Kelewatan projek pembinaan IBS di negeri Kedah

Also available in printed version

Bibliographic Details
Main Author: Mohd. Fauzi Che Mat @ Che Ani
Published: Universiti Teknologi Malaysia 2025
Subjects:
Online Access:https://utmik.utm.my/handle/123456789/100721
Abstract Abstract here
_version_ 1862970647475388416
author Mohd. Fauzi Che Mat @ Che Ani
author_facet Mohd. Fauzi Che Mat @ Che Ani
author_sort Mohd. Fauzi Che Mat @ Che Ani
description Also available in printed version
id utm-123456789-100721
institution Universiti Teknologi Malaysia
publishDate 2025
publisher Universiti Teknologi Malaysia
record_format DSpace
record_pdf Restricted
spelling utm-123456789-1007212025-08-21T12:01:52Z Kelewatan projek pembinaan IBS di negeri Kedah Mohd. Fauzi Che Mat @ Che Ani Bachan Singh Besawa Jagar Singh, supervisor Civil engineering Also available in printed version Malaysia is developing fast with many projects being implemented. However, some of the projects suffer from either cost overrun, delay or do not meet the required quality. Even though delay in the construction project cannot be avoided, it can be reduced. One of the main factors the government launched the IBS projects is to accelerate the implementation of construction works that can be completed within the stipulated time.Nevertheless, from five IBS project supervised by JKR Kedah from 2008 to 2013 almost 100% had experienced delays.Therefore, the aim of this study is to analyze the causes of delay in the IBS projects and to suggest methods to overcome the delays. The objectives of this study are to identify the types of delays in the IBS projects, to review the factors that cause delays in the construction of IBS projects, to identify the impact of delay on IBS projects and to suggest methods to overcome delays in the construction of IBS projects.The study is conducted through questionnaires and interviews. A total of 50 questionnaires is distributed to the respondents comprising of contractors, consultants and engineers. The number of questionnaires returned and filled are 30 numbers. The data is analyzed using Average Index. From the study there are three types of delays in the IBS construction projects. This problem is clearly stated in the Contract Documents in Clause 43.1(a-j). First is the delay that can be claimed compensation(compensable delays), Delay allowed without compensation(Excusable Delays) and delay are not allowed and will be subject to fines and Ascertained Damages (Liquidated and Ascertained Damages, LAD) (Non Excusable Delays). The factors that cause delays in the construction of IBS projects are financial problems, contractors? lack of knowledge of IBS projects and poor site management. The impact of delay on IBS projectare cost overrun, loss to client in terms of income and storage of equipment supplied by the supplier for the IBS projects. The methods to overcome delaysin the construction of IBS projects are to reduce costs, develop a "one stop center" for IBS, skills training to carry out the project IBS, installation and logistical, planning and scheduling, payments to contractors must be timely fahmimoksen UTM 97 p. Project Paper (Sarjana Muda Kejuruteraan (Mekanikal - Bahan)) - Universiti Teknologi Malaysia, 2014 2025-04-10T04:11:57Z 2025-04-10T04:11:57Z 2014 Bachelor thesis https://utmik.utm.my/handle/123456789/100721 valet-20161120-100959 vital:92788 Closed Access UTM Complete Unpublished application/pdf Universiti Teknologi Malaysia
spellingShingle Civil engineering
Mohd. Fauzi Che Mat @ Che Ani
Kelewatan projek pembinaan IBS di negeri Kedah
thesis_level Other
title Kelewatan projek pembinaan IBS di negeri Kedah
title_full Kelewatan projek pembinaan IBS di negeri Kedah
title_fullStr Kelewatan projek pembinaan IBS di negeri Kedah
title_full_unstemmed Kelewatan projek pembinaan IBS di negeri Kedah
title_short Kelewatan projek pembinaan IBS di negeri Kedah
title_sort kelewatan projek pembinaan ibs di negeri kedah
topic Civil engineering
url https://utmik.utm.my/handle/123456789/100721
work_keys_str_mv AT mohdfauzichematcheani kelewatanprojekpembinaanibsdinegerikedah