Legislative measures in protecting the environment for future project developments
As we know that climate change was mother of all environmental problems. Current environmental issues in Malaysia are pollution problems beginning from traditional industries, water pollution problems, air pollution problems, waste problems and other environmental problems such as deforestation, soi...
| मुख्य लेखक: | Che Pa, Mariana |
|---|---|
| स्वरूप: | थीसिस |
| भाषा: | अंग्रेज़ी |
| प्रकाशित: |
2017
|
| विषय: | |
| ऑनलाइन पहुंच: | http://eprints.utm.my/78778/1/MarianaChePaMFAB2017.pdf |
समान संसाधन
Project Communication And Project Performance: Case Of Software Development In Manufacturing Environment
द्वारा: Gan, Tan Chen Rong
प्रकाशित: (2018)
द्वारा: Gan, Tan Chen Rong
प्रकाशित: (2018)
Fire Safety And Protection Measures In Heritage Buildings With Special Consideration On Museum Buildings In Malaysia
द्वारा: Salleh, Nurul Hamiruddin
प्रकाशित: (2011)
द्वारा: Salleh, Nurul Hamiruddin
प्रकाशित: (2011)
Development of an apparatus for the measurement of thermal conductivity of building materials
द्वारा: Kamsah, Nazri
प्रकाशित: (1988)
द्वारा: Kamsah, Nazri
प्रकाशित: (1988)
Strategies for preventing the premature and fault certification of housing development project
द्वारा: Yong, Kum Weng
प्रकाशित: (2012)
द्वारा: Yong, Kum Weng
प्रकाशित: (2012)
Project viability framework for privatized highway projects in Malaysia
द्वारा: Mohamed @ Mohd. Adnan, Azmi
प्रकाशित: (2018)
द्वारा: Mohamed @ Mohd. Adnan, Azmi
प्रकाशित: (2018)
A multi-criteria generic process model for selecting fire protection system
द्वारा: Quah, Lee Hui
प्रकाशित: (2012)
द्वारा: Quah, Lee Hui
प्रकाशित: (2012)
Factors affecting the implementation of green building development projects among housing developers in the Klang Valley, Malaysia
द्वारा: Ainul Samihah Albahori
प्रकाशित: (2018)
द्वारा: Ainul Samihah Albahori
प्रकाशित: (2018)
A study on identifying factors affecting project performance on road construction project
द्वारा: Taufik, Mohamad
प्रकाशित: (2012)
द्वारा: Taufik, Mohamad
प्रकाशित: (2012)
Mutual termination of contract in construction projects
द्वारा: Jambol, Awang Muhamad
प्रकाशित: (2011)
द्वारा: Jambol, Awang Muhamad
प्रकाशित: (2011)
Monitoring and control methods for construction projects
द्वारा: Shanmugam, Arvindran
प्रकाशित: (2004)
द्वारा: Shanmugam, Arvindran
प्रकाशित: (2004)
Measure of damages for defective building work
द्वारा: Wong, Bi Xia
प्रकाशित: (2009)
द्वारा: Wong, Bi Xia
प्रकाशित: (2009)
Investigation of thermal comfort in factory environment
द्वारा: Husain, Adnan
प्रकाशित: (1997)
द्वारा: Husain, Adnan
प्रकाशित: (1997)
The Influence Of Uncertainty Variables On
Project Cost Estimation
द्वारा: Rauzana, Anita
प्रकाशित: (2015)
द्वारा: Rauzana, Anita
प्रकाशित: (2015)
Recovery plan strategy on the delay construction project
द्वारा: Ku Ismail, Ku Adenan
प्रकाशित: (2004)
द्वारा: Ku Ismail, Ku Adenan
प्रकाशित: (2004)
Architect's duties in relation to supervision of construction projects
द्वारा: Hussein, Sharisa
प्रकाशित: (2013)
द्वारा: Hussein, Sharisa
प्रकाशित: (2013)
The study on the implementation of design and build projects in DID
द्वारा: Aminudin, Nurul Huda
प्रकाशित: (2011)
द्वारा: Aminudin, Nurul Huda
प्रकाशित: (2011)
Challenges in rescue project towards procurement method
द्वारा: Abdul Hadi, Aliff Azize
प्रकाशित: (2022)
द्वारा: Abdul Hadi, Aliff Azize
प्रकाशित: (2022)
Managing construction of telecommunication tower projects in Celcom
द्वारा: Pison, Zirwatul Hana
प्रकाशित: (2007)
द्वारा: Pison, Zirwatul Hana
प्रकाशित: (2007)
Project Success factors for design-build system
द्वारा: Ab. Wahab, Mohd. Saupi
प्रकाशित: (2004)
द्वारा: Ab. Wahab, Mohd. Saupi
प्रकाशित: (2004)
Causes and steps to minimize variations in construction projects
द्वारा: Ali, Ahmad Zaki
प्रकाशित: (2008)
द्वारा: Ali, Ahmad Zaki
प्रकाशित: (2008)
The cost overruns in green building development : case study Ministry of Public Works new green building project Republic of Indonesia
द्वारा: Putro, Anggoro
प्रकाशित: (2012)
द्वारा: Putro, Anggoro
प्रकाशित: (2012)
Design & build as project delivery system : the potential application in Bank Pembangunan & Infrastruktur Malaysia Berhad (BPIMB) factory complex's development
द्वारा: Wan Hamdan, Wan Samsul Zamani
प्रकाशित: (2004)
द्वारा: Wan Hamdan, Wan Samsul Zamani
प्रकाशित: (2004)
Study on the management of engineering procurement and construction (EPC) project
द्वारा: Seng, Hansen
प्रकाशित: (2012)
द्वारा: Seng, Hansen
प्रकाशित: (2012)
Health and safety in refurbishment projects involving demolition work
द्वारा: Rakhshanifar, Mansooreh
प्रकाशित: (2013)
द्वारा: Rakhshanifar, Mansooreh
प्रकाशित: (2013)
Project management consultant (PMC) in Sudanese construction industry
द्वारा: Mohamed, Abdeliazim Mustafa
प्रकाशित: (2011)
द्वारा: Mohamed, Abdeliazim Mustafa
प्रकाशित: (2011)
Termination procedures of projects by the public works department (PWD)
द्वारा: Sanusi, Intan Safina
प्रकाशित: (2015)
द्वारा: Sanusi, Intan Safina
प्रकाशित: (2015)
Claims for additional preliminaries costs due to project prolongation
द्वारा: Saidin, Aminuddin
प्रकाशित: (2015)
द्वारा: Saidin, Aminuddin
प्रकाशित: (2015)
Reverse logistic for industrial building system construction project
द्वारा: Buniya, Mohanad Kamil
प्रकाशित: (2014)
द्वारा: Buniya, Mohanad Kamil
प्रकाशित: (2014)
The challenges faced by government contractors in managing the flyover projects
द्वारा: Kurniawan, Lutfi
प्रकाशित: (2015)
द्वारा: Kurniawan, Lutfi
प्रकाशित: (2015)
Framework to reduce variation processing time in public projects
द्वारा: Abdul Kadir, Munirah
प्रकाशित: (2018)
द्वारा: Abdul Kadir, Munirah
प्रकाशित: (2018)
Profiling of extension of time cases in Malaysian construction projects
द्वारा: Abdul Latif, Abdul Hafiz
प्रकाशित: (2022)
द्वारा: Abdul Latif, Abdul Hafiz
प्रकाशित: (2022)
Cost planning in water resources infrastructure maintenance project
द्वारा: Rachmadi, Erwando
प्रकाशित: (2011)
द्वारा: Rachmadi, Erwando
प्रकाशित: (2011)
The effects of procurement methods on performance of construction projects in Malaysia
द्वारा: Hashim, Maizon
प्रकाशित: (1999)
द्वारा: Hashim, Maizon
प्रकाशित: (1999)
Information management to integrate cost and schedule for infrastructure projects
द्वारा: Chung , Keat Wei
प्रकाशित: (2004)
द्वारा: Chung , Keat Wei
प्रकाशित: (2004)
'Third place' environment in residential school design in Malaysia
द्वारा: Raja Mohd. Yazit, Raja Nur Syaheeza
प्रकाशित: (2015)
द्वारा: Raja Mohd. Yazit, Raja Nur Syaheeza
प्रकाशित: (2015)
Improving project delivery process using lean construction approach
द्वारा: Adamu, Samaila
प्रकाशित: (2017)
द्वारा: Adamu, Samaila
प्रकाशित: (2017)
Implementation of microsoft project to improve conventional construction reporting system
द्वारा: Liew , Eric Cheok Fai
प्रकाशित: (2004)
द्वारा: Liew , Eric Cheok Fai
प्रकाशित: (2004)
Refurbishment project management system for commercial highrise buildings in Malaysia
द्वारा: Seong, Pick Choong
प्रकाशित: (2003)
द्वारा: Seong, Pick Choong
प्रकाशित: (2003)
The effect multiple lightning impulse on the electrical breakdown voltage insulation resistance and isolation capacitance characteristics an opto-isolator as a low voltage surge protective device
द्वारा: Abdul Hamid, Mohd. Fairuz
प्रकाशित: (2007)
द्वारा: Abdul Hamid, Mohd. Fairuz
प्रकाशित: (2007)
Management of variation order in Public Work Department Malaysia construction project
द्वारा: Amir Mohamed, Sharil Amran
प्रकाशित: (2013)
द्वारा: Amir Mohamed, Sharil Amran
प्रकाशित: (2013)
समान संसाधन
-
Project Communication And Project Performance: Case Of Software Development In Manufacturing Environment
द्वारा: Gan, Tan Chen Rong
प्रकाशित: (2018) -
Fire Safety And Protection Measures In Heritage Buildings With Special Consideration On Museum Buildings In Malaysia
द्वारा: Salleh, Nurul Hamiruddin
प्रकाशित: (2011) -
Development of an apparatus for the measurement of thermal conductivity of building materials
द्वारा: Kamsah, Nazri
प्रकाशित: (1988) -
Strategies for preventing the premature and fault certification of housing development project
द्वारा: Yong, Kum Weng
प्रकाशित: (2012) -
Project viability framework for privatized highway projects in Malaysia
द्वारा: Mohamed @ Mohd. Adnan, Azmi
प्रकाशित: (2018)