiah
Publié: (2011)
par: Raman, Rajandran Suppiah
Publié: (2011)
Architectural project management success : a comparative case study between Yemen and Malaysia / Mohammed Hatim Mohammed Al-Sabahi
par: Al-Sabahi, Mohammed Hatim Mohammed
Publié: (2014)
par: Al-Sabahi, Mohammed Hatim Mohammed
Publié: (2014)
Liability in Malaysian urban settlement / Md. Jonid Bin Md. Noor
par: Md. Jonid, Md. Noor
Publié: (1983)
par: Md. Jonid, Md. Noor
Publié: (1983)
The Impact Of Latent Defects On The Public
Buildings In Malaysia
par: Talib, Roslan
Publié: (2022)
par: Talib, Roslan
Publié: (2022)
The Relationship Between The Level Of Defects And House-Buyers’ Satisfaction In Build-Then-Sell (BTS) Housing Delivery System
par: Fauzi, Siti Nur Fazillah Mohd
Publié: (2011)
par: Fauzi, Siti Nur Fazillah Mohd
Publié: (2011)
Korean company practice in Malaysia
par: Md. Dalib, Md. Sazali
Publié: (2013)
par: Md. Dalib, Md. Sazali
Publié: (2013)
Comparing conventional to industrialised building system construction costing : a case study of school building projects
par: Abdul Aziz, Zuraidah
Publié: (2012)
par: Abdul Aziz, Zuraidah
Publié: (2012)
Factors of affordability in housing in the city of Ibadan, Nigeria
par: Femi, Akinyode Babatunde
Publié: (2017)
par: Femi, Akinyode Babatunde
Publié: (2017)
Relationship Between Risk Management
Practices And Financial Performance Of
Construction And Construction Related
Firms In Pakistan
par: Anjum, Muhammad Shahzad
Publié: (2015)
par: Anjum, Muhammad Shahzad
Publié: (2015)
A Comparative Study Between Public And Private Procurement System In Building Projects In Malaysia
par: Radzi, Nurhidayah Mohd
Publié: (2012)
par: Radzi, Nurhidayah Mohd
Publié: (2012)
Transformation Of Goverment-Linked Companies (Glcs) In The Period 2001-2006 : The Case Of Sedcs In The Housing Sector.
par: Lai, Shuw Wei
Publié: (2009)
par: Lai, Shuw Wei
Publié: (2009)
Environmental performance of naturally ventilated library buildings in Bauchi, Nigeria
par: El-Nafaty, Abbas Sa’id
Publié: (2018)
par: El-Nafaty, Abbas Sa’id
Publié: (2018)
Determining The Effects Of Adopting
Green Construction Site Practices On
Project Performance In Nigeria
par: Hilary, Omatule Onubi
Publié: (2020)
par: Hilary, Omatule Onubi
Publié: (2020)
The prevailing practice in deciding the practical completion of construction work
par: Mohd. Yunos, Mohammad Harith
Publié: (2015)
par: Mohd. Yunos, Mohammad Harith
Publié: (2015)
Assessment of public water distribution using geographic information system in Yola, Nigeria
par: Mohammed, Abdullahi Baba
Publié: (2016)
par: Mohammed, Abdullahi Baba
Publié: (2016)
Corporate social responsibility practices by public limited construction firms in Malaysia
par: Alih, Suzana C.
Publié: (2014)
par: Alih, Suzana C.
Publié: (2014)
Experimental Study Of Comparative Performance Between Three Types Of Photovoltaic Modules In Static And Dynamic Installations Under Penang Climatic Condition
par: Ghazali, Muhammad Azhar
Publié: (2012)
par: Ghazali, Muhammad Azhar
Publié: (2012)
De minimis principle and certificate of practical completion
par: Mamat, Nor'Adila
Publié: (2016)
par: Mamat, Nor'Adila
Publié: (2016)
A study on comparison between solar cooling system and conventional cooling system
par: Jamaluddin, Nur Fateha
Publié: (2013)
par: Jamaluddin, Nur Fateha
Publié: (2013)
The Mediating Roles Of Ethical
Practices In The Relationship
Quality And Cost Performance
Of Multifarious Infrastructure
Projects In Northern Region Of
Nigeria
par: Shuaib, Muhammad Rabiu
Publié: (2022)
par: Shuaib, Muhammad Rabiu
Publié: (2022)
Relationship Between Cost Factors And Performance Of Small Scale Local Government Contractors In Nigeria
par: Gambo, Nuru
Publié: (2016)
par: Gambo, Nuru
Publié: (2016)
Comparison between construction contract used for governmnet projects in Indonesia and Malaysia
par: Soewendo, Adi Argo
Publié: (2011)
par: Soewendo, Adi Argo
Publié: (2011)
The relationship between the peripheral buildings and public square character in the case study of Stadthuys Square in Melaka
par: Javidi, Behdad
Publié: (2013)
par: Javidi, Behdad
Publié: (2013)
Documents similaires
-
Contractor's liability relating to defective works that are discovered after the defects liability period
par: Leong, Mei Wan
Publié: (2010) -
Contractor's liabilities towards employer's defective building work claims during defect liability period
par: Lim, Tze Shwan
Publié: (2011) -
Limitation period in latent defects
par: Lin, Mazuan
Publié: (2016) -
Defect study during defect liability period / Mohd Asrul Hassin
par: Hassin, Mohd Asrul
Publié: (2010) -
Contractor's liability to third party for defective works
par: Mohmad Zainordi, Zainab
Publié: (2006)