Construction foreign labour skill drain
Construction industry is labor-intensive based and in the demand of unskilled, semiskilled and skilled labors. Presently, the nation is relying mainly on foreign labor as they are inexpensive, easier to recruit, hardworking and willing to work extra hours. Poor participation of the local labors due...
| Main Author: | Hailuddin, Huda Mastura |
|---|---|
| Format: | Thesis |
| Published: |
2012
|
| Subjects: |
Similar Items
Foreign labour employment in construction project
by: Jamadi, Muhammad Ammar
Published: (2012)
by: Jamadi, Muhammad Ammar
Published: (2012)
Modelling construction labour productivity from labour's characteristics
by: Momade, Mohammed Hamza
Published: (2020)
by: Momade, Mohammed Hamza
Published: (2020)
Modelling construction labour productivity from labour characteristics
by: Momade, Mohammed Hamza
Published: (2020)
by: Momade, Mohammed Hamza
Published: (2020)
Performance of ground improvement by precompression and vertical drain
by: Mohamed, Rosdi
Published: (2008)
by: Mohamed, Rosdi
Published: (2008)
Soft ground improvement by prefabricated vertical drain (pvd)
by: Khalid, Nor Aisah
Published: (2018)
by: Khalid, Nor Aisah
Published: (2018)
Foreign workers in Middle East construction industry
by: Miryousefi Ata, Seyedeh Sara
Published: (2013)
by: Miryousefi Ata, Seyedeh Sara
Published: (2013)
Prefabricated vertical drain in marine clay soil using plaxis 2D
by: Zulkifli, Muhammad Zakwan
Published: (2020)
by: Zulkifli, Muhammad Zakwan
Published: (2020)
Ground improvement on land reclamation project-prefabricated vertical drain with pre-loading
by: Lee, Yoon Leong
Published: (2020)
by: Lee, Yoon Leong
Published: (2020)
Performance prediction of prefabricated vertical drain in soft soil using finite element method
by: Teh, Zhi Huan
Published: (2015)
by: Teh, Zhi Huan
Published: (2015)
Settlement analysis of prefabricated vertical drain by finite element analysis for treated road embankment
by: Mohamad, Khairul Anuar
Published: (2017)
by: Mohamad, Khairul Anuar
Published: (2017)
Back analyses on prefabricated vertical drain treated ground using plaxis 2D
by: Harun, Hanisah
Published: (2017)
by: Harun, Hanisah
Published: (2017)
Strategies and employers decision to reduce foreign workers in construction industry
by: Mohd. Ahmadan, Nor Asyidah
Published: (2021)
by: Mohd. Ahmadan, Nor Asyidah
Published: (2021)
Comparison between predicted and observed compressibility characteristics of treated soil using precompression and vertical drain
by: Zukri, Azhani
Published: (2010)
by: Zukri, Azhani
Published: (2010)
Performance prediction of prefabricated vertical drains beneath embankment on soft ground by finite element analysis
by: Gopalan, Thanath
Published: (2010)
by: Gopalan, Thanath
Published: (2010)
Comparison between predicted and observed settlement of vertical drain treated road embankment on soft clay
by: Ahmad, Mohd. Redzuan
Published: (2006)
by: Ahmad, Mohd. Redzuan
Published: (2006)
Sustainable design at transition rigid piled embankment with surcharged vertical drain over soft ground
by: Subramaniam, Puspanathan
Published: (2018)
by: Subramaniam, Puspanathan
Published: (2018)
Roles, Skills and personal characteristics of project manager in construction industry
by: Razali, Fadilah
Published: (2007)
by: Razali, Fadilah
Published: (2007)
Effects of foreign worker on sectorals, skills and labour market outcomes
by: Abdul Hamid, Kamarul Hidayah
Published: (2020)
by: Abdul Hamid, Kamarul Hidayah
Published: (2020)
Constructability comparison between IBS and conventional construction
by: Harirchian, Ehsan
Published: (2015)
by: Harirchian, Ehsan
Published: (2015)
Malaysia construction experience in deployment of crane services for construction project
by: Ahmad Shukri, Faten Adilah
Published: (2010)
by: Ahmad Shukri, Faten Adilah
Published: (2010)
Sustainable construction for mixed development projects in the Malaysian construction industry
by: Abu Bakar, Nur Fatin Syazwani
Published: (2016)
by: Abu Bakar, Nur Fatin Syazwani
Published: (2016)
Factors influence construction time performance for IBS in Malaysia Construction Industry
by: Salahuddin, Siti Nur Hafizeanie
Published: (2010)
by: Salahuddin, Siti Nur Hafizeanie
Published: (2010)
Project management skills for new engineers in Jabatan Kerja Raya Malaysia
by: Ismail, Mohd. Faizu
Published: (2015)
by: Ismail, Mohd. Faizu
Published: (2015)
Knowledge management in construction
by: Ee , Lee Chuan
Published: (2010)
by: Ee , Lee Chuan
Published: (2010)
Contextualised action learning framework in developing entrepreneurial skills for civil engineering students
by: Entika, Christie Lanjing
Published: (2019)
by: Entika, Christie Lanjing
Published: (2019)
Construction safety in Jakarta, Indonesia
by: Paringga, Lanang Ardi
Published: (2010)
by: Paringga, Lanang Ardi
Published: (2010)
Safety in pre-cast construction
by: Abdullah Thawaba, Bakeel Hassan
Published: (2007)
by: Abdullah Thawaba, Bakeel Hassan
Published: (2007)
Construction safety management in Terengganu
by: Abd. Kadir, Siti Hajar
Published: (2011)
by: Abd. Kadir, Siti Hajar
Published: (2011)
Ergonomics awareness in construction industry
by: Halipah, Hazwani
Published: (2014)
by: Halipah, Hazwani
Published: (2014)
Overtime in minimizing construction delay
by: Saari, Syahmi
Published: (2014)
by: Saari, Syahmi
Published: (2014)
Leadership necessity in construction projects
by: Mouad, Hafidi
Published: (2020)
by: Mouad, Hafidi
Published: (2020)
Implementation of ISO 9001:2000 quality management system for construction biddings procedures in construction management practice
by: Youceff, Berreksi
Published: (2006)
by: Youceff, Berreksi
Published: (2006)
Adoption of Building Information Modelling (BIM) tools during pre-construction stage in Malaysian construction industry
by: Mak, Tuck Kiong
Published: (2018)
by: Mak, Tuck Kiong
Published: (2018)
Document management model for collaborative construction
by: Muhammad Abdul Haq Shahib, Shahhul Hameed Shahib
Published: (2007)
by: Muhammad Abdul Haq Shahib, Shahhul Hameed Shahib
Published: (2007)
Precast construction database management system
by: Lim , Wey Heng
Published: (2004)
by: Lim , Wey Heng
Published: (2004)
Critical success factors for the construction organisation
by: Mazri, Irma Azreen
Published: (2005)
by: Mazri, Irma Azreen
Published: (2005)
The causes of construction dispute on client organizations
by: Koh, Cheo Poh
Published: (2005)
by: Koh, Cheo Poh
Published: (2005)
Construction safety practices in Batam, Indonesia
by: Permana, Inda Eka
Published: (2007)
by: Permana, Inda Eka
Published: (2007)
Design phase constructability assessment model
by: Mohamad Zin, Rosli
Published: (2004)
by: Mohamad Zin, Rosli
Published: (2004)
Principles of implied terms in construction contracts
by: Lee, Cen Ying
Published: (2007)
by: Lee, Cen Ying
Published: (2007)
Similar Items
-
Foreign labour employment in construction project
by: Jamadi, Muhammad Ammar
Published: (2012) -
Modelling construction labour productivity from labour's characteristics
by: Momade, Mohammed Hamza
Published: (2020) -
Modelling construction labour productivity from labour characteristics
by: Momade, Mohammed Hamza
Published: (2020) -
Performance of ground improvement by precompression and vertical drain
by: Mohamed, Rosdi
Published: (2008) -
Soft ground improvement by prefabricated vertical drain (pvd)
by: Khalid, Nor Aisah
Published: (2018)