Analysis of various rapid prototyping techniques for investment casting
Rapid prototyping (RP) technology is currently receiving huge attention as a prospective alternative to replace the conventional wax material as a master pattern in the investment casting (IC) process. This is because the RP technology allows simple to complex patterns to be fabricated directly from...
| Main Author: | Marwah, Omar Mohd Faizan |
|---|---|
| Format: | Thesis |
| Language: | English English |
| Published: |
2016
|
| Subjects: | |
| Online Access: | http://eprints.uthm.edu.my/889/ |
| Abstract | Abstract here |
Similar Items
Performance evaluation of FDM water works system for ABS part
by: Marwah, Omar Mohd Faizan
Published: (2006)
by: Marwah, Omar Mohd Faizan
Published: (2006)
Analysis of various rapid prototyping techniques for investment casting
by: Omar Mohd. Faizan Marwah
Published: (2025)
by: Omar Mohd. Faizan Marwah
Published: (2025)
Identification of shift variation in bivariate process using pattern recognition technique
by: Mohd Haizan, Mohamad Azrul Azhad
Published: (2019)
by: Mohd Haizan, Mohamad Azrul Azhad
Published: (2019)
A contingency-based decision support instrument for selecting lean production tools and techniques
by: Yahya, Mohd Shahir
Published: (2021)
by: Yahya, Mohd Shahir
Published: (2021)
Improved classifier chain methods based on heuristic optimization techniques for multi-label classification problem
by: Oyekunle, Adeleke Abdullahi
Published: (2022)
by: Oyekunle, Adeleke Abdullahi
Published: (2022)
A Modified Multi-Step Crossover Fusion (MSXF) In Solving Some Deterministic Job Shop Scheduling Problem (JSSP) [TS157.5. M214 2008 f rb].
by: Omar, Mahanim
Published: (2008)
by: Omar, Mahanim
Published: (2008)
Tinjauan Persepsi Staf Dan Pelajar Terhadap Amalan Pelaksanaan Sistem ISO 9002 Di POLIMAS
by: Omar, Ali
Published: (2002)
by: Omar, Ali
Published: (2002)
Development Of Decision Model For Maintenance Analysis Of Non-Repairable Component By Considering The External Factor [TS192. R821 2007 f rb].
by: Rosmaini, Ahmad
Published: (2007)
by: Rosmaini, Ahmad
Published: (2007)
Design optimization for the two-stage bivariate pattern recognition scheme
by: Mokhtar, Mohd Shukri
Published: (2015)
by: Mokhtar, Mohd Shukri
Published: (2015)
Relationship between lean manufacturing practices and sustainability in manufacturing organisations: Mediating effect of manufacturing performance and moderating effect of ethical climates
by: Mohd Zulfabli, Hasan
Published: (2021)
by: Mohd Zulfabli, Hasan
Published: (2021)
Mechanical performances of eco- board from oil palm empty fruit bunch (OPEFB) and mahang (artocarpus oddorattisimus)
by: Mohd Fazil bin Jundam
Published: (2021)
by: Mohd Fazil bin Jundam
Published: (2021)
Flowshop scheduling using artificial bee colony (ABC) algorithm with varying onlooker bees approaches
by: Mohd Pauzi, Nur Fazlinda
Published: (2015)
by: Mohd Pauzi, Nur Fazlinda
Published: (2015)
Pattern recognition for manufacturing process variation using integrated statistical process control – artificial neural network
by: Mohd Ariffin, Ahmad Azrizal
Published: (2015)
by: Mohd Ariffin, Ahmad Azrizal
Published: (2015)
Intergration of control chart and pattern recognizer for bivariate quality control
by: Mohd Sohaimi, Nurul Adlihisam
Published: (2015)
by: Mohd Sohaimi, Nurul Adlihisam
Published: (2015)
Evaluate the Elements That Contribute to the Success of Kaizen Implementation in Manufacturing Sector
by: Mohamad Ishak, Mohd Mokti
Published: (2012)
by: Mohamad Ishak, Mohd Mokti
Published: (2012)
Critical Success Factors in New Product Development: A Survey in Malaysian Manufacturing Industry
by: Mohd Rohaizad, Abdul Latib
Published: (2011)
by: Mohd Rohaizad, Abdul Latib
Published: (2011)
Factors affecting new product development success: A study on manufacturing sector in Malaysia
by: Mohd Azrul, Abdul Aziz
Published: (2015)
by: Mohd Azrul, Abdul Aziz
Published: (2015)
Contributing factors towards workplace accidents among SMEs in Malaysia
by: Nadia, Mohd Azam Na'ir
Published: (2014)
by: Nadia, Mohd Azam Na'ir
Published: (2014)
Mechanical design of an automated vehicle driving system for drive cycle testing
by: Saini, Adam
Published: (2016)
by: Saini, Adam
Published: (2016)
Dynamic supply chain capabilities : a case of oil and gas industry in Malaysia
by: Shatina, Saad
Published: (2016)
by: Shatina, Saad
Published: (2016)
The degree of JIT in mineral oil and asphalt industries in Libya
by: Mohamed Elbishti, Entsar Kouni Alhaj
Published: (2015)
by: Mohamed Elbishti, Entsar Kouni Alhaj
Published: (2015)
Characterization and development of polycaprolactone (PCL)/montmorillonite (MMT)/hydroxapaptite (HA) nano-composites for fused deposition modelling (FDM) process
by: Abdul Haq, Raezul Haq
Published: (2015)
by: Abdul Haq, Raezul Haq
Published: (2015)
The role of risks, collaboration and performance in the supply chain of manufacturing firms of Malaysia
by: Shahbaz, Muhammad Saeed
Published: (2019)
by: Shahbaz, Muhammad Saeed
Published: (2019)
Influence of organizational culture in the relationship between information system and operational performance on manufacturing sector in UAE
by: Abdulla Lari, Darwish Ahmed Darwish
Published: (2021)
by: Abdulla Lari, Darwish Ahmed Darwish
Published: (2021)
A guided artificial bee colony (GABC) heuristic for permutation flowshop scheduling problem (PFSP)
by: Sidek, Noor Azizah
Published: (2021)
by: Sidek, Noor Azizah
Published: (2021)
Development of new lean manufacturing approach through people development and process improvement as a mediator in the libyan companies
by: M. A. Ataalah, Abdurezzag
Published: (2019)
by: M. A. Ataalah, Abdurezzag
Published: (2019)
Heuristics method for truck disassembly process
by: Yeoh, Kim Hao
Published: (2020)
by: Yeoh, Kim Hao
Published: (2020)
Perception of success on implementation of ISO 9001 : 2008 and its influence to organizational commitment in Sabah Electricity Sdn. Bhd. (SESB)
by: Esther Masulah
Published: (2010)
by: Esther Masulah
Published: (2010)
The impact of ISO 9000 registration on Total Quality Management (TQM) practices in the public sector: A comparative study
by: Nor Fuad Abdul Hamid
Published: (2004)
by: Nor Fuad Abdul Hamid
Published: (2004)
Relationship of economies of scale (EOS) factors for Malaysian Industrialised building system (IBS) precast manufacturer
by: Tajul Ariffin, Syazwana
Published: (2019)
by: Tajul Ariffin, Syazwana
Published: (2019)
Dynamic weighted idle time heuristic for flowshop scheduling
by: Zainudin, Amira Syuhada
Published: (2017)
by: Zainudin, Amira Syuhada
Published: (2017)
A framework for green manufacturing practicies in small and medium enterprises in Malaysia
by: Zakaria, Nur Syuhada
Published: (2018)
by: Zakaria, Nur Syuhada
Published: (2018)
SPC charting procedure for monitoring of small and large shifts in process mean
by: Masood, Ibrahim
Published: (2004)
by: Masood, Ibrahim
Published: (2004)
The framework of improving on-site materials tracking for inventory management process in construction projects
by: Liwan, Siti Radziah
Published: (2015)
by: Liwan, Siti Radziah
Published: (2015)
Design optimization of ANN-based pattern recognizer for multivariate quality control
by: Abdul Jamil, Muhamad Faizal
Published: (2013)
by: Abdul Jamil, Muhamad Faizal
Published: (2013)
A study on extrusion of multiple material bonding for fused depostion modeling
by: Azahari, Mohamad Azhar
Published: (2014)
by: Azahari, Mohamad Azhar
Published: (2014)
The impact of lean six sigma practices based on industrial revolution 4.0 towards balanced scorecard indicators in Malaysia manufacturing sector
by: Zamri, Shafeeka Fadlikh
Published: (2021)
by: Zamri, Shafeeka Fadlikh
Published: (2021)
Industrial revolution 4.0 implementation: current practice and barriers in manufacturing firms of Malaysia
by: Tay, Shu Ing
Published: (2020)
by: Tay, Shu Ing
Published: (2020)
Enhancement of Kansei engineering methodology for sound design
by: Yiap, Shin Yi
Published: (2017)
by: Yiap, Shin Yi
Published: (2017)
Kesan Perkhidmatan Pengurusan Fasiliti Ke Atas Kepuasan Penyelia Kilang Elektrik Dan Elektronik (E&E) Di Malaysia [TS155. A827 2005 f rb].
by: Zainuddin, Ashrof
Published: (2005)
by: Zainuddin, Ashrof
Published: (2005)
Similar Items
-
Performance evaluation of FDM water works system for ABS part
by: Marwah, Omar Mohd Faizan
Published: (2006) -
Analysis of various rapid prototyping techniques for investment casting
by: Omar Mohd. Faizan Marwah
Published: (2025) -
Identification of shift variation in bivariate process using pattern recognition technique
by: Mohd Haizan, Mohamad Azrul Azhad
Published: (2019) -
A contingency-based decision support instrument for selecting lean production tools and techniques
by: Yahya, Mohd Shahir
Published: (2021) -
Improved classifier chain methods based on heuristic optimization techniques for multi-label classification problem
by: Oyekunle, Adeleke Abdullahi
Published: (2022)
