Problems associated with acceleration works and its solutions
Construction industry and delays are no longer a separable issue. In common practice, upon encountering delay the Contractor is either granted an Extension of Time (EOT) in the event of excusable delay or being charged for Liquidated Damages (LAD) in the event of non-excusable delay. Apart from thes...
| मुख्य लेखक: | Mohamad Nazir, Noor Jannah |
|---|---|
| स्वरूप: | थीसिस |
| भाषा: | अंग्रेज़ी |
| प्रकाशित: |
2016
|
| विषय: | |
| ऑनलाइन पहुंच: | http://eprints.utm.my/60961/1/NoorJannahMohamadMFAB2016.pdf |
समान संसाधन
Problems associated with evaluation of extension of time (EOT) claim in government projects
द्वारा: Mat Isa, Siti Aisah
प्रकाशित: (2014)
द्वारा: Mat Isa, Siti Aisah
प्रकाशित: (2014)
Factors affecting the preparation of the construction work programme
द्वारा: Mohamad, Mardiana
प्रकाशित: (2016)
द्वारा: Mohamad, Mardiana
प्रकाशित: (2016)
Implementation's issues and problems commissioner of building
द्वारा: Ab Rahim, Ainul Rasyidah
प्रकाशित: (2008)
द्वारा: Ab Rahim, Ainul Rasyidah
प्रकाशित: (2008)
Maintenance management problems in low-cost flats
द्वारा: Goh, Keng Chai
प्रकाशित: (2003)
द्वारा: Goh, Keng Chai
प्रकाशित: (2003)
Critical constraints of facility layout problem for Sultanah Bahiyah Library
द्वारा: Noorhadila, Mohd Bakeri
प्रकाशित: (2021)
द्वारा: Noorhadila, Mohd Bakeri
प्रकाशित: (2021)
Termination of contract : abandonment of work
द्वारा: Al Hafiz Mohd. Jamil, Mohd. Nur Iman
प्रकाशित: (2012)
द्वारा: Al Hafiz Mohd. Jamil, Mohd. Nur Iman
प्रकाशित: (2012)
Status of estimates for emergency work
द्वारा: Maidin, Noraini
प्रकाशित: (2010)
द्वारा: Maidin, Noraini
प्रकाशित: (2010)
A study of problems during construction stage for conventional housing project
द्वारा: Chong , Voon Yaw
प्रकाशित: (2004)
द्वारा: Chong , Voon Yaw
प्रकाशित: (2004)
Diminution in value of works due to deffects
द्वारा: Hashim, Norhaibati
प्रकाशित: (2011)
द्वारा: Hashim, Norhaibati
प्रकाशित: (2011)
Hidden Cost In Building Conservation Works
द्वारा: Wee, Li Woon
प्रकाशित: (2011)
द्वारा: Wee, Li Woon
प्रकाशित: (2011)
Measure of damages for defective building work
द्वारा: Wong, Bi Xia
प्रकाशित: (2009)
द्वारा: Wong, Bi Xia
प्रकाशित: (2009)
Design considerations, practices and problems : a survey of private consultant firm perspective
द्वारा: Ismail, Neza
प्रकाशित: (2004)
द्वारा: Ismail, Neza
प्रकाशित: (2004)
Health and safety in refurbishment projects involving demolition work
द्वारा: Rakhshanifar, Mansooreh
प्रकाशित: (2013)
द्वारा: Rakhshanifar, Mansooreh
प्रकाशित: (2013)
Analysis of industrialized building system block work with ETABS
द्वारा: Rahmat, Maziar Ghabel
प्रकाशित: (2013)
द्वारा: Rahmat, Maziar Ghabel
प्रकाशित: (2013)
The prevailing practice in deciding the practical completion of construction work
द्वारा: Mohd. Yunos, Mohammad Harith
प्रकाशित: (2015)
द्वारा: Mohd. Yunos, Mohammad Harith
प्रकाशित: (2015)
Termination procedures of projects by the public works department (PWD)
द्वारा: Sanusi, Intan Safina
प्रकाशित: (2015)
द्वारा: Sanusi, Intan Safina
प्रकाशित: (2015)
Interference: dispute associated with determination of own employment by contractor in construction
द्वारा: Kok, Wing Yan
प्रकाशित: (2017)
द्वारा: Kok, Wing Yan
प्रकाशित: (2017)
Pembinaan dan pengesahan instrumen persekitaran fizikal bilik darjah sekolah menengah di Malaysia
द्वारा: Nurul Jannah Amirul
प्रकाशित: (2015)
द्वारा: Nurul Jannah Amirul
प्रकाशित: (2015)
Executive information system for monitoring building construction work progress
द्वारा: Zakaria, Wan Zahran
प्रकाशित: (2013)
द्वारा: Zakaria, Wan Zahran
प्रकाशित: (2013)
Management of variation order in Public Work Department Malaysia construction project
द्वारा: Amir Mohamed, Sharil Amran
प्रकाशित: (2013)
द्वारा: Amir Mohamed, Sharil Amran
प्रकाशित: (2013)
Evaluation on current practice in work breakdown structure approach for construction schedules
द्वारा: Md. Isha, Mohd. Nasir
प्रकाशित: (2004)
द्वारा: Md. Isha, Mohd. Nasir
प्रकाशित: (2004)
Contractor's liability relating to defective works that are discovered after the defects liability period
द्वारा: Leong, Mei Wan
प्रकाशित: (2010)
द्वारा: Leong, Mei Wan
प्रकाशित: (2010)
Issues associates with communicating the architect notice by means of e-mail under PAM 2006
द्वारा: Sainee, Norazean
प्रकाशित: (2015)
द्वारा: Sainee, Norazean
प्रकाशित: (2015)
Contractor's liabilities towards employer's defective building work claims during defect liability period
द्वारा: Lim, Tze Shwan
प्रकाशित: (2011)
द्वारा: Lim, Tze Shwan
प्रकाशित: (2011)
Meshfree formulation for inverse frequencies analysis incorporating artificial neural network
द्वारा: Abd. Nazir, Mohd. Zhafri Jamil
प्रकाशित: (2013)
द्वारा: Abd. Nazir, Mohd. Zhafri Jamil
प्रकाशित: (2013)
The cost overruns in green building development : case study Ministry of Public Works new green building project Republic of Indonesia
द्वारा: Putro, Anggoro
प्रकाशित: (2012)
द्वारा: Putro, Anggoro
प्रकाशित: (2012)
Properties Of Foamed Concrete With Oil Palm Ash Inclusion And Its Application As An Interlocking Mortarless Block
द्वारा: Abdulameer, Mohammed Zuhear
प्रकाशित: (2015)
द्वारा: Abdulameer, Mohammed Zuhear
प्रकाशित: (2015)
An approach to manage termination due to national interest in clause 52.0 OF public work department form 203A (REV.1/2010).
द्वारा: Mansor, Lydiana
प्रकाशित: (2022)
द्वारा: Mansor, Lydiana
प्रकाशित: (2022)
Development of a building energy analysis package (BEAP) and its application to the analysis of cool thermal energy storage systems
द्वारा: Senawi, Mohd. Yusoff
प्रकाशित: (1999)
द्वारा: Senawi, Mohd. Yusoff
प्रकाशित: (1999)
Punca dan impak perubahan kerja dalam projek milik UDA Holdings Berhad (UDA)
द्वारा: Abu Bakar, Mohamad Noor Ropiah
प्रकाशित: (2008)
द्वारा: Abu Bakar, Mohamad Noor Ropiah
प्रकाशित: (2008)
Prevalent Tender Preparation Practices For Building Conservation Works
द्वारा: Lee , Qin Yin
प्रकाशित: (2009)
द्वारा: Lee , Qin Yin
प्रकाशित: (2009)
Extension of time in commencement of arbitration proceedings
द्वारा: Mokhtar, Noor Halwani
प्रकाशित: (2012)
द्वारा: Mokhtar, Noor Halwani
प्रकाशित: (2012)
Issues relating to contract administrator's instruction
द्वारा: Khiyon, Noor Azeyah
प्रकाशित: (2011)
द्वारा: Khiyon, Noor Azeyah
प्रकाशित: (2011)
Flood damage and risk assessment for urban area in Segamat
द्वारा: Noor Suraya, Romali
प्रकाशित: (2018)
द्वारा: Noor Suraya, Romali
प्रकाशित: (2018)
Self assessment green building index for residential estates
द्वारा: Baharin, Noor Hamizah
प्रकाशित: (2012)
द्वारा: Baharin, Noor Hamizah
प्रकाशित: (2012)
Variation order in lump sum contract
द्वारा: Mohayidin, Noor Amalina
प्रकाशित: (2014)
द्वारा: Mohayidin, Noor Amalina
प्रकाशित: (2014)
Affordances of home-school journey as a play and learning environment for rural middle childhood children
द्वारा: Yatiman, Noor Ain
प्रकाशित: (2014)
द्वारा: Yatiman, Noor Ain
प्रकाशित: (2014)
A study on identifying factors affecting project performance on road construction project
द्वारा: Taufik, Mohamad
प्रकाशित: (2012)
द्वारा: Taufik, Mohamad
प्रकाशित: (2012)
The structural behaviour of precast lightweight foamed concrete sandwich panel as a load bearing wall
द्वारा: Mohamad, Noridah
प्रकाशित: (2010)
द्वारा: Mohamad, Noridah
प्रकाशित: (2010)
Challenges for improving the quality of the construction industry
द्वारा: Adnan, Noor Azizah
प्रकाशित: (2008)
द्वारा: Adnan, Noor Azizah
प्रकाशित: (2008)
समान संसाधन
-
Problems associated with evaluation of extension of time (EOT) claim in government projects
द्वारा: Mat Isa, Siti Aisah
प्रकाशित: (2014) -
Factors affecting the preparation of the construction work programme
द्वारा: Mohamad, Mardiana
प्रकाशित: (2016) -
Implementation's issues and problems commissioner of building
द्वारा: Ab Rahim, Ainul Rasyidah
प्रकाशित: (2008) -
Maintenance management problems in low-cost flats
द्वारा: Goh, Keng Chai
प्रकाशित: (2003) -
Critical constraints of facility layout problem for Sultanah Bahiyah Library
द्वारा: Noorhadila, Mohd Bakeri
प्रकाशित: (2021)