Construction claims in the fast track mega infrastructure projects of Saudi Arabian Construction Industry
The construction industry has rapidly grown in Saudi Arabia and there are many upcoming projects to be finished in a limited time to meet the Saudi Vision 2030. Due to the shortage of time, most of the projects are managed by fast track system. It has been observed that the number and amount of c...
| Main Author: | Shaikh, Haseeb Halim |
|---|---|
| Format: | Dissertation |
| Language: | English English English |
| Published: |
2021
|
| Subjects: | |
| Online Access: | http://eprints.uthm.edu.my/6439/ |
| Abstract | Abstract here |
Similar Items
Factors affecting cost overrun at construction projects in Somalia
by: Osman, Yusuf Hussein
Published: (2019)
by: Osman, Yusuf Hussein
Published: (2019)
Risk of construction corruption factors in construction project life cycle from contractors’ perspectives
by: Mohd Saim, Nur Amylia Izrin
Published: (2021)
by: Mohd Saim, Nur Amylia Izrin
Published: (2021)
In-success factor for project management in high-rise building project
by: Yahya Al-Tawil, Yahya Mohsen
Published: (2019)
by: Yahya Al-Tawil, Yahya Mohsen
Published: (2019)
Management factors affecting time and cost performance of construction projects
by: Chin Foo, Lee
Published: (2021)
by: Chin Foo, Lee
Published: (2021)
Static strength of tubular DT joints using lusas finite element software
by: Abd. Rahman, Norashidah
Published: (2005)
by: Abd. Rahman, Norashidah
Published: (2005)
The competency criteria of Building Information Modelling (BIM) managers among construction stakeholders in Malaysia / Nurmazlina Nabilah Mohd Azmi
by: Mohd Azmi, Nurmazlina Nabilah
Published: (2022)
by: Mohd Azmi, Nurmazlina Nabilah
Published: (2022)
Structural model of factors affecting pmo performance in uae mega construction projects
by: Saleh Almansoori, Maitha Taher
Published: (2022)
by: Saleh Almansoori, Maitha Taher
Published: (2022)
Application and the challenges of fast track project in Malaysia construction industry
by: Saidatul Syahira Rizal
Published: (2025)
by: Saidatul Syahira Rizal
Published: (2025)
3-state Potts model with competing binary-ternary-quarternary interactions on Cayley tree of order 2 and 3
by: Nurul Farahana Ififi Omar Baki
Published: (2024)
by: Nurul Farahana Ififi Omar Baki
Published: (2024)
Optimization of modified sol-gel method for the formation of tetragonal phase zirconia in Zr(IV)/Ce(IV) catalyst (Full text)
Published: (2025)
Published: (2025)
Legal analysis of construction defect claims within common law jurisdictions for Malaysia / Teng Kam Wah
by: Teng, Kam Wah
Published: (2018)
by: Teng, Kam Wah
Published: (2018)
Reservation of rights in construction claims
by: Larika Kay Baldestamon Salcedo
Published: (2025)
by: Larika Kay Baldestamon Salcedo
Published: (2025)
Profile of construction contractual claims
by: Nur Jazlianna Samsudin
Published: (2025)
by: Nur Jazlianna Samsudin
Published: (2025)
Factors causing incidents in a mega construction project: A qualitative study in Klang Valley
by: Chuah, Chong Ken
Published: (2019)
by: Chuah, Chong Ken
Published: (2019)
Factors causing incidents in a mega construction project: A qualitative study in Klang Valley
by: Chuah, Chong Ken
Published: (2018)
by: Chuah, Chong Ken
Published: (2018)
The effect of coating condition and aqueous phase composition on the performance of thin film composite reverse osmosis flat sheet membranes (Full text)
Published: (2025)
Published: (2025)
Loss and/or expense claim in construction contract
by: Hayati Abdul Wahid
Published: (2025)
by: Hayati Abdul Wahid
Published: (2025)
An information technology infrastructure flexibility (ITIF) preliminary model for construction industry
/ Nurshuhada Zainon
by: Nurshuhada, Zainon
Published: (2013)
by: Nurshuhada, Zainon
Published: (2013)
Management and handling of construction materials in the construction supply chain, the effect on construction performance
by: Mat Zin, Zainul Azman
Published: (1999)
by: Mat Zin, Zainul Azman
Published: (1999)
Development of performance measurement tool (PMT) for operational and maintenance phase in Malaysian Public Private Partnership (PPP) projects / Nor Suzila Lop
by: Lop, Nor Suzila
Published: (2019)
by: Lop, Nor Suzila
Published: (2019)
Hubungan Faktor-Faktor Risiko Dengan Tuntutan Di Dalam Projek 'Fast Track'
by: Othman, Maznah
Published: (1997)
by: Othman, Maznah
Published: (1997)
Causes and effects of poor communication in construction projects
by: Rageh Gamil, Yaser Mohammed
Published: (2020)
by: Rageh Gamil, Yaser Mohammed
Published: (2020)
Design of 477MHZ mixed signal phase - locked loop (PLL) for CMOS RF transceiver
by: Nurul'ain Fadzli
Published: (2025)
by: Nurul'ain Fadzli
Published: (2025)
Critical factors that impact timeliness of construction projects in Kelantan.
by: Lee, Ming Yie,
Published: (2019)
by: Lee, Ming Yie,
Published: (2019)
Technology Transfer (TT) : level of absorptive cap a city and technological capabilities in mega construction projects / Roshartini Omar
by: Omar, Roshartini
Published: (2012)
by: Omar, Roshartini
Published: (2012)
Improving construction materials management practices in construction sites
by: Ahmed, Fuad Hassan
Published: (2017)
by: Ahmed, Fuad Hassan
Published: (2017)
Psychological Adjustment Of Saudi Arabian Postgraduate Students In Malaysia
by: Khalaf A., Alshammari Majid
Published: (2023)
by: Khalaf A., Alshammari Majid
Published: (2023)
Overcoming causes of claim disputes in construction projects: a dematel based model
by: Siti Nur Farhain, Mohd Yusri
Published: (2023)
by: Siti Nur Farhain, Mohd Yusri
Published: (2023)
Safety compliance for hihg rise projects in Nigerian construction Industry
by: Mohammed Kabir, Kaigama
Published: (2015)
by: Mohammed Kabir, Kaigama
Published: (2015)
Growth factors of construction firms in Kota Kinabalu, Sabah
by: Lim, Shin Tarn
Published: (2007)
by: Lim, Shin Tarn
Published: (2007)
A procedural framework for construction claim in Malaysian construction industry / Nor Azmi Bakhary
by: Bakhary, Nor Azmi
Published: (2019)
by: Bakhary, Nor Azmi
Published: (2019)
Project Performance And Delays In Sudan
Construction Industry
by: Elhassan, Salma Abdalrahman Mohamed
Published: (2009)
by: Elhassan, Salma Abdalrahman Mohamed
Published: (2009)
Construction of multiple design and build bridge projects: case study in Sabah
by: Chidambaram Ramanathan
Published: (2018)
by: Chidambaram Ramanathan
Published: (2018)
Integration of building information modelling (BIM) with materials management in construction project
by: Fayed Mogalli, Ali Hussein
Published: (2017)
by: Fayed Mogalli, Ali Hussein
Published: (2017)
Measures for mitigating the delay in high-rise building construction projects in Dubai
by: Bhatti, Imtiaz Ali
Published: (2019)
by: Bhatti, Imtiaz Ali
Published: (2019)
An enhancement of the application for fast track arbitration in the Malaysian construction industry / Nur Khodijah Muhammad Fadhlullah Ng
by: Muhammad Fadhlullah Ng, Nur Khodijah
Published: (2020)
by: Muhammad Fadhlullah Ng, Nur Khodijah
Published: (2020)
Classical aspect of uncertainty principle for spin angular momentum in geometric quantum mechanics
by: Abdul Halim, Umair
Published: (2021)
by: Abdul Halim, Umair
Published: (2021)
External factors affecting construction project performance in Iraq using pestle factors
by: Khalid, Layth Salman
Published: (2020)
by: Khalid, Layth Salman
Published: (2020)
Development of lean construction framework for 'rumah komuniti' project
by: Hashim, Md Assri
Published: (2018)
by: Hashim, Md Assri
Published: (2018)
The Appointment Of Project Consultant In Green Construction Projects: A Proper Framework
by: Shariffuddin, Nadia Alina Amir
Published: (2017)
by: Shariffuddin, Nadia Alina Amir
Published: (2017)
Similar Items
-
Factors affecting cost overrun at construction projects in Somalia
by: Osman, Yusuf Hussein
Published: (2019) -
Risk of construction corruption factors in construction project life cycle from contractors’ perspectives
by: Mohd Saim, Nur Amylia Izrin
Published: (2021) -
In-success factor for project management in high-rise building project
by: Yahya Al-Tawil, Yahya Mohsen
Published: (2019) -
Management factors affecting time and cost performance of construction projects
by: Chin Foo, Lee
Published: (2021) -
Static strength of tubular DT joints using lusas finite element software
by: Abd. Rahman, Norashidah
Published: (2005)
