Basis in ascertaining the amount of liquidated damages
In Malaysian construction industry, one of the conditions in the contract made between the employer and contractor is to complete a project within a specified time. Failure to fulfil the condition will amount to breach of contract. Main remedy available for breach of contract is an award of damages....
| المؤلف الرئيسي: | |
|---|---|
| التنسيق: | أطروحة | 
| اللغة: | الإنجليزية | 
| منشور في: | 
          
        2014
     | 
| الموضوعات: | |
| الوصول للمادة أونلاين: | http://eprints.utm.my/48929/25/IliLiyanaAzmanFAB2014.pdf |