Determination of work-rest schedule based on fatigue among welders at construction of marine facility Pengerang project
This study is keen on Determination of Work-Rest Schedule Based on Fatigue Among Welders at Construction of Marine Facility Pengerang Project that could help construction company in Malaysia to gain information and knowledge about fatigue during welding work. A welding work as common practicing meth...
| मुख्य लेखक: | Jumari, Rozazila |
|---|---|
| स्वरूप: | थीसिस |
| भाषा: | अंग्रेज़ी |
| प्रकाशित: |
2017
|
| विषय: | |
| ऑनलाइन पहुंच: | http://eprints.utm.my/79024/1/RozazilaJumariMFKM2017.pdf |
समान संसाधन
The effect of work rest schedules and type of cognitive workload on mental fatigue
द्वारा: Muhamad, Ahmad Badrul Hakim
प्रकाशित: (2016)
द्वारा: Muhamad, Ahmad Badrul Hakim
प्रकाशित: (2016)
The impact of work-rest scheduling on prolonged standing activity
द्वारा: Mohamad, Norlizaa
प्रकाशित: (2017)
द्वारा: Mohamad, Norlizaa
प्रकाशित: (2017)
The impact of work rest scheduling on prolonged standing activity in a Malaysian electronic company
द्वारा: Rohanai, Reyanhealme
प्रकाशित: (2016)
द्वारा: Rohanai, Reyanhealme
प्रकाशित: (2016)
Establishing the prevalence and incidence of musculoskeletal disorders among welders in fabrication yard
द्वारा: Ab. Halim, Farah Salwani
प्रकाशित: (2014)
द्वारा: Ab. Halim, Farah Salwani
प्रकाशित: (2014)
Scheduling Large Project Into Work Packages
द्वारा: Mohamad Nor, Norazman
प्रकाशित: (1994)
द्वारा: Mohamad Nor, Norazman
प्रकाशित: (1994)
Facilities management criteria that influence facilities development during construction projects
द्वारा: Chai, Wai Chun
प्रकाशित: (2012)
द्वारा: Chai, Wai Chun
प्रकाशित: (2012)
Productivity of rendering and tiling works for building projects scheduling
द्वारा: Mohd. Zain, Resli Azha
प्रकाशित: (2011)
द्वारा: Mohd. Zain, Resli Azha
प्रकाशित: (2011)
Factors affecting in the preparation of construction work schedule
द्वारा: Bong, Justin Chunn Tat
प्रकाशित: (2009)
द्वारा: Bong, Justin Chunn Tat
प्रकाशित: (2009)
Implikasi pembangunan kompleks petroleum bersepadu pengerang terhadap trend pembangunan kediaman
द्वारा: S. Ali, Abidullah
प्रकाशित: (2022)
द्वारा: S. Ali, Abidullah
प्रकाशित: (2022)
Productivity rate of roof works for JKR school project scheduling
द्वारा: Rijal , Zuraida Zaini
प्रकाशित: (2010)
द्वारा: Rijal , Zuraida Zaini
प्रकाशित: (2010)
Productivity assessment and schedule compression index for construction project planning
द्वारा: Mansur, Shaiful Amri
प्रकाशित: (2004)
द्वारा: Mansur, Shaiful Amri
प्रकाशित: (2004)
Project delays recovery on construction work
द्वारा: Adiwati, Shinta
प्रकाशित: (1999)
द्वारा: Adiwati, Shinta
प्रकाशित: (1999)
Project delays recovery on construction work
द्वारा: Adiwati, Shinta
प्रकाशित: (1999)
द्वारा: Adiwati, Shinta
प्रकाशित: (1999)
Penyeliaan pengajaran dalam kalangan guru di sekolah rendah zon Pengerang, Kota Tinggi Johor
द्वारा: Ab. Manaf, Lazawardi
प्रकाशित: (2013)
द्वारा: Ab. Manaf, Lazawardi
प्रकाशित: (2013)
Evaluation on current practice in work breakdown structure approach for construction schedules
द्वारा: Md. Isha, Mohd. Nasir
प्रकाशित: (2004)
द्वारा: Md. Isha, Mohd. Nasir
प्रकाशित: (2004)
Work fatigue and physiological symptoms in different occupations of high-elevation construction workers / Mohamad Arif Muahzim
द्वारा: Mohamad Arif, Muahzim
प्रकाशित: (2018)
द्वारा: Mohamad Arif, Muahzim
प्रकाशित: (2018)
Vibration induced fatigue failure piping system
द्वारा: Yap, Weng Suon
प्रकाशित: (2013)
द्वारा: Yap, Weng Suon
प्रकाशित: (2013)
Vibration induced fatigue failure in piping system
द्वारा: Yap, Weng Suon
प्रकाशित: (2013)
द्वारा: Yap, Weng Suon
प्रकाशित: (2013)
Assessment of the licensing and inspection of scheduled wastes management facilities : case study : off-site recovery facilities in Johor
द्वारा: Mat Sari, Norhazni
प्रकाशित: (2004)
द्वारा: Mat Sari, Norhazni
प्रकाशित: (2004)
Pelaksanaan Kem Bestari Solat (KBS) program j-QAF di sekolah-sekolah rendah zon Pengerang, Johor
द्वारा: Salai, Nor Azlan
प्रकाशित: (2013)
द्वारा: Salai, Nor Azlan
प्रकाशित: (2013)
Tahap prasarana pendidikan dan persekitaran pembelajaran di sekolah rendah zon Pengerang daerah Kota Tinggi, Johor
द्वारा: Anuar Hadison, Shahrul
प्रकाशित: (2013)
द्वारा: Anuar Hadison, Shahrul
प्रकाशित: (2013)
Workforce fatigue model and its relationship with workforce productivity
द्वारा: Shahraki, Shahrokh
प्रकाशित: (2015)
द्वारा: Shahraki, Shahrokh
प्रकाशित: (2015)
Improving construction project scheduling performance amid COVID-19 pandemic / Lu Haw Zheng
द्वारा: Lu , Haw Zheng
प्रकाशित: (2022)
द्वारा: Lu , Haw Zheng
प्रकाशित: (2022)
Trend of parking demand at Machap Northbound Rest Area
द्वारा: Abd. Wahab, Muhammad Syimir
प्रकाशित: (2015)
द्वारा: Abd. Wahab, Muhammad Syimir
प्रकाशित: (2015)
Stress analysis and fatigue life prediction of a wobble-plate
द्वारा: Osman Ali, Hassan
प्रकाशित: (2006)
द्वारा: Osman Ali, Hassan
प्रकाशित: (2006)
Damage evolution of ball bearings under fatigue loading conditions
द्वारा: Md. Yasin, Anuar Syamsi
प्रकाशित: (2001)
द्वारा: Md. Yasin, Anuar Syamsi
प्रकाशित: (2001)
Lighting simulation of energy saving for rest and service area in Malaysia
द्वारा: Neardey, Monh
प्रकाशित: (2021)
द्वारा: Neardey, Monh
प्रकाशित: (2021)
The effect of inter-repetition rest duration on kinematic and kinetic of snatch
द्वारा: Kevin Tan
प्रकाशित: (2021)
द्वारा: Kevin Tan
प्रकाशित: (2021)
Effects of chromium addition on fatigue crack growth behavior of titanium aluminides
द्वारा: Ong, Wei Rex
प्रकाशित: (2008)
द्वारा: Ong, Wei Rex
प्रकाशित: (2008)
Modeling and experimental verification of multiphase steel for components subjected to fatigue loading
द्वारा: Idris, Roslinda
प्रकाशित: (2012)
द्वारा: Idris, Roslinda
प्रकाशित: (2012)
Fatigue analysis of catenary offset buoyant riser assembly(COBRA) concept
द्वारा: Jamaludin, Fahd Ezadee
प्रकाशित: (2017)
द्वारा: Jamaludin, Fahd Ezadee
प्रकाशित: (2017)
Fractal and probabilistic analysis on fatigue crack growth rate of metallic materials
द्वारा: Hashmi, Mudassar Hussain
प्रकाशित: (2023)
द्वारा: Hashmi, Mudassar Hussain
प्रकाशित: (2023)
Schedule risk analysis in offshore development project
द्वारा: Hermanto, Budi
प्रकाशित: (2010)
द्वारा: Hermanto, Budi
प्रकाशित: (2010)
Integrated regression and fuzzy model to determine remaining project duration
द्वारा: Scully, Clement Cornelius
प्रकाशित: (2022)
द्वारा: Scully, Clement Cornelius
प्रकाशित: (2022)
Analysis of fatigue surface crack using the probabilistic s-version finite element model
द्वारा: Mohd Akramin, Mohd Romlay
प्रकाशित: (2016)
द्वारा: Mohd Akramin, Mohd Romlay
प्रकाशित: (2016)
Influence of autofrettage on pressure limits and fatigue life of pressurized thick - walled cylinders
द्वारा: Elbasheer, Mohammed Kabashi
प्रकाशित: (2009)
द्वारा: Elbasheer, Mohammed Kabashi
प्रकाशित: (2009)
Mesoscale lamina fatigue damage model for fiber-reinforced polymer composite laminates
द्वारा: Azizan, Azisyahirah
प्रकाशित: (2020)
द्वारा: Azizan, Azisyahirah
प्रकाशित: (2020)
Interlaminar fatigue damage model of carbon fiber-reinforced polymer composite laminates
द्वारा: Khan, Safdar Ali
प्रकाशित: (2023)
द्वारा: Khan, Safdar Ali
प्रकाशित: (2023)
Energy consumption and potential retrofitting of highway rest and service areas (RSAs)
द्वारा: Ainee, Farinee
प्रकाशित: (2012)
द्वारा: Ainee, Farinee
प्रकाशित: (2012)
External shading devices as passive daylighting strategy for resting corridor in tropics
द्वारा: Zakaria, Muhamad Faiz
प्रकाशित: (2022)
द्वारा: Zakaria, Muhamad Faiz
प्रकाशित: (2022)
समान संसाधन
-
The effect of work rest schedules and type of cognitive workload on mental fatigue
द्वारा: Muhamad, Ahmad Badrul Hakim
प्रकाशित: (2016) -
The impact of work-rest scheduling on prolonged standing activity
द्वारा: Mohamad, Norlizaa
प्रकाशित: (2017) -
The impact of work rest scheduling on prolonged standing activity in a Malaysian electronic company
द्वारा: Rohanai, Reyanhealme
प्रकाशित: (2016) -
Establishing the prevalence and incidence of musculoskeletal disorders among welders in fabrication yard
द्वारा: Ab. Halim, Farah Salwani
प्रकाशित: (2014) -
Scheduling Large Project Into Work Packages
द्वारा: Mohamad Nor, Norazman
प्रकाशित: (1994)