Determination of K and β during controlled blasting for Karsctic Limestone Rocks at Klang Valley

Ground vibration induced during controlled blasting activity is one of the big concerns especially in highly populated area. Hence, vibration control study plays a vital role in order to reduce the effect to the surrounding. This study involves collection of blasting data from Karstic Limestone form...

詳細記述

書誌詳細
第一著者: Ravichandran, Nalinii
フォーマット: 学位論文
言語:英語
出版事項: 2020
主題:
オンライン・アクセス:http://eprints.utm.my/86075/1/NaliniiRavichandranMSKA2020.pdf
_version_ 1846218390847356928
author Ravichandran, Nalinii
author_facet Ravichandran, Nalinii
author_sort Ravichandran, Nalinii
description Ground vibration induced during controlled blasting activity is one of the big concerns especially in highly populated area. Hence, vibration control study plays a vital role in order to reduce the effect to the surrounding. This study involves collection of blasting data from Karstic Limestone formation at Klang Valley in order to establish the relationship between Peak Particle Velocity (PPV) and scaled distance technique. Besides that, this study is also aim to determine the suitable K and p for Karstic Limestone formation at Klang Valley. A statistical conducted in order to study the importance of blasting controllable variables between maximum charge per delay, number of holes, hole depth, powder factor and PPV in Karstic Limestone Formation at Klang Valley by using the United States Bureau of Mines (USBM) equation as basis. Based on the regression analysis conducted, the site constant for Karstic limestone known to be K as 26.74 whereas the B is -0.801. In overall, all the variables like burden, spacing, hole depth, are showing weak linear relationship with correlation in positive values.
format Thesis
id uthm-86075
institution Universiti Teknologi Malaysia
language English
publishDate 2020
record_format eprints
spelling uthm-860752020-08-30T08:53:23Z http://eprints.utm.my/86075/ Determination of K and β during controlled blasting for Karsctic Limestone Rocks at Klang Valley Ravichandran, Nalinii TA Engineering (General). Civil engineering (General) Ground vibration induced during controlled blasting activity is one of the big concerns especially in highly populated area. Hence, vibration control study plays a vital role in order to reduce the effect to the surrounding. This study involves collection of blasting data from Karstic Limestone formation at Klang Valley in order to establish the relationship between Peak Particle Velocity (PPV) and scaled distance technique. Besides that, this study is also aim to determine the suitable K and p for Karstic Limestone formation at Klang Valley. A statistical conducted in order to study the importance of blasting controllable variables between maximum charge per delay, number of holes, hole depth, powder factor and PPV in Karstic Limestone Formation at Klang Valley by using the United States Bureau of Mines (USBM) equation as basis. Based on the regression analysis conducted, the site constant for Karstic limestone known to be K as 26.74 whereas the B is -0.801. In overall, all the variables like burden, spacing, hole depth, are showing weak linear relationship with correlation in positive values. 2020 Thesis NonPeerReviewed application/pdf en http://eprints.utm.my/86075/1/NaliniiRavichandranMSKA2020.pdf Ravichandran, Nalinii (2020) Determination of K and β during controlled blasting for Karsctic Limestone Rocks at Klang Valley. Masters thesis, Universiti Teknologi Malaysia, Faculty of Engineering - School of Civil Engineering. http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:134202
spellingShingle TA Engineering (General). Civil engineering (General)
Ravichandran, Nalinii
Determination of K and β during controlled blasting for Karsctic Limestone Rocks at Klang Valley
title Determination of K and β during controlled blasting for Karsctic Limestone Rocks at Klang Valley
title_full Determination of K and β during controlled blasting for Karsctic Limestone Rocks at Klang Valley
title_fullStr Determination of K and β during controlled blasting for Karsctic Limestone Rocks at Klang Valley
title_full_unstemmed Determination of K and β during controlled blasting for Karsctic Limestone Rocks at Klang Valley
title_short Determination of K and β during controlled blasting for Karsctic Limestone Rocks at Klang Valley
title_sort determination of k and β during controlled blasting for karsctic limestone rocks at klang valley
topic TA Engineering (General). Civil engineering (General)
url http://eprints.utm.my/86075/1/NaliniiRavichandranMSKA2020.pdf
url-record http://eprints.utm.my/86075/
http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:134202
work_keys_str_mv AT ravichandrannalinii determinationofkandbduringcontrolledblastingforkarscticlimestonerocksatklangvalley