Effective facilities management estimation for business continuity
The migration from conventional maintenance to facility management is an on-going process for all high-rise buildings in Malaysia, especially for government-owned buildings. For a government-linked company (GLC), the situation is different as the budget for the maintenance is allocated internally an...
| المؤلف الرئيسي: | Khamar, Farah Diyana Noor |
|---|---|
| التنسيق: | أطروحة |
| اللغة: | الإنجليزية |
| منشور في: |
2017
|
| الموضوعات: | |
| الوصول للمادة أونلاين: | http://eprints.utm.my/85817/1/FarahDiyanaNoorMFKA2017.pdf |
مواد مشابهة
Implementation of internet of things in facilities management
حسب: Ramlan, Roszita Inra
منشور في: (2020)
حسب: Ramlan, Roszita Inra
منشور في: (2020)
Simplified business continuity planning guideline for Universiti Teknologi Malaysia, center for information and communication technology
حسب: Mahamod Sarkoni, Sahidatul Fariza
منشور في: (2011)
حسب: Mahamod Sarkoni, Sahidatul Fariza
منشور في: (2011)
Management and maintenance of the welfare facilities at construction sites in Iraq
حسب: Mohammed Hatem, Zaid
منشور في: (2019)
حسب: Mohammed Hatem, Zaid
منشور في: (2019)
Building information modelling framework in facilities management for building refrubishment
حسب: Alhamza, Yassin Flaih Maeni
منشور في: (2020)
حسب: Alhamza, Yassin Flaih Maeni
منشور في: (2020)
The challenges of facility manager involvement at design stage using building information modeling
حسب: Wong, Lydia Lee
منشور في: (2019)
حسب: Wong, Lydia Lee
منشور في: (2019)
Customer satisfaction towards the facilities management services at the Plaza Merdeka Shopping Mall Kuching
حسب: Awang Yunus, Awang Ihsan
منشور في: (2013)
حسب: Awang Yunus, Awang Ihsan
منشور في: (2013)
The role of standard in controlling and rectifying problems : a study on UTM's stormwater management facilities
حسب: Gan, Seng Kian
منشور في: (2002)
حسب: Gan, Seng Kian
منشور في: (2002)
Pedestrian delay at zebra crossing facility
حسب: Sari , Nadra Mutiara
منشور في: (2010)
حسب: Sari , Nadra Mutiara
منشور في: (2010)
Parasitic moment effect for the three spans continuous prestressed concrete bridge
حسب: Salim, Siti Sarah
منشور في: (2014)
حسب: Salim, Siti Sarah
منشور في: (2014)
Privatized Facilities Management at Government Hospitals in the Northern Region of Malaysia
حسب: Saddum, Muhammad Nizar
منشور في: (2015)
حسب: Saddum, Muhammad Nizar
منشور في: (2015)
Bioethanol production from batch and continuous phytoremediation systems
حسب: Mat Hassan, Mohd. Arif Hakimi
منشور في: (2016)
حسب: Mat Hassan, Mohd. Arif Hakimi
منشور في: (2016)
Influence of midblock U-turn facility on traffic flow reduction and its effect on kinematic wave propagation
حسب: Abd. Rahman, Raha
منشور في: (2014)
حسب: Abd. Rahman, Raha
منشور في: (2014)
The effect of economic situation on construction business in Malaysia
حسب: Shamsuddin, Mohd. Shamsuri
منشور في: (2020)
حسب: Shamsuddin, Mohd. Shamsuri
منشور في: (2020)
Continuous noise mapping predication techniques using the stochastic modelling
حسب: Lim, Ming Han
منشور في: (2017)
حسب: Lim, Ming Han
منشور في: (2017)
Estimation of potential evapotranspiration using multiple linear regression and particle swarm optimization
حسب: Ahmad, Nor Farah Atiqah
منشور في: (2022)
حسب: Ahmad, Nor Farah Atiqah
منشور في: (2022)
Characterization of continuous kenaf-glass fiber hybrid composites for structural application
حسب: Mahjoub, Reza
منشور في: (2013)
حسب: Mahjoub, Reza
منشور في: (2013)
Extent of roadway capacity shif resulting from midblock U-turn facilities
حسب: Misbah, Nurfarahin
منشور في: (2013)
حسب: Misbah, Nurfarahin
منشور في: (2013)
Emergent trend of Malaysian construction industry : the rise of facilities management
حسب: Mohd. Kamin, Norazlina
منشور في: (2007)
حسب: Mohd. Kamin, Norazlina
منشور في: (2007)
Developing a spreadsheet program in analysing continuous prestressed segmental box girders
حسب: Chae, Tyng Feng
منشور في: (2014)
حسب: Chae, Tyng Feng
منشور في: (2014)
Reliability assessment and calibration of ISO-LRFD factors for minimum facility offshore platfrom in Malaysia
حسب: Fakhruddin, Khalid Ahmed
منشور في: (2019)
حسب: Fakhruddin, Khalid Ahmed
منشور في: (2019)
A Preliminary Study To Determine The Essential Facilities Required For Tourists In Langkawi
حسب: Ismail, Sheikh Ahmad Faiz
منشور في: (2019)
حسب: Ismail, Sheikh Ahmad Faiz
منشور في: (2019)
Framework for cost saving estimation of commercial building in energy efficiency
حسب: Abu Bakar, Mohamad Noor Ropiah
منشور في: (2018)
حسب: Abu Bakar, Mohamad Noor Ropiah
منشور في: (2018)
Two-stage continuous assessment decision support model for selection of contractors in Pakistan's public projects
حسب: Raza, Ali
منشور في: (2021)
حسب: Raza, Ali
منشور في: (2021)
Comparison of continuous dynamics probing with the standard penetration test for highly weathered limestone of eastern Sudan
حسب: Mohammed Ahmed, Omar Babiker Elhaj
منشور في: (2010)
حسب: Mohammed Ahmed, Omar Babiker Elhaj
منشور في: (2010)
Improving time estimation in JKR project
حسب: Hasan, Muhamad Khair
منشور في: (2010)
حسب: Hasan, Muhamad Khair
منشور في: (2010)
Estimation of soil compaction parameters based on Atterberg limits
حسب: Kamarudin, Faizah
منشور في: (2005)
حسب: Kamarudin, Faizah
منشور في: (2005)
Symbolic regression model for reliable estimation and projections of evapotranspiration
حسب: Muhammad, Mohd. Khairul Idlan
منشور في: (2022)
حسب: Muhammad, Mohd. Khairul Idlan
منشور في: (2022)
Estimation of debris flow sedimentation volume through numerical modelling
حسب: Jamri, Heirlina Mawarni
منشور في: (2019)
حسب: Jamri, Heirlina Mawarni
منشور في: (2019)
Estimation of base capacity for bored pile embedded in hard stratum
حسب: Ahmad Mazlan, Anum Syahirah
منشور في: (2015)
حسب: Ahmad Mazlan, Anum Syahirah
منشور في: (2015)
Volume Estimation Of Curved Surfaces Using Structured Lighting And Their Similarity Measure
حسب: Elmagid Elnaggar, Ahmed Mohamed Abo
منشور في: (2006)
حسب: Elmagid Elnaggar, Ahmed Mohamed Abo
منشور في: (2006)
On-bank volume estimation using close-range photogrammetry for quarry production
حسب: Tay, Jeffery Guan Kiat
منشور في: (2007)
حسب: Tay, Jeffery Guan Kiat
منشور في: (2007)
Estimating distribution parameters of extreme event using TL-moment method
حسب: Mat Jan, Nur Amalina
منشور في: (2014)
حسب: Mat Jan, Nur Amalina
منشور في: (2014)
Riparian management and its effect on aquatic macroinvertebrate communities at oil palm waterways in Perak
حسب: Noordin, Noor Rashidah
منشور في: (2017)
حسب: Noordin, Noor Rashidah
منشور في: (2017)
The effectiveness of project management by stakeholders in enhancing project and stakeholder management
حسب: Aladpoosh, Hamid
منشور في: (2012)
حسب: Aladpoosh, Hamid
منشور في: (2012)
Automatic markerless pose estimation for human in short sleeve or long sleeve attire
حسب: Lim, Siew Hooi
منشور في: (2008)
حسب: Lim, Siew Hooi
منشور في: (2008)
Estimating the environmental impacts of carbon emissions from fuel consumption during construction activities
حسب: Shahid, Pezhman
منشور في: (2015)
حسب: Shahid, Pezhman
منشور في: (2015)
Estimation and prediction of greenhouse gas emissions from individual septic tank and imhoff tank
حسب: Md. Sairan, Fadzlin
منشور في: (2020)
حسب: Md. Sairan, Fadzlin
منشور في: (2020)
Hydraulic Conductivity Study In Engineered Soil Media For Stormwater Runoff Treatment In Bioretention Facility
حسب: Takaijudin, Husna
منشور في: (2017)
حسب: Takaijudin, Husna
منشور في: (2017)
Effective management of coastal and maritime engineering projects
حسب: Mohd. Aziz, Mohd. Azwan Sayuti
منشور في: (2007)
حسب: Mohd. Aziz, Mohd. Azwan Sayuti
منشور في: (2007)
Influence of staffing practices on effective project management
حسب: Ahmad, Anees
منشور في: (2011)
حسب: Ahmad, Anees
منشور في: (2011)
مواد مشابهة
-
Implementation of internet of things in facilities management
حسب: Ramlan, Roszita Inra
منشور في: (2020) -
Simplified business continuity planning guideline for Universiti Teknologi Malaysia, center for information and communication technology
حسب: Mahamod Sarkoni, Sahidatul Fariza
منشور في: (2011) -
Management and maintenance of the welfare facilities at construction sites in Iraq
حسب: Mohammed Hatem, Zaid
منشور في: (2019) -
Building information modelling framework in facilities management for building refrubishment
حسب: Alhamza, Yassin Flaih Maeni
منشور في: (2020) -
The challenges of facility manager involvement at design stage using building information modeling
حسب: Wong, Lydia Lee
منشور في: (2019)