Bottleneck-based heuristic for permutation flowshop scheduling

The newly heuristic is developed by introducing the bottleneck-based concept that was applied at the beginning of initial solution determination. The heuristic is known as Bottleneck-Based (BNB) heuristic. The previous study found that the scheduling activity become complex when dealing with large n...

Full description

Bibliographic Details
Main Author: Isa, Noor Amira
Format: Thesis
Language:English
English
English
Published: 2017
Subjects:
Online Access:http://eprints.uthm.edu.my/837/
Abstract Abstract here

Similar Items