Road damage and maintenance along federal road in Kuala Krai, Kelantan

The study focused on the evaluation and inspection of existing flexible pavement conditions with various type of pavement distress and the implications of the road rehabilitation cost along federal road in Kuala Krai, Kelantan. The Ministry of Works Malaysia (MWM) was dealing with backlog in maintai...

詳細記述

書誌詳細
第一著者: Mokhtar, Mohd. Arizan
フォーマット: 学位論文
言語:英語
出版事項: 2020
主題:
オンライン・アクセス:http://eprints.utm.my/92200/1/MohdArizanMokhtarMSKA2020.pdf
_version_ 1846218473726803968
author Mokhtar, Mohd. Arizan
author_facet Mokhtar, Mohd. Arizan
author_sort Mokhtar, Mohd. Arizan
description The study focused on the evaluation and inspection of existing flexible pavement conditions with various type of pavement distress and the implications of the road rehabilitation cost along federal road in Kuala Krai, Kelantan. The Ministry of Works Malaysia (MWM) was dealing with backlog in maintaining federal roads due to insufficient allocation and increasing traffic volume. This research is significant to assist the government draw up the cost allocation for rehabilitation plan in the state of Kelantan especially along federal road in Kuala Krai district. A case study was carried out on the federal roads under Public Works Department (PWD) management in Kuala Krai district which is the concession contract that awarded to Roadcare Sdn. Bhd. The distress of flexible pavement were divided into four main categories which were potholes, pavement cracks, surface deformation and surface defects. This 54km road has been divided into five segments of road section. The data analysis was conducted based on routine inspection records, notification of defects and Road Traffic Volume Malaysia produced by Roadcare Sdn. Bhd and Ministry of Works Malaysia. From the study, pavement cracks is the dominant defect mechanism from 2016 to 2018. Potholes and surface defects indicates the upward trend from 2016 to 2019 along Jalan Kuala Krai-Gua Musang. Meanwhile, the highest estimated cost for road rehabilitation for 4 years contributed by segment 5 due to the highest area of pavement distress that occurs along this. Because of the location of segment 5 which is near to the city center with lots of industrial and business activities, therefore, the most of the budget in maintenance has been spent along segment 5.
format Thesis
id uthm-92200
institution Universiti Teknologi Malaysia
language English
publishDate 2020
record_format eprints
spelling uthm-922002021-08-30T05:10:08Z http://eprints.utm.my/92200/ Road damage and maintenance along federal road in Kuala Krai, Kelantan Mokhtar, Mohd. Arizan TA Engineering (General). Civil engineering (General) The study focused on the evaluation and inspection of existing flexible pavement conditions with various type of pavement distress and the implications of the road rehabilitation cost along federal road in Kuala Krai, Kelantan. The Ministry of Works Malaysia (MWM) was dealing with backlog in maintaining federal roads due to insufficient allocation and increasing traffic volume. This research is significant to assist the government draw up the cost allocation for rehabilitation plan in the state of Kelantan especially along federal road in Kuala Krai district. A case study was carried out on the federal roads under Public Works Department (PWD) management in Kuala Krai district which is the concession contract that awarded to Roadcare Sdn. Bhd. The distress of flexible pavement were divided into four main categories which were potholes, pavement cracks, surface deformation and surface defects. This 54km road has been divided into five segments of road section. The data analysis was conducted based on routine inspection records, notification of defects and Road Traffic Volume Malaysia produced by Roadcare Sdn. Bhd and Ministry of Works Malaysia. From the study, pavement cracks is the dominant defect mechanism from 2016 to 2018. Potholes and surface defects indicates the upward trend from 2016 to 2019 along Jalan Kuala Krai-Gua Musang. Meanwhile, the highest estimated cost for road rehabilitation for 4 years contributed by segment 5 due to the highest area of pavement distress that occurs along this. Because of the location of segment 5 which is near to the city center with lots of industrial and business activities, therefore, the most of the budget in maintenance has been spent along segment 5. 2020 Thesis NonPeerReviewed application/pdf en http://eprints.utm.my/92200/1/MohdArizanMokhtarMSKA2020.pdf Mokhtar, Mohd. Arizan (2020) Road damage and maintenance along federal road in Kuala Krai, Kelantan. Masters thesis, Universiti Teknologi Malaysia, Faculty of Engineering - School of Civil Engineering. http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:138202
spellingShingle TA Engineering (General). Civil engineering (General)
Mokhtar, Mohd. Arizan
Road damage and maintenance along federal road in Kuala Krai, Kelantan
title Road damage and maintenance along federal road in Kuala Krai, Kelantan
title_full Road damage and maintenance along federal road in Kuala Krai, Kelantan
title_fullStr Road damage and maintenance along federal road in Kuala Krai, Kelantan
title_full_unstemmed Road damage and maintenance along federal road in Kuala Krai, Kelantan
title_short Road damage and maintenance along federal road in Kuala Krai, Kelantan
title_sort road damage and maintenance along federal road in kuala krai kelantan
topic TA Engineering (General). Civil engineering (General)
url http://eprints.utm.my/92200/1/MohdArizanMokhtarMSKA2020.pdf
url-record http://eprints.utm.my/92200/
http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:138202
work_keys_str_mv AT mokhtarmohdarizan roaddamageandmaintenancealongfederalroadinkualakraikelantan