Scheduling on transportation for industrialized building systems

Now, the construction is facing the challenges from the four main aspects, which are quality, cost, time and safety. However, by implementing the industrialized building system (IBS), all those challenges can be faced easily. In this study, double storey shop houses will be used as a model to illust...

全面介绍

书目详细资料
主要作者: Foong, Kok Li
格式: Thesis
语言:英语
出版: 2006
主题:
在线阅读:http://eprints.utm.my/4582/1/FoongKokLiMFKA2006.pdf
实物特征
总结:Now, the construction is facing the challenges from the four main aspects, which are quality, cost, time and safety. However, by implementing the industrialized building system (IBS), all those challenges can be faced easily. In this study, double storey shop houses will be used as a model to illustrate the management of IBS transportation for fabricators. Besides, the number of trucks required each day will be discussed here based on proper scheduling using project management software. Other than that, this study focuses on the scheduling by optimization. This project highlights a proper management of the trucks used in the delivery of IBS components for construction.