Scheduling on transportation for industrialized building systems

Now, the construction is facing the challenges from the four main aspects, which are quality, cost, time and safety. However, by implementing the industrialized building system (IBS), all those challenges can be faced easily. In this study, double storey shop houses will be used as a model to illust...

وصف كامل

التفاصيل البيبلوغرافية
المؤلف الرئيسي: Foong, Kok Li
التنسيق: أطروحة
اللغة:الإنجليزية
منشور في: 2006
الموضوعات:
الوصول للمادة أونلاين:http://eprints.utm.my/4582/1/FoongKokLiMFKA2006.pdf