The change in roles of architects and quantity surveyor's from conventional to partnering approach
Architects and quantity surveyors are among the principal stakeholder using partnering. Partnering is intended to improve the way projects are designed and constructed. Consequently, partnering has an impact on the design and construction process. This research project aims to investigate how...
| Main Author: | Suratkon, Azeanita |
|---|---|
| Format: | Thesis |
| Language: | English |
| Published: |
2004
|
| Subjects: | |
| Online Access: | http://eprints.uthm.edu.my/7303/ |
| Abstract | Abstract here |
Similar Items
The change in roles of architec's and quantity surveyor's from conventional to partnering approach
by: Suratkon, Azeanita
Published: (2004)
by: Suratkon, Azeanita
Published: (2004)
Continuous improvement CSF framework for assessing CI maturity in ISO and non-ISO certified construction contracting organizations
by: Hamid, Hashima
Published: (2015)
by: Hamid, Hashima
Published: (2015)
Kajian persepsi kontraktor terhadap kelewatan menyiapkan projek-projek kerajaan persekutuan di negeri Sabah
by: Alan Abdul Rahim
Published: (2008)
by: Alan Abdul Rahim
Published: (2008)
Risk assessment of time and cost overrun factors throughout construction project lifecycle
by: Ismail, Ismaaini
Published: (2014)
by: Ismail, Ismaaini
Published: (2014)
Ethical decision-making practice among Malaysian consultant quantity surveyors
by: Hashim, Nor Atikah
Published: (2019)
by: Hashim, Nor Atikah
Published: (2019)
Reasons for and deterrents to the participation of Malaysian registered quantity surveyors in continuing professional development activities / Mohd Hisham Ariffin
by: ARIFFIN, MOHD HISHAM
Published: (2004)
by: ARIFFIN, MOHD HISHAM
Published: (2004)
The relationship between work stress factors and job satisfaction among quantity surveyors at consultant firms in Kuching, Sarawak
by: Teng, Michael Loong Ing
Published: (2011)
by: Teng, Michael Loong Ing
Published: (2011)
Architect's duties in relation to supervision of construction projects
by: Sharisa Hussein
Published: (2025)
by: Sharisa Hussein
Published: (2025)
Changing roles of domestic partners in joint ventures : a case study of Malaysia's electronics sector / Amit Bhardwaj
by: Bhardwaj, Amit
Published: (1998)
by: Bhardwaj, Amit
Published: (1998)
Construction partnering : legal and contractual issue
by: Yeap, Chu Im
Published: (2025)
by: Yeap, Chu Im
Published: (2025)
Developing a building contract administration framework for graduate architects managing housing projects / Tiew Si Yee
by: Tiew , Si Yee
Published: (2024)
by: Tiew , Si Yee
Published: (2024)
The implementation of Industrialised Building System (IBS) in Malaysia from architects' and engineers' perspective
by: Qureshi, Sara Latif
Published: (2024)
by: Qureshi, Sara Latif
Published: (2024)
A conceptual model of partnering legal issues
by: Faraziera Mohd. Raslim
Published: (2025)
by: Faraziera Mohd. Raslim
Published: (2025)
The Extent Of Architect's Integration Into The
Design & Build Construction Process
In Peninsular Malaysia.
by: Tan , Seong Yeow
Published: (2002)
by: Tan , Seong Yeow
Published: (2002)
The importance of landscape architects in the green building index (GBI) practice
by: Norhanis Diyana Nizarudin
Published: (2024)
by: Norhanis Diyana Nizarudin
Published: (2024)
Aesthetic differences between architects and non-architects in residential facade design
by: Mohammed Ghomeishi
Published: (2025)
by: Mohammed Ghomeishi
Published: (2025)
An evaluation of effectiveness of approximate quantity method in estimating construction cost
by: Siew, Sik Nguong
Published: (2025)
by: Siew, Sik Nguong
Published: (2025)
An investigation into the usage of information technology in quantity surveying firms in the Klang Valley
by: Raden Sugijanto, Raden Iman Darmawan
Published: (2000)
by: Raden Sugijanto, Raden Iman Darmawan
Published: (2000)
Architect's design liability
by: Aizat Fahmi Ahmad
Published: (2025)
by: Aizat Fahmi Ahmad
Published: (2025)
Factors influencing outsourcing success in Malaysian automotive industry: The roles of degree of outsourcing and partner’s compatibility / Kashif Latif
by: Kashif , Latif
Published: (2019)
by: Kashif , Latif
Published: (2019)
A procedure for minimization of nosocomial infections risk through upgrading and re-architecting of healthcare facilities
by: Parsia, Yasaman
Published: (2019)
by: Parsia, Yasaman
Published: (2019)
The relationship of strategic network partner fit characteristics, open innovation and organisational performance of small and medium enterprises in Malaysia
by: Che Asniza, Osman
Published: (2023)
by: Che Asniza, Osman
Published: (2023)
Homeowners' and architects' perspectives on wood and wood products as preferred material for building construction in Malaysia
by: Ab Latib, Hazirah
Published: (2020)
by: Ab Latib, Hazirah
Published: (2020)
A Study Of The Traditional Characteristics Of Yemeni
Houses In The Port City Of Aden And Mukalla: Perception Of
Architects And Students
by: Binthabet, Aqeil Ahmed
Published: (2007)
by: Binthabet, Aqeil Ahmed
Published: (2007)
Architects liability in issuing certificates
by: Siti Fatin Fatehah Pauzi
Published: (2025)
by: Siti Fatin Fatehah Pauzi
Published: (2025)
The relationship between service delivery differentiation and architect's specifications: The study of metal roofing industry in Sabah
by: Judith Ignatius Otau
Published: (2006)
by: Judith Ignatius Otau
Published: (2006)
Standard guidelines for bill of quantities customised for building conservation works: The Malaysian context / Lim Yoke Mui
by: Lim, Yoke Mui
Published: (2017)
by: Lim, Yoke Mui
Published: (2017)
Architect liability during inspection of work
by: Anwar Mohd. Apandi
Published: (2025)
by: Anwar Mohd. Apandi
Published: (2025)
Determinants Of Effective Supply Chain
Partnering In The Context Of Electrical And
Electronics Firms In Malaysia
by: Rajagopal, Premkumar
Published: (2006)
by: Rajagopal, Premkumar
Published: (2006)
Challenges faced by architect as a project manager
by: Mohammad Mir Ghasemi
Published: (2025)
by: Mohammad Mir Ghasemi
Published: (2025)
Consultant architect's diligence in rail infrastructure project
by: Shams-Arida Ariffin
Published: (2025)
by: Shams-Arida Ariffin
Published: (2025)
Partnering approach to support collaborative working environment in Mecca construction industry
by: Jamal Fawzi Taj
Published: (2025)
by: Jamal Fawzi Taj
Published: (2025)
Managerial decision making capabilities framework in adopting technology innovation within quantity surveying organisations
by: Mazura Mahdzir
Published: (2024)
by: Mazura Mahdzir
Published: (2024)
Effects of CFRP on reinforced conventional concrete and ultra high performance concrete frames
by: Ali, Shahnaz Basim
Published: (2017)
by: Ali, Shahnaz Basim
Published: (2017)
Strategic partner role as mediator in the relationship between human resource competencies and organizational performance
by: Uti Charles Amechi
Published: (2025)
by: Uti Charles Amechi
Published: (2025)
Architect’s perception of factors contributing to construction project delay In planning & design phase:
Case studies of private housing projects In Klang Valley, Malaysia / Ong Wee Yeak
by: Wee Yeak, Ong
Published: (2022)
by: Wee Yeak, Ong
Published: (2022)
Propensity of architects to commit fraudulent certification in Malaysian housing development projects
by: Yong, Kum Weng
Published: (2025)
by: Yong, Kum Weng
Published: (2025)
Framework for delivering successful partnering projects in Negeria
by: Ola-Awo Adeniran Wasiu
Published: (2025)
by: Ola-Awo Adeniran Wasiu
Published: (2025)
Examining the role of individual’s commitment, trust in
management and communication on readiness for change
by: Ikechukwu, Ibekwe Sampson
Published: (2022)
by: Ikechukwu, Ibekwe Sampson
Published: (2022)
Online Bill of Quantity for Building and Civil Works
by: Mohd. Akhbar, Yahya
Published: (2003)
by: Mohd. Akhbar, Yahya
Published: (2003)
Similar Items
-
The change in roles of architec's and quantity surveyor's from conventional to partnering approach
by: Suratkon, Azeanita
Published: (2004) -
Continuous improvement CSF framework for assessing CI maturity in ISO and non-ISO certified construction contracting organizations
by: Hamid, Hashima
Published: (2015) -
Kajian persepsi kontraktor terhadap kelewatan menyiapkan projek-projek kerajaan persekutuan di negeri Sabah
by: Alan Abdul Rahim
Published: (2008) -
Risk assessment of time and cost overrun factors throughout construction project lifecycle
by: Ismail, Ismaaini
Published: (2014) -
Ethical decision-making practice among Malaysian consultant quantity surveyors
by: Hashim, Nor Atikah
Published: (2019)
