Status of estimates for emergency work
In a normal prosedur, estimate is made based on drawings to predict the cost of a project for tender analysis purposes. However, in emergency works, such as land slides that disrupt public facilities, the normal procedure is inappropriate because of its time consuming process. Thus, the Malaysian Tr...
| Main Author: | Maidin, Noraini |
|---|---|
| Format: | Thesis |
| Published: |
2010
|
| Subjects: |
Similar Items
Disaster And Emergency Planning And
Preparedness In The Jordanian Hotel
Industry
by: Suleiman Albattat, Ahmad Rasmi
Published: (2016)
by: Suleiman Albattat, Ahmad Rasmi
Published: (2016)
Estimate in formation of construction contract
by: Ahmad Termizi, Ezatul Sharida
Published: (2013)
by: Ahmad Termizi, Ezatul Sharida
Published: (2013)
Computerised building cost estimating system
by: Marjuki, Mofti
Published: (2006)
by: Marjuki, Mofti
Published: (2006)
The Influence Of Uncertainty Variables On
Project Cost Estimation
by: Rauzana, Anita
Published: (2015)
by: Rauzana, Anita
Published: (2015)
Application of BIM in early stage design cost estimation
by: Maskuriy, Raihan
Published: (2014)
by: Maskuriy, Raihan
Published: (2014)
An evaluation of effectiveness of approximate quantity method in estimating construction cost
by: Siew, Sik Nguong
Published: (2013)
by: Siew, Sik Nguong
Published: (2013)
Assessment and modification of daylight prediction and estimation tools for Malaysian practice
by: Denan, Zuraini
Published: (1999)
by: Denan, Zuraini
Published: (1999)
Analysis of factors affecting the accuracy of early cost estimate in construction projects
by: Woyowarsito, Dodi Ardianto
Published: (2011)
by: Woyowarsito, Dodi Ardianto
Published: (2011)
Termination of contract : abandonment of work
by: Al Hafiz Mohd. Jamil, Mohd. Nur Iman
Published: (2012)
by: Al Hafiz Mohd. Jamil, Mohd. Nur Iman
Published: (2012)
Diminution in value of works due to deffects
by: Hashim, Norhaibati
Published: (2011)
by: Hashim, Norhaibati
Published: (2011)
Measure of damages for defective building work
by: Wong, Bi Xia
Published: (2009)
by: Wong, Bi Xia
Published: (2009)
Hidden Cost In Building Conservation Works
by: Wee, Li Woon
Published: (2011)
by: Wee, Li Woon
Published: (2011)
Factors affecting the preparation of the construction work programme
by: Mohamad, Mardiana
Published: (2016)
by: Mohamad, Mardiana
Published: (2016)
Problems associated with acceleration works and its solutions
by: Mohamad Nazir, Noor Jannah
Published: (2016)
by: Mohamad Nazir, Noor Jannah
Published: (2016)
Health and safety in refurbishment projects involving demolition work
by: Rakhshanifar, Mansooreh
Published: (2013)
by: Rakhshanifar, Mansooreh
Published: (2013)
Analysis of industrialized building system block work with ETABS
by: Rahmat, Maziar Ghabel
Published: (2013)
by: Rahmat, Maziar Ghabel
Published: (2013)
The prevailing practice in deciding the practical completion of construction work
by: Mohd. Yunos, Mohammad Harith
Published: (2015)
by: Mohd. Yunos, Mohammad Harith
Published: (2015)
Termination procedures of projects by the public works department (PWD)
by: Sanusi, Intan Safina
Published: (2015)
by: Sanusi, Intan Safina
Published: (2015)
Economic comparison of industrialized building system with conventional system through cost estimation using building information modeling
by: Faghirinejadfard, Amir
Published: (2014)
by: Faghirinejadfard, Amir
Published: (2014)
Executive information system for monitoring building construction work progress
by: Zakaria, Wan Zahran
Published: (2013)
by: Zakaria, Wan Zahran
Published: (2013)
Management of variation order in Public Work Department Malaysia construction project
by: Amir Mohamed, Sharil Amran
Published: (2013)
by: Amir Mohamed, Sharil Amran
Published: (2013)
Evaluation on current practice in work breakdown structure approach for construction schedules
by: Md. Isha, Mohd. Nasir
Published: (2004)
by: Md. Isha, Mohd. Nasir
Published: (2004)
Tree species composition and configuration based on squirrel behaviour pattern in selected Malaysian urban parks
by: Bahari, Noraini
Published: (2019)
by: Bahari, Noraini
Published: (2019)
Contractor's liability relating to defective works that are discovered after the defects liability period
by: Leong, Mei Wan
Published: (2010)
by: Leong, Mei Wan
Published: (2010)
Contractor's liabilities towards employer's defective building work claims during defect liability period
by: Lim, Tze Shwan
Published: (2011)
by: Lim, Tze Shwan
Published: (2011)
The cost overruns in green building development : case study Ministry of Public Works new green building project Republic of Indonesia
by: Putro, Anggoro
Published: (2012)
by: Putro, Anggoro
Published: (2012)
An approach to manage termination due to national interest in clause 52.0 OF public work department form 203A (REV.1/2010).
by: Mansor, Lydiana
Published: (2022)
by: Mansor, Lydiana
Published: (2022)
Prevalent Tender Preparation Practices For Building Conservation Works
by: Lee , Qin Yin
Published: (2009)
by: Lee , Qin Yin
Published: (2009)
The Integration Of Maintenance Requirement Into Development Plan Of Work For Government Building
by: Khalid, Ellemy Iskandar
Published: (2017)
by: Khalid, Ellemy Iskandar
Published: (2017)
The Daylight And Luminous Environment Of Working Area In Library Of University Malaya
by: Mortazaee, Sahar
Published: (2021)
by: Mortazaee, Sahar
Published: (2021)
The effect of the Control of Rent (Repeal) Act 1997 on the rental level of commercial properties in Georgetown
by: Johari, Noraini
Published: (2003)
by: Johari, Noraini
Published: (2003)
Advanced e-presentation system of a work plan for improved project communication
by: Vendra, Venkata Krishna
Published: (2007)
by: Vendra, Venkata Krishna
Published: (2007)
Accessibility For Working Women In An Urban Environment: Case Study Of The Komtar Mixed-Use Development Area In Penang
by: Yeong , Yoong Chia
Published: (2006)
by: Yeong , Yoong Chia
Published: (2006)
Pembangunan Progresif Bandar Dan Kesan Ke Atas Prestasi Perniagaan - Bandar Balik Pulau
by: Md. Zain, Noraini
Published: (2003)
by: Md. Zain, Noraini
Published: (2003)
Contractor's liability to third party for defective works
by: Mohmad Zainordi, Zainab
Published: (2006)
by: Mohmad Zainordi, Zainab
Published: (2006)
Cost effectiveness comparison of pre-fabrication with conventional construction method for RMAF ground defense bunker
by: Tan, Swee Kok
Published: (2010)
by: Tan, Swee Kok
Published: (2010)
Integrating green initiatives into existing commerical buildings
by: Cheng, Yew Leong
Published: (2010)
by: Cheng, Yew Leong
Published: (2010)
Contracting out of statutory provision in Malaysian construction contract
by: Lee, Sze Yin
Published: (2010)
by: Lee, Sze Yin
Published: (2010)
Employer's right of set-off in construction contracts
by: Chin, Kean Voon
Published: (2010)
by: Chin, Kean Voon
Published: (2010)
Standard of proof on fraud in civil proceedings and voidable construction contract
by: Hamzah, Azman
Published: (2010)
by: Hamzah, Azman
Published: (2010)
Similar Items
-
Disaster And Emergency Planning And
Preparedness In The Jordanian Hotel
Industry
by: Suleiman Albattat, Ahmad Rasmi
Published: (2016) -
Estimate in formation of construction contract
by: Ahmad Termizi, Ezatul Sharida
Published: (2013) -
Computerised building cost estimating system
by: Marjuki, Mofti
Published: (2006) -
The Influence Of Uncertainty Variables On
Project Cost Estimation
by: Rauzana, Anita
Published: (2015) -
Application of BIM in early stage design cost estimation
by: Maskuriy, Raihan
Published: (2014)