The delay at pre-tendering stage of projects in Accommodation and Works Directorate Ministry of Defense Kuala Lumpur
| 第一著者: | Gurmukh Singh, Lakhbir Singh |
|---|---|
| フォーマット: | 学位論文 |
| 出版事項: |
2007
|
| 主題: |
類似資料
Motivation in the accommodation and works directorate, Ministry of Defence / Wong Chiang Heng
著者:: Wong, Chiang Heng
出版事項: (1996)
著者:: Wong, Chiang Heng
出版事項: (1996)
Quantity surveyor's liability during pre tender stage
著者:: Bohari, Asmah Alia
出版事項: (2009)
著者:: Bohari, Asmah Alia
出版事項: (2009)
The causes of project delay in the ministry of defence, Malaysia
著者:: Azhar, Shahrizal
出版事項: (2019)
著者:: Azhar, Shahrizal
出版事項: (2019)
Mobile Tender (M-Tender) For Public Work Department Within Malaysian Government.
著者:: Zahrawi, Ali Ahmad Deeb
出版事項: (2007)
著者:: Zahrawi, Ali Ahmad Deeb
出版事項: (2007)
Contractors' approaches to risk indentification at the tendering stage
著者:: Munisamy, Thavarajah
出版事項: (2000)
著者:: Munisamy, Thavarajah
出版事項: (2000)
A model for assessing procurement irregularities in decision making process at the tendering stage of construction projects
著者:: Kan, Fock Kui
出版事項: (2016)
著者:: Kan, Fock Kui
出版事項: (2016)
The privatization projects implemented by Ministry of Defence
著者:: Ibrahim, Abdul Rahman
出版事項: (2007)
著者:: Ibrahim, Abdul Rahman
出版事項: (2007)
Project risk factors : case study of Ministry of Education projects
著者:: Basiron, Anida Suharti@Ami Ronida
出版事項: (2009)
著者:: Basiron, Anida Suharti@Ami Ronida
出版事項: (2009)
Challenges in e-tendering implementation in Ministry of Youth and Sports Malaysia / Ahmad Zamie Azis
著者:: Ahmad Zamie, azis
出版事項: (2020)
著者:: Ahmad Zamie, azis
出版事項: (2020)
Risk management procedures for physical development projects in the Ministry of Education
著者:: Ahmad Salleh, Mazlina
出版事項: (2015)
著者:: Ahmad Salleh, Mazlina
出版事項: (2015)
Evaluation on properties of tender mixes
著者:: Abd. Rahman, Zanariah
出版事項: (2006)
著者:: Abd. Rahman, Zanariah
出版事項: (2006)
Utilizing productivity among procurement officers after the completion of the tender process at procurement division, Ministry of Education
著者:: Ahmad, Mohd. Radziff
出版事項: (2022)
著者:: Ahmad, Mohd. Radziff
出版事項: (2022)
Replacement Teacher Job Portal Southern Aghwar Directorate Ministry of Education Jordan
著者:: Maradat, Osama Ahmad Suleiman
出版事項: (2010)
著者:: Maradat, Osama Ahmad Suleiman
出版事項: (2010)
Delay on the zone establishment work process in non-revenue water reduction project
著者:: Krishnan, Desanan
出版事項: (2007)
著者:: Krishnan, Desanan
出版事項: (2007)
The study on impact of project delay to construction cost
著者:: Maulana, Dimas
出版事項: (2011)
著者:: Maulana, Dimas
出版事項: (2011)
Minimizing delay in construction projects in Tehran, Iran
著者:: Rafieizonooz, Mahdi
出版事項: (2012)
著者:: Rafieizonooz, Mahdi
出版事項: (2012)
Project delays recovery on construction work
著者:: Adiwati, Shinta
出版事項: (1999)
著者:: Adiwati, Shinta
出版事項: (1999)
Project delays recovery on construction work
著者:: Adiwati, Shinta
出版事項: (1999)
著者:: Adiwati, Shinta
出版事項: (1999)
Risk assessment practices in project scheduling to reduce potential delays
著者:: Nagarajan, Logeswaren
出版事項: (2019)
著者:: Nagarajan, Logeswaren
出版事項: (2019)
Risk assessment for the delay factors in project management of road construction
著者:: Musa, Siti Noorzarina
出版事項: (2020)
著者:: Musa, Siti Noorzarina
出版事項: (2020)
Developing an Automated Tender Evaluation System for Information Technology Projects (ATES)
著者:: Nor Aiza, Abdul Rahman
出版事項: (2010)
著者:: Nor Aiza, Abdul Rahman
出版事項: (2010)
Issues in implementing electronic tendering in Indonesian’s construction industry
著者:: Ratih Kusumawati, Ratih Kusumawati
出版事項: (2012)
著者:: Ratih Kusumawati, Ratih Kusumawati
出版事項: (2012)
Factors and impacts of excusable delays in Malaysia engineering, procurement and consturctional projects
著者:: Munusamy, Suresh
出版事項: (2021)
著者:: Munusamy, Suresh
出版事項: (2021)
Cost effectiveness comparison of pre-fabrication with conventional construction method for RMAF ground defense bunker
著者:: Tan, Swee Kok
出版事項: (2010)
著者:: Tan, Swee Kok
出版事項: (2010)
A machine learning-based framework for delay risk mitigation in building projects
著者:: Sanni-Anibire, Muizz Oladapo
出版事項: (2021)
著者:: Sanni-Anibire, Muizz Oladapo
出版事項: (2021)
A study on the satisfaction of employees’ working relationships at the Ministry of Defence, Kuala Lumpur
著者:: Muhammad Syafiq, Othman
出版事項: (2021)
著者:: Muhammad Syafiq, Othman
出版事項: (2021)
A comparative study of construction project delays in Johor and Sabah region
著者:: Safri, Dayang Sabriah
出版事項: (2009)
著者:: Safri, Dayang Sabriah
出版事項: (2009)
Prevalent Tender Preparation Practices For Building Conservation Works
著者:: Lee , Qin Yin
出版事項: (2009)
著者:: Lee , Qin Yin
出版事項: (2009)
Strategy of minimizing delay in public construction projects through implementation of electronic procurement system
著者:: Alwaely, Ammar Mohammed Oda
出版事項: (2019)
著者:: Alwaely, Ammar Mohammed Oda
出版事項: (2019)
Adoption of Building Information Modelling (BIM) tools during pre-construction stage in Malaysian construction industry
著者:: Mak, Tuck Kiong
出版事項: (2018)
著者:: Mak, Tuck Kiong
出版事項: (2018)
Cloud Computing For Iraqi Ministry Of Finance
著者:: Ahmed Dawod, Salman
出版事項: (2014)
著者:: Ahmed Dawod, Salman
出版事項: (2014)
Metabolite profiling and defense gene expression of susceptible and tolerant oil palm seedling progenies at early stage of Ganoderma boninense infection
著者:: Syd Ali, Nusaibah
出版事項: (2012)
著者:: Syd Ali, Nusaibah
出版事項: (2012)
Pembangunan sistem pangkalan data bagi proses penilaian tender di dalam industri pembinaan
著者:: Yusof, Suraya
出版事項: (2006)
著者:: Yusof, Suraya
出版事項: (2006)
Issues and challenges of maintenances works for Universiti Teknikal Malaysia Melaka (UTeM) student accommodation under private finance initiative
著者:: Alwee, Amir Akmal
出版事項: (2019)
著者:: Alwee, Amir Akmal
出版事項: (2019)
Tendering contract : breach by the employer
著者:: Abdul Hamid, Suziana
出版事項: (2011)
著者:: Abdul Hamid, Suziana
出版事項: (2011)
An evaluation on the effectiveness of the tender process
著者:: Dahler, Dahler
出版事項: (1999)
著者:: Dahler, Dahler
出版事項: (1999)
Car plate tendering in Malaysia
著者:: Zhou, Yao
出版事項: (2014)
著者:: Zhou, Yao
出版事項: (2014)
Design of Tender Management System
著者:: Alrwashdeh, Dima Farhan
出版事項: (2012)
著者:: Alrwashdeh, Dima Farhan
出版事項: (2012)
Optimization of protease extraction and characterization of protease from syzygium polyanthum as potential meat tenderizer
著者:: Noorhafiza, Yahya
出版事項: (2023)
著者:: Noorhafiza, Yahya
出版事項: (2023)
Determining the delay factors for reconstructed mega-project’s phases and the associated challenges / Basem Adnan Al Khatib
著者:: Basem Adnan , Al Khatib
出版事項: (2021)
著者:: Basem Adnan , Al Khatib
出版事項: (2021)
類似資料
-
Motivation in the accommodation and works directorate, Ministry of Defence / Wong Chiang Heng
著者:: Wong, Chiang Heng
出版事項: (1996) -
Quantity surveyor's liability during pre tender stage
著者:: Bohari, Asmah Alia
出版事項: (2009) -
The causes of project delay in the ministry of defence, Malaysia
著者:: Azhar, Shahrizal
出版事項: (2019) -
Mobile Tender (M-Tender) For Public Work Department Within Malaysian Government.
著者:: Zahrawi, Ali Ahmad Deeb
出版事項: (2007) -
Contractors' approaches to risk indentification at the tendering stage
著者:: Munisamy, Thavarajah
出版事項: (2000)