Measures for mitigating the delay in high-rise building construction projects in Dubai
Construction industry faces several challenges such as low labour productivity, cost overrun, time overrun, and extreme weather condition. Globally, the most severe challenge is project delay, particularly in Dubai where the construction industry is booming rapidly than other parts of the world, esp...
| Main Author: | Bhatti, Imtiaz Ali |
|---|---|
| Format: | Thesis |
| Language: | English English English |
| Published: |
2019
|
| Subjects: | |
| Online Access: | http://eprints.uthm.edu.my/519/ |
| Abstract | Abstract here |
Similar Items
Mitigation measures for critical factors causing cost overrun in Malaysian building projects
by: Ullah, Kaleem
Published: (2018)
by: Ullah, Kaleem
Published: (2018)
In-success factor for project management in high-rise building project
by: Yahya Al-Tawil, Yahya Mohsen
Published: (2019)
by: Yahya Al-Tawil, Yahya Mohsen
Published: (2019)
Project Performance And Delays In Sudan
Construction Industry
by: Elhassan, Salma Abdalrahman Mohamed
Published: (2009)
by: Elhassan, Salma Abdalrahman Mohamed
Published: (2009)
Integration of building information modelling (BIM) with materials management in construction project
by: Fayed Mogalli, Ali Hussein
Published: (2017)
by: Fayed Mogalli, Ali Hussein
Published: (2017)
Parametric modelling of phase change materials (PCM) for enhanced energy efficiency in tropical high-rise office buildings / Zhan Haoxiang
by: Zhan , Haoxiang
Published: (2024)
by: Zhan , Haoxiang
Published: (2024)
The relationship between preventive maintenance characteristics and the maintenance performance of high-rise office buildings in Malaysia / Au Yong Cheong Peng
by: Au Yong, Cheong Peng
Published: (2013)
by: Au Yong, Cheong Peng
Published: (2013)
Construction of multiple design and build bridge projects: case study in Sabah
by: Chidambaram Ramanathan
Published: (2018)
by: Chidambaram Ramanathan
Published: (2018)
The framework of direct and indirect effect of project risk response-related measures on project performance in managing construction delay
by: Karunakaran, Priyadatchini
Published: (2020)
by: Karunakaran, Priyadatchini
Published: (2020)
The Performance Of Wind
Wing-Wall On Air Velocity For High-Rise
Residential Building In Malaysia
by: Rosdi, Munirah
Published: (2018)
by: Rosdi, Munirah
Published: (2018)
To determine the customer satisfaction factor to architecture design of Malaysia high rise residential building projects during the design and planning stage / Lo Jia Woei
by: Lo, Jia Woei
Published: (2022)
by: Lo, Jia Woei
Published: (2022)
Impact Of Building Envelope Modifications On The Thermal Performance Of Glazed High-Rise Residential Buildings In The Tropics
by: Al-Tamimi, Nedhal Ahmed Mahmoud
Published: (2011)
by: Al-Tamimi, Nedhal Ahmed Mahmoud
Published: (2011)
An evaluation of bioclimatic high rise office buildings in a tropical climate: energy consumption and users' satisfaction in selected office buildings in Malaysia
by: Ismail, Lokman Hakim
Published: (2007)
by: Ismail, Lokman Hakim
Published: (2007)
Adoption of lean tools to control delays in Malaysian construction projects
by: Ansha, Richard Hannis
Published: (2016)
by: Ansha, Richard Hannis
Published: (2016)
Study on mitigation factors for controlling cost overrun in construction project
by: Abdullah, Fatehi Mansoor Saad
Published: (2018)
by: Abdullah, Fatehi Mansoor Saad
Published: (2018)
Environmental Performance Of High-Rise Apartment’s Façade In Penang, Malaysia
by: Arab, Yasser
Published: (2018)
by: Arab, Yasser
Published: (2018)
Causes and effects of poor communication in construction projects
by: Rageh Gamil, Yaser Mohammed
Published: (2020)
by: Rageh Gamil, Yaser Mohammed
Published: (2020)
Energy consumption and intensity at building construction industry
by: Apandi, Noramin
Published: (2023)
by: Apandi, Noramin
Published: (2023)
A conceptual model to improve building commissioning in construction projects: Case studies of a public institution of higher learning in Malaysia / Kho Mei Ye
by: Kho, Mei Ye
Published: (2013)
by: Kho, Mei Ye
Published: (2013)
Critical factors that impact timeliness of construction projects in Kelantan.
by: Lee, Ming Yie,
Published: (2019)
by: Lee, Ming Yie,
Published: (2019)
Relationship between significant construction safety parameters and on site safety performance of high rise building in Karachi, Sindh Province, Pakistan
by: Tarique, Muhammad
Published: (2021)
by: Tarique, Muhammad
Published: (2021)
Developing a project learning model considering fragmentation in construction / Ali Mohammed Alashwal
by: Ali Mohammed, Alashwal
Published: (2012)
by: Ali Mohammed, Alashwal
Published: (2012)
Client-related factors affecting delays in Malaysian school construction projects
by: Najuwa, Mohd Nasir
Published: (2018)
by: Najuwa, Mohd Nasir
Published: (2018)
Structural model of factors affecting pmo performance in uae mega construction projects
by: Saleh Almansoori, Maitha Taher
Published: (2022)
by: Saleh Almansoori, Maitha Taher
Published: (2022)
External factors affecting construction project performance in Iraq using pestle factors
by: Khalid, Layth Salman
Published: (2020)
by: Khalid, Layth Salman
Published: (2020)
The comparison between conventional and industrialized building system formwork towards sustainable construction
by: Mohd Bakri, Muhammad Hassan
Published: (2008)
by: Mohd Bakri, Muhammad Hassan
Published: (2008)
Development Of Supply Chain Management Framework For Building Information Modelling Implementation In Public Sector Construction Projects
by: Ahmad, Nur Hidayah
Published: (2022)
by: Ahmad, Nur Hidayah
Published: (2022)
Development Of Supply Chain Management Framework For Building Information Modelling Implementation In Public Sector Construction Projects
by: Ahmad, Nur Hidayah
Published: (2022)
by: Ahmad, Nur Hidayah
Published: (2022)
Incorporating risk mitigation into building performance rating tools (BPRTs) for Malaysia’s Higher Education Building / Natasha Khalil
by: Natasha, Khalil
Published: (2016)
by: Natasha, Khalil
Published: (2016)
Framework for integrating sustainability into the project planning process for buildings: The case of Malaysia
/ Nor Kalsum Mohd Isa
by: Mohd Isa, Nor Kalsum
Published: (2015)
by: Mohd Isa, Nor Kalsum
Published: (2015)
Factors affecting the implementation of green building development projects among housing developers in the Klang Valley, Malaysia
by: Ainul Samihah Albahori
Published: (2018)
by: Ainul Samihah Albahori
Published: (2018)
Modelling capability-based risk assessment for international construction project ventures / Loo Siaw Chuing
by: Loo, Siaw Chuing
Published: (2015)
by: Loo, Siaw Chuing
Published: (2015)
A model for organisational readiness in information technology (IT) project implementation in the Malaysian
construction industry / Nur Mardhiyah Aziz
by: Nur Mardhiyah, Aziz
Published: (2013)
by: Nur Mardhiyah, Aziz
Published: (2013)
Exploring the implementation of construction waste management (CWM) between conventional and industrial building system (IBS) construction methods in China
by: Kai, Liu
Published: (2025)
by: Kai, Liu
Published: (2025)
The Appointment Of Project Consultant In Green Construction Projects: A Proper Framework
by: Shariffuddin, Nadia Alina Amir
Published: (2017)
by: Shariffuddin, Nadia Alina Amir
Published: (2017)
A study of current design & build procurement approach practice based on the client‟s specific expectations in the Malaysian Construction Industry
by: Gambo, Muhammad Mustapha
Published: (2011)
by: Gambo, Muhammad Mustapha
Published: (2011)
Analysing parameters for energy efficiency retrofitting initiatives for high-rise buildings through an integrated approach / Siti Birkha Mohd Ali
by: Siti Birkha , Mohd Ali
Published: (2023)
by: Siti Birkha , Mohd Ali
Published: (2023)
A decision making framework for procurement method selection for building maintenance projects: The case of public Universities in Malaysia / Shirley Chua Jin Lin
by: Shirley Chua, Jin Lin
Published: (2014)
by: Shirley Chua, Jin Lin
Published: (2014)
Fire Safety And Protection Measures In Heritage Buildings With Special Consideration On Museum Buildings In Malaysia
by: Salleh, Nurul Hamiruddin
Published: (2011)
by: Salleh, Nurul Hamiruddin
Published: (2011)
Moderating Role Of Psychological Resilience On Project Manager Abusive Supervision In Construction Projects In Pakistan
by: Rafique, Muhammad
Published: (2023)
by: Rafique, Muhammad
Published: (2023)
Development of lean construction framework for 'rumah komuniti' project
by: Hashim, Md Assri
Published: (2018)
by: Hashim, Md Assri
Published: (2018)
Similar Items
-
Mitigation measures for critical factors causing cost overrun in Malaysian building projects
by: Ullah, Kaleem
Published: (2018) -
In-success factor for project management in high-rise building project
by: Yahya Al-Tawil, Yahya Mohsen
Published: (2019) -
Project Performance And Delays In Sudan
Construction Industry
by: Elhassan, Salma Abdalrahman Mohamed
Published: (2009) -
Integration of building information modelling (BIM) with materials management in construction project
by: Fayed Mogalli, Ali Hussein
Published: (2017) -
Parametric modelling of phase change materials (PCM) for enhanced energy efficiency in tropical high-rise office buildings / Zhan Haoxiang
by: Zhan , Haoxiang
Published: (2024)
