Sistem pengurusan kualiti : proses penyerahan tapak pembinaan

In recent years, too many construction projects developed rapidly until neglected to hand over completed construction site on time. This is due to the parties involved in the process handing over site does not have a clear knowledge about the procedure and documents required to deliver the construct...

詳細記述

書誌詳細
第一著者: Abu Bakar, Nur Adila
フォーマット: 学位論文
言語:英語
出版事項: 2014
主題:
オンライン・アクセス:http://eprints.utm.my/78364/1/NurAdilaAbuMFGHT2014.pdf
_version_ 1846217904837623808
author Abu Bakar, Nur Adila
author_facet Abu Bakar, Nur Adila
author_sort Abu Bakar, Nur Adila
description In recent years, too many construction projects developed rapidly until neglected to hand over completed construction site on time. This is due to the parties involved in the process handing over site does not have a clear knowledge about the procedure and documents required to deliver the construction site. Therefore, this research was conducted to achieve two (2) objectives related to proses hand over completed site from contractor to owner. Objective (1) is to identify a standard checklist document to be submitted during the hand over completed site and objective (2) are to develop a process of handing over completed site. Interviews and documentation analysis of expert opinion on the six (6) of case study was carried out to gather information and data to assist in achieving the objectives. It found that a set of guidelines relating to the procedures and documents required to be submitted during hand over completed site should be established as a reference to the parties involved in construction industry. By using the guidelines, it becomes clearer to the parties to follow and it will delivered on time. Finally, this study also provides some suggestions to increase the effectiveness of hand over process so that the delay on hand over completed site is not going to be severe
format Thesis
id uthm-78364
institution Universiti Teknologi Malaysia
language English
publishDate 2014
record_format eprints
spelling uthm-783642018-08-26T04:53:31Z http://eprints.utm.my/78364/ Sistem pengurusan kualiti : proses penyerahan tapak pembinaan Abu Bakar, Nur Adila G70.212-70.215 Geographic information system In recent years, too many construction projects developed rapidly until neglected to hand over completed construction site on time. This is due to the parties involved in the process handing over site does not have a clear knowledge about the procedure and documents required to deliver the construction site. Therefore, this research was conducted to achieve two (2) objectives related to proses hand over completed site from contractor to owner. Objective (1) is to identify a standard checklist document to be submitted during the hand over completed site and objective (2) are to develop a process of handing over completed site. Interviews and documentation analysis of expert opinion on the six (6) of case study was carried out to gather information and data to assist in achieving the objectives. It found that a set of guidelines relating to the procedures and documents required to be submitted during hand over completed site should be established as a reference to the parties involved in construction industry. By using the guidelines, it becomes clearer to the parties to follow and it will delivered on time. Finally, this study also provides some suggestions to increase the effectiveness of hand over process so that the delay on hand over completed site is not going to be severe 2014-01 Thesis NonPeerReviewed application/pdf en http://eprints.utm.my/78364/1/NurAdilaAbuMFGHT2014.pdf Abu Bakar, Nur Adila (2014) Sistem pengurusan kualiti : proses penyerahan tapak pembinaan. Masters thesis, Universiti Teknologi Malaysia, Faculty of Geoinformation and Real Estate. http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:96607
spellingShingle G70.212-70.215 Geographic information system
Abu Bakar, Nur Adila
Sistem pengurusan kualiti : proses penyerahan tapak pembinaan
title Sistem pengurusan kualiti : proses penyerahan tapak pembinaan
title_full Sistem pengurusan kualiti : proses penyerahan tapak pembinaan
title_fullStr Sistem pengurusan kualiti : proses penyerahan tapak pembinaan
title_full_unstemmed Sistem pengurusan kualiti : proses penyerahan tapak pembinaan
title_short Sistem pengurusan kualiti : proses penyerahan tapak pembinaan
title_sort sistem pengurusan kualiti proses penyerahan tapak pembinaan
topic G70.212-70.215 Geographic information system
url http://eprints.utm.my/78364/1/NurAdilaAbuMFGHT2014.pdf
url-record http://eprints.utm.my/78364/
http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:96607
work_keys_str_mv AT abubakarnuradila sistempengurusankualitiprosespenyerahantapakpembinaan