Status of estimates for emergency work
In a normal prosedur, estimate is made based on drawings to predict the cost of a project for tender analysis purposes. However, in emergency works, such as land slides that disrupt public facilities, the normal procedure is inappropriate because of its time consuming process. Thus, the Malaysian Tr...
| المؤلف الرئيسي: | Maidin, Noraini |
|---|---|
| التنسيق: | أطروحة |
| منشور في: |
2010
|
| الموضوعات: |
مواد مشابهة
Disaster And Emergency Planning And
Preparedness In The Jordanian Hotel
Industry
حسب: Suleiman Albattat, Ahmad Rasmi
منشور في: (2016)
حسب: Suleiman Albattat, Ahmad Rasmi
منشور في: (2016)
Estimate in formation of construction contract
حسب: Ahmad Termizi, Ezatul Sharida
منشور في: (2013)
حسب: Ahmad Termizi, Ezatul Sharida
منشور في: (2013)
Computerised building cost estimating system
حسب: Marjuki, Mofti
منشور في: (2006)
حسب: Marjuki, Mofti
منشور في: (2006)
The Influence Of Uncertainty Variables On
Project Cost Estimation
حسب: Rauzana, Anita
منشور في: (2015)
حسب: Rauzana, Anita
منشور في: (2015)
Application of BIM in early stage design cost estimation
حسب: Maskuriy, Raihan
منشور في: (2014)
حسب: Maskuriy, Raihan
منشور في: (2014)
An evaluation of effectiveness of approximate quantity method in estimating construction cost
حسب: Siew, Sik Nguong
منشور في: (2013)
حسب: Siew, Sik Nguong
منشور في: (2013)
Assessment and modification of daylight prediction and estimation tools for Malaysian practice
حسب: Denan, Zuraini
منشور في: (1999)
حسب: Denan, Zuraini
منشور في: (1999)
Analysis of factors affecting the accuracy of early cost estimate in construction projects
حسب: Woyowarsito, Dodi Ardianto
منشور في: (2011)
حسب: Woyowarsito, Dodi Ardianto
منشور في: (2011)
Termination of contract : abandonment of work
حسب: Al Hafiz Mohd. Jamil, Mohd. Nur Iman
منشور في: (2012)
حسب: Al Hafiz Mohd. Jamil, Mohd. Nur Iman
منشور في: (2012)
Diminution in value of works due to deffects
حسب: Hashim, Norhaibati
منشور في: (2011)
حسب: Hashim, Norhaibati
منشور في: (2011)
Measure of damages for defective building work
حسب: Wong, Bi Xia
منشور في: (2009)
حسب: Wong, Bi Xia
منشور في: (2009)
Hidden Cost In Building Conservation Works
حسب: Wee, Li Woon
منشور في: (2011)
حسب: Wee, Li Woon
منشور في: (2011)
Factors affecting the preparation of the construction work programme
حسب: Mohamad, Mardiana
منشور في: (2016)
حسب: Mohamad, Mardiana
منشور في: (2016)
Problems associated with acceleration works and its solutions
حسب: Mohamad Nazir, Noor Jannah
منشور في: (2016)
حسب: Mohamad Nazir, Noor Jannah
منشور في: (2016)
Health and safety in refurbishment projects involving demolition work
حسب: Rakhshanifar, Mansooreh
منشور في: (2013)
حسب: Rakhshanifar, Mansooreh
منشور في: (2013)
Analysis of industrialized building system block work with ETABS
حسب: Rahmat, Maziar Ghabel
منشور في: (2013)
حسب: Rahmat, Maziar Ghabel
منشور في: (2013)
The prevailing practice in deciding the practical completion of construction work
حسب: Mohd. Yunos, Mohammad Harith
منشور في: (2015)
حسب: Mohd. Yunos, Mohammad Harith
منشور في: (2015)
Termination procedures of projects by the public works department (PWD)
حسب: Sanusi, Intan Safina
منشور في: (2015)
حسب: Sanusi, Intan Safina
منشور في: (2015)
Economic comparison of industrialized building system with conventional system through cost estimation using building information modeling
حسب: Faghirinejadfard, Amir
منشور في: (2014)
حسب: Faghirinejadfard, Amir
منشور في: (2014)
Executive information system for monitoring building construction work progress
حسب: Zakaria, Wan Zahran
منشور في: (2013)
حسب: Zakaria, Wan Zahran
منشور في: (2013)
Management of variation order in Public Work Department Malaysia construction project
حسب: Amir Mohamed, Sharil Amran
منشور في: (2013)
حسب: Amir Mohamed, Sharil Amran
منشور في: (2013)
Evaluation on current practice in work breakdown structure approach for construction schedules
حسب: Md. Isha, Mohd. Nasir
منشور في: (2004)
حسب: Md. Isha, Mohd. Nasir
منشور في: (2004)
Tree species composition and configuration based on squirrel behaviour pattern in selected Malaysian urban parks
حسب: Bahari, Noraini
منشور في: (2019)
حسب: Bahari, Noraini
منشور في: (2019)
Contractor's liability relating to defective works that are discovered after the defects liability period
حسب: Leong, Mei Wan
منشور في: (2010)
حسب: Leong, Mei Wan
منشور في: (2010)
Contractor's liabilities towards employer's defective building work claims during defect liability period
حسب: Lim, Tze Shwan
منشور في: (2011)
حسب: Lim, Tze Shwan
منشور في: (2011)
The cost overruns in green building development : case study Ministry of Public Works new green building project Republic of Indonesia
حسب: Putro, Anggoro
منشور في: (2012)
حسب: Putro, Anggoro
منشور في: (2012)
An approach to manage termination due to national interest in clause 52.0 OF public work department form 203A (REV.1/2010).
حسب: Mansor, Lydiana
منشور في: (2022)
حسب: Mansor, Lydiana
منشور في: (2022)
Prevalent Tender Preparation Practices For Building Conservation Works
حسب: Lee , Qin Yin
منشور في: (2009)
حسب: Lee , Qin Yin
منشور في: (2009)
The Integration Of Maintenance Requirement Into Development Plan Of Work For Government Building
حسب: Khalid, Ellemy Iskandar
منشور في: (2017)
حسب: Khalid, Ellemy Iskandar
منشور في: (2017)
The Daylight And Luminous Environment Of Working Area In Library Of University Malaya
حسب: Mortazaee, Sahar
منشور في: (2021)
حسب: Mortazaee, Sahar
منشور في: (2021)
The effect of the Control of Rent (Repeal) Act 1997 on the rental level of commercial properties in Georgetown
حسب: Johari, Noraini
منشور في: (2003)
حسب: Johari, Noraini
منشور في: (2003)
Advanced e-presentation system of a work plan for improved project communication
حسب: Vendra, Venkata Krishna
منشور في: (2007)
حسب: Vendra, Venkata Krishna
منشور في: (2007)
Accessibility For Working Women In An Urban Environment: Case Study Of The Komtar Mixed-Use Development Area In Penang
حسب: Yeong , Yoong Chia
منشور في: (2006)
حسب: Yeong , Yoong Chia
منشور في: (2006)
Pembangunan Progresif Bandar Dan Kesan Ke Atas Prestasi Perniagaan - Bandar Balik Pulau
حسب: Md. Zain, Noraini
منشور في: (2003)
حسب: Md. Zain, Noraini
منشور في: (2003)
Contractor's liability to third party for defective works
حسب: Mohmad Zainordi, Zainab
منشور في: (2006)
حسب: Mohmad Zainordi, Zainab
منشور في: (2006)
Cost effectiveness comparison of pre-fabrication with conventional construction method for RMAF ground defense bunker
حسب: Tan, Swee Kok
منشور في: (2010)
حسب: Tan, Swee Kok
منشور في: (2010)
Integrating green initiatives into existing commerical buildings
حسب: Cheng, Yew Leong
منشور في: (2010)
حسب: Cheng, Yew Leong
منشور في: (2010)
Contracting out of statutory provision in Malaysian construction contract
حسب: Lee, Sze Yin
منشور في: (2010)
حسب: Lee, Sze Yin
منشور في: (2010)
Employer's right of set-off in construction contracts
حسب: Chin, Kean Voon
منشور في: (2010)
حسب: Chin, Kean Voon
منشور في: (2010)
Standard of proof on fraud in civil proceedings and voidable construction contract
حسب: Hamzah, Azman
منشور في: (2010)
حسب: Hamzah, Azman
منشور في: (2010)
مواد مشابهة
-
Disaster And Emergency Planning And
Preparedness In The Jordanian Hotel
Industry
حسب: Suleiman Albattat, Ahmad Rasmi
منشور في: (2016) -
Estimate in formation of construction contract
حسب: Ahmad Termizi, Ezatul Sharida
منشور في: (2013) -
Computerised building cost estimating system
حسب: Marjuki, Mofti
منشور في: (2006) -
The Influence Of Uncertainty Variables On
Project Cost Estimation
حسب: Rauzana, Anita
منشور في: (2015) -
Application of BIM in early stage design cost estimation
حسب: Maskuriy, Raihan
منشور في: (2014)