Status of estimates for emergency work
In a normal prosedur, estimate is made based on drawings to predict the cost of a project for tender analysis purposes. However, in emergency works, such as land slides that disrupt public facilities, the normal procedure is inappropriate because of its time consuming process. Thus, the Malaysian Tr...
| Auteur principal: | Maidin, Noraini |
|---|---|
| Format: | Thèse |
| Publié: |
2010
|
| Sujets: |
Documents similaires
Disaster And Emergency Planning And
Preparedness In The Jordanian Hotel
Industry
par: Suleiman Albattat, Ahmad Rasmi
Publié: (2016)
par: Suleiman Albattat, Ahmad Rasmi
Publié: (2016)
Estimate in formation of construction contract
par: Ahmad Termizi, Ezatul Sharida
Publié: (2013)
par: Ahmad Termizi, Ezatul Sharida
Publié: (2013)
Computerised building cost estimating system
par: Marjuki, Mofti
Publié: (2006)
par: Marjuki, Mofti
Publié: (2006)
The Influence Of Uncertainty Variables On
Project Cost Estimation
par: Rauzana, Anita
Publié: (2015)
par: Rauzana, Anita
Publié: (2015)
Application of BIM in early stage design cost estimation
par: Maskuriy, Raihan
Publié: (2014)
par: Maskuriy, Raihan
Publié: (2014)
An evaluation of effectiveness of approximate quantity method in estimating construction cost
par: Siew, Sik Nguong
Publié: (2013)
par: Siew, Sik Nguong
Publié: (2013)
Assessment and modification of daylight prediction and estimation tools for Malaysian practice
par: Denan, Zuraini
Publié: (1999)
par: Denan, Zuraini
Publié: (1999)
Analysis of factors affecting the accuracy of early cost estimate in construction projects
par: Woyowarsito, Dodi Ardianto
Publié: (2011)
par: Woyowarsito, Dodi Ardianto
Publié: (2011)
Termination of contract : abandonment of work
par: Al Hafiz Mohd. Jamil, Mohd. Nur Iman
Publié: (2012)
par: Al Hafiz Mohd. Jamil, Mohd. Nur Iman
Publié: (2012)
Diminution in value of works due to deffects
par: Hashim, Norhaibati
Publié: (2011)
par: Hashim, Norhaibati
Publié: (2011)
Measure of damages for defective building work
par: Wong, Bi Xia
Publié: (2009)
par: Wong, Bi Xia
Publié: (2009)
Hidden Cost In Building Conservation Works
par: Wee, Li Woon
Publié: (2011)
par: Wee, Li Woon
Publié: (2011)
Factors affecting the preparation of the construction work programme
par: Mohamad, Mardiana
Publié: (2016)
par: Mohamad, Mardiana
Publié: (2016)
Problems associated with acceleration works and its solutions
par: Mohamad Nazir, Noor Jannah
Publié: (2016)
par: Mohamad Nazir, Noor Jannah
Publié: (2016)
Health and safety in refurbishment projects involving demolition work
par: Rakhshanifar, Mansooreh
Publié: (2013)
par: Rakhshanifar, Mansooreh
Publié: (2013)
Analysis of industrialized building system block work with ETABS
par: Rahmat, Maziar Ghabel
Publié: (2013)
par: Rahmat, Maziar Ghabel
Publié: (2013)
The prevailing practice in deciding the practical completion of construction work
par: Mohd. Yunos, Mohammad Harith
Publié: (2015)
par: Mohd. Yunos, Mohammad Harith
Publié: (2015)
Termination procedures of projects by the public works department (PWD)
par: Sanusi, Intan Safina
Publié: (2015)
par: Sanusi, Intan Safina
Publié: (2015)
Economic comparison of industrialized building system with conventional system through cost estimation using building information modeling
par: Faghirinejadfard, Amir
Publié: (2014)
par: Faghirinejadfard, Amir
Publié: (2014)
Executive information system for monitoring building construction work progress
par: Zakaria, Wan Zahran
Publié: (2013)
par: Zakaria, Wan Zahran
Publié: (2013)
Management of variation order in Public Work Department Malaysia construction project
par: Amir Mohamed, Sharil Amran
Publié: (2013)
par: Amir Mohamed, Sharil Amran
Publié: (2013)
Evaluation on current practice in work breakdown structure approach for construction schedules
par: Md. Isha, Mohd. Nasir
Publié: (2004)
par: Md. Isha, Mohd. Nasir
Publié: (2004)
Tree species composition and configuration based on squirrel behaviour pattern in selected Malaysian urban parks
par: Bahari, Noraini
Publié: (2019)
par: Bahari, Noraini
Publié: (2019)
Contractor's liability relating to defective works that are discovered after the defects liability period
par: Leong, Mei Wan
Publié: (2010)
par: Leong, Mei Wan
Publié: (2010)
Contractor's liabilities towards employer's defective building work claims during defect liability period
par: Lim, Tze Shwan
Publié: (2011)
par: Lim, Tze Shwan
Publié: (2011)
The cost overruns in green building development : case study Ministry of Public Works new green building project Republic of Indonesia
par: Putro, Anggoro
Publié: (2012)
par: Putro, Anggoro
Publié: (2012)
An approach to manage termination due to national interest in clause 52.0 OF public work department form 203A (REV.1/2010).
par: Mansor, Lydiana
Publié: (2022)
par: Mansor, Lydiana
Publié: (2022)
Prevalent Tender Preparation Practices For Building Conservation Works
par: Lee , Qin Yin
Publié: (2009)
par: Lee , Qin Yin
Publié: (2009)
The Integration Of Maintenance Requirement Into Development Plan Of Work For Government Building
par: Khalid, Ellemy Iskandar
Publié: (2017)
par: Khalid, Ellemy Iskandar
Publié: (2017)
The Daylight And Luminous Environment Of Working Area In Library Of University Malaya
par: Mortazaee, Sahar
Publié: (2021)
par: Mortazaee, Sahar
Publié: (2021)
The effect of the Control of Rent (Repeal) Act 1997 on the rental level of commercial properties in Georgetown
par: Johari, Noraini
Publié: (2003)
par: Johari, Noraini
Publié: (2003)
Advanced e-presentation system of a work plan for improved project communication
par: Vendra, Venkata Krishna
Publié: (2007)
par: Vendra, Venkata Krishna
Publié: (2007)
Accessibility For Working Women In An Urban Environment: Case Study Of The Komtar Mixed-Use Development Area In Penang
par: Yeong , Yoong Chia
Publié: (2006)
par: Yeong , Yoong Chia
Publié: (2006)
Pembangunan Progresif Bandar Dan Kesan Ke Atas Prestasi Perniagaan - Bandar Balik Pulau
par: Md. Zain, Noraini
Publié: (2003)
par: Md. Zain, Noraini
Publié: (2003)
Contractor's liability to third party for defective works
par: Mohmad Zainordi, Zainab
Publié: (2006)
par: Mohmad Zainordi, Zainab
Publié: (2006)
Cost effectiveness comparison of pre-fabrication with conventional construction method for RMAF ground defense bunker
par: Tan, Swee Kok
Publié: (2010)
par: Tan, Swee Kok
Publié: (2010)
Integrating green initiatives into existing commerical buildings
par: Cheng, Yew Leong
Publié: (2010)
par: Cheng, Yew Leong
Publié: (2010)
Contracting out of statutory provision in Malaysian construction contract
par: Lee, Sze Yin
Publié: (2010)
par: Lee, Sze Yin
Publié: (2010)
Employer's right of set-off in construction contracts
par: Chin, Kean Voon
Publié: (2010)
par: Chin, Kean Voon
Publié: (2010)
Standard of proof on fraud in civil proceedings and voidable construction contract
par: Hamzah, Azman
Publié: (2010)
par: Hamzah, Azman
Publié: (2010)
Documents similaires
-
Disaster And Emergency Planning And
Preparedness In The Jordanian Hotel
Industry
par: Suleiman Albattat, Ahmad Rasmi
Publié: (2016) -
Estimate in formation of construction contract
par: Ahmad Termizi, Ezatul Sharida
Publié: (2013) -
Computerised building cost estimating system
par: Marjuki, Mofti
Publié: (2006) -
The Influence Of Uncertainty Variables On
Project Cost Estimation
par: Rauzana, Anita
Publié: (2015) -
Application of BIM in early stage design cost estimation
par: Maskuriy, Raihan
Publié: (2014)