Determination of work-rest schedule based on fatigue among welders at construction of marine facility Pengerang project
This study is keen on Determination of Work-Rest Schedule Based on Fatigue Among Welders at Construction of Marine Facility Pengerang Project that could help construction company in Malaysia to gain information and knowledge about fatigue during welding work. A welding work as common practicing meth...
| Main Author: | Jumari, Rozazila |
|---|---|
| Format: | Thesis |
| Language: | English |
| Published: |
2017
|
| Subjects: | |
| Online Access: | http://eprints.utm.my/79024/1/RozazilaJumariMFKM2017.pdf |
Similar Items
The effect of work rest schedules and type of cognitive workload on mental fatigue
by: Muhamad, Ahmad Badrul Hakim
Published: (2016)
by: Muhamad, Ahmad Badrul Hakim
Published: (2016)
The impact of work-rest scheduling on prolonged standing activity
by: Mohamad, Norlizaa
Published: (2017)
by: Mohamad, Norlizaa
Published: (2017)
The impact of work rest scheduling on prolonged standing activity in a Malaysian electronic company
by: Rohanai, Reyanhealme
Published: (2016)
by: Rohanai, Reyanhealme
Published: (2016)
Establishing the prevalence and incidence of musculoskeletal disorders among welders in fabrication yard
by: Ab. Halim, Farah Salwani
Published: (2014)
by: Ab. Halim, Farah Salwani
Published: (2014)
Scheduling Large Project Into Work Packages
by: Mohamad Nor, Norazman
Published: (1994)
by: Mohamad Nor, Norazman
Published: (1994)
Facilities management criteria that influence facilities development during construction projects
by: Chai, Wai Chun
Published: (2012)
by: Chai, Wai Chun
Published: (2012)
Productivity of rendering and tiling works for building projects scheduling
by: Mohd. Zain, Resli Azha
Published: (2011)
by: Mohd. Zain, Resli Azha
Published: (2011)
Factors affecting in the preparation of construction work schedule
by: Bong, Justin Chunn Tat
Published: (2009)
by: Bong, Justin Chunn Tat
Published: (2009)
Implikasi pembangunan kompleks petroleum bersepadu pengerang terhadap trend pembangunan kediaman
by: S. Ali, Abidullah
Published: (2022)
by: S. Ali, Abidullah
Published: (2022)
Productivity rate of roof works for JKR school project scheduling
by: Rijal , Zuraida Zaini
Published: (2010)
by: Rijal , Zuraida Zaini
Published: (2010)
Productivity assessment and schedule compression index for construction project planning
by: Mansur, Shaiful Amri
Published: (2004)
by: Mansur, Shaiful Amri
Published: (2004)
Project delays recovery on construction work
by: Adiwati, Shinta
Published: (1999)
by: Adiwati, Shinta
Published: (1999)
Project delays recovery on construction work
by: Adiwati, Shinta
Published: (1999)
by: Adiwati, Shinta
Published: (1999)
Penyeliaan pengajaran dalam kalangan guru di sekolah rendah zon Pengerang, Kota Tinggi Johor
by: Ab. Manaf, Lazawardi
Published: (2013)
by: Ab. Manaf, Lazawardi
Published: (2013)
Evaluation on current practice in work breakdown structure approach for construction schedules
by: Md. Isha, Mohd. Nasir
Published: (2004)
by: Md. Isha, Mohd. Nasir
Published: (2004)
Work fatigue and physiological symptoms in different occupations of high-elevation construction workers / Mohamad Arif Muahzim
by: Mohamad Arif, Muahzim
Published: (2018)
by: Mohamad Arif, Muahzim
Published: (2018)
Vibration induced fatigue failure piping system
by: Yap, Weng Suon
Published: (2013)
by: Yap, Weng Suon
Published: (2013)
Vibration induced fatigue failure in piping system
by: Yap, Weng Suon
Published: (2013)
by: Yap, Weng Suon
Published: (2013)
Assessment of the licensing and inspection of scheduled wastes management facilities : case study : off-site recovery facilities in Johor
by: Mat Sari, Norhazni
Published: (2004)
by: Mat Sari, Norhazni
Published: (2004)
Pelaksanaan Kem Bestari Solat (KBS) program j-QAF di sekolah-sekolah rendah zon Pengerang, Johor
by: Salai, Nor Azlan
Published: (2013)
by: Salai, Nor Azlan
Published: (2013)
Tahap prasarana pendidikan dan persekitaran pembelajaran di sekolah rendah zon Pengerang daerah Kota Tinggi, Johor
by: Anuar Hadison, Shahrul
Published: (2013)
by: Anuar Hadison, Shahrul
Published: (2013)
Workforce fatigue model and its relationship with workforce productivity
by: Shahraki, Shahrokh
Published: (2015)
by: Shahraki, Shahrokh
Published: (2015)
Improving construction project scheduling performance amid COVID-19 pandemic / Lu Haw Zheng
by: Lu , Haw Zheng
Published: (2022)
by: Lu , Haw Zheng
Published: (2022)
Trend of parking demand at Machap Northbound Rest Area
by: Abd. Wahab, Muhammad Syimir
Published: (2015)
by: Abd. Wahab, Muhammad Syimir
Published: (2015)
Stress analysis and fatigue life prediction of a wobble-plate
by: Osman Ali, Hassan
Published: (2006)
by: Osman Ali, Hassan
Published: (2006)
Damage evolution of ball bearings under fatigue loading conditions
by: Md. Yasin, Anuar Syamsi
Published: (2001)
by: Md. Yasin, Anuar Syamsi
Published: (2001)
Lighting simulation of energy saving for rest and service area in Malaysia
by: Neardey, Monh
Published: (2021)
by: Neardey, Monh
Published: (2021)
The effect of inter-repetition rest duration on kinematic and kinetic of snatch
by: Kevin Tan
Published: (2021)
by: Kevin Tan
Published: (2021)
Effects of chromium addition on fatigue crack growth behavior of titanium aluminides
by: Ong, Wei Rex
Published: (2008)
by: Ong, Wei Rex
Published: (2008)
Modeling and experimental verification of multiphase steel for components subjected to fatigue loading
by: Idris, Roslinda
Published: (2012)
by: Idris, Roslinda
Published: (2012)
Fatigue analysis of catenary offset buoyant riser assembly(COBRA) concept
by: Jamaludin, Fahd Ezadee
Published: (2017)
by: Jamaludin, Fahd Ezadee
Published: (2017)
Fractal and probabilistic analysis on fatigue crack growth rate of metallic materials
by: Hashmi, Mudassar Hussain
Published: (2023)
by: Hashmi, Mudassar Hussain
Published: (2023)
Schedule risk analysis in offshore development project
by: Hermanto, Budi
Published: (2010)
by: Hermanto, Budi
Published: (2010)
Integrated regression and fuzzy model to determine remaining project duration
by: Scully, Clement Cornelius
Published: (2022)
by: Scully, Clement Cornelius
Published: (2022)
Analysis of fatigue surface crack using the probabilistic s-version finite element model
by: Mohd Akramin, Mohd Romlay
Published: (2016)
by: Mohd Akramin, Mohd Romlay
Published: (2016)
Influence of autofrettage on pressure limits and fatigue life of pressurized thick - walled cylinders
by: Elbasheer, Mohammed Kabashi
Published: (2009)
by: Elbasheer, Mohammed Kabashi
Published: (2009)
Mesoscale lamina fatigue damage model for fiber-reinforced polymer composite laminates
by: Azizan, Azisyahirah
Published: (2020)
by: Azizan, Azisyahirah
Published: (2020)
Interlaminar fatigue damage model of carbon fiber-reinforced polymer composite laminates
by: Khan, Safdar Ali
Published: (2023)
by: Khan, Safdar Ali
Published: (2023)
Energy consumption and potential retrofitting of highway rest and service areas (RSAs)
by: Ainee, Farinee
Published: (2012)
by: Ainee, Farinee
Published: (2012)
External shading devices as passive daylighting strategy for resting corridor in tropics
by: Zakaria, Muhamad Faiz
Published: (2022)
by: Zakaria, Muhamad Faiz
Published: (2022)
Similar Items
-
The effect of work rest schedules and type of cognitive workload on mental fatigue
by: Muhamad, Ahmad Badrul Hakim
Published: (2016) -
The impact of work-rest scheduling on prolonged standing activity
by: Mohamad, Norlizaa
Published: (2017) -
The impact of work rest scheduling on prolonged standing activity in a Malaysian electronic company
by: Rohanai, Reyanhealme
Published: (2016) -
Establishing the prevalence and incidence of musculoskeletal disorders among welders in fabrication yard
by: Ab. Halim, Farah Salwani
Published: (2014) -
Scheduling Large Project Into Work Packages
by: Mohamad Nor, Norazman
Published: (1994)