Variation order in lump sum contract
Also available in printed version : TH425 N668 2014 raf
| Auteur principal: | Noor Amalina Mohayidin |
|---|---|
| Autres auteurs: | Maizon Hashim, supervisor |
| Format: | Master's thesis |
| Publié: |
Universiti Teknologi Malaysia
2025
|
| Sujets: | |
| Accès en ligne: | https://utmik.utm.my/handle/123456789/101593 |
| Abstract | Abstract here |
Documents similaires
Variation in the standard form of contract in Malaysia and Indonesia
par: Bayu Dwi Rahmatyo
Publié: (2025)
par: Bayu Dwi Rahmatyo
Publié: (2025)
Employer's implied obligation in construction contract
par: Nurulain Tazol Arrief
Publié: (2025)
par: Nurulain Tazol Arrief
Publié: (2025)
Recovery of interest / financing charges due to prolongation in construction contract
par: Ng, Chee Kuang
Publié: (2025)
par: Ng, Chee Kuang
Publié: (2025)
Comparison between construction contract used for governmnet projects in Indonesia and Malaysia
par: Adi Argo Soewendo
Publié: (2025)
par: Adi Argo Soewendo
Publié: (2025)
Level of understanding the contract requirements of PWD 203A (Rev.2007) standard form of contract among the construction professional
par: Norazreen Abu Bakar
Publié: (2025)
par: Norazreen Abu Bakar
Publié: (2025)
Termination of construction contracts by employer
par: Mohammad Mahdi Hosseini
Publié: (2025)
par: Mohammad Mahdi Hosseini
Publié: (2025)
Summary judgement in construction contract
par: Zukfli Sapeciay
Publié: (2025)
par: Zukfli Sapeciay
Publié: (2025)
Construing contract clause : the literal rule
par: Chai Siaw Hiong
Publié: (2025)
par: Chai Siaw Hiong
Publié: (2025)
Risks in the PAM 2006 Standard Form of Contracts
par: Sangeetha Arjinan
Publié: (2025)
par: Sangeetha Arjinan
Publié: (2025)
Judicial and statutory control of exemption clauses and unfair terms in adhesion contracts in England and Malaysia
par: Vaqari, Artin
Publié: (2024)
par: Vaqari, Artin
Publié: (2024)
Common contractual issues faced by Malaysian contractors operating in Middle East using fidic form of contracts
par: Ahmed Abubaker A. Saleh
Publié: (2025)
par: Ahmed Abubaker A. Saleh
Publié: (2025)
Shari`ah compliance in construction procurement with specific reference to contract formation
par: Siti Nora Haryati Abdullah Habib
Publié: (2024)
par: Siti Nora Haryati Abdullah Habib
Publié: (2024)
Fundamental principles of quasi contract : a general assessment
par: Muhammad Adli Abdullah
Publié: (2024)
par: Muhammad Adli Abdullah
Publié: (2024)
Classification and formation of contract : a comparative study
par: Muhammad Khair Ngadiron
Publié: (2024)
par: Muhammad Khair Ngadiron
Publié: (2024)
Assessment of damages under the convention on contracts for the International sale of goods (CISG)
par: Ali, Rahand Raouf
Publié: (2024)
par: Ali, Rahand Raouf
Publié: (2024)
Validity issues of variation order in construction contracts
par: Khairunnisa Rozaini
Publié: (2025)
par: Khairunnisa Rozaini
Publié: (2025)
Legal documentation of Islamic financing contracts
par: Sharaiyra, Suhaib Walid Idris
Publié: (2024)
par: Sharaiyra, Suhaib Walid Idris
Publié: (2024)
Capacity to contract in Islam : a comparative study of the law of contract, Malaysia
par: Muhammad Hanif Husin
Publié: (2024)
par: Muhammad Hanif Husin
Publié: (2024)
Negotiation for disputes settlement in construction claim : a case study on Air Lakitan sub-project-stage 1, Indonesia
par: Dewi Rozamurtina
Publié: (2025)
par: Dewi Rozamurtina
Publié: (2025)
Ethical behaviors in E-Tendering based construction procurement process in Malaysia
par: Lee, Zhi Kwong
Publié: (2025)
par: Lee, Zhi Kwong
Publié: (2025)
Profile of construction contractual claims
par: Nur Jazlianna Samsudin
Publié: (2025)
par: Nur Jazlianna Samsudin
Publié: (2025)
Sistem pengurusan kualiti : amalan terbaik proses tuntutan pembayaran dari pihak kontraktor kepada pihak klien
par: Azlin Farhana Ramli
Publié: (2025)
par: Azlin Farhana Ramli
Publié: (2025)
An enhancement of the application for fast track arbitration in the Malaysian construction industry / Nur Khodijah Muhammad Fadhlullah Ng
par: Muhammad Fadhlullah Ng, Nur Khodijah
Publié: (2020)
par: Muhammad Fadhlullah Ng, Nur Khodijah
Publié: (2020)
Formation of Contract in the Internet Under Islamic Law
par: Razali, Siti Salwani
Publié: (2007)
par: Razali, Siti Salwani
Publié: (2007)
Effects of externally applied electrical stimulus on brain relationship during isometric contraction of hand muscle
par: Suriani Hasan
Publié: (2025)
par: Suriani Hasan
Publié: (2025)
Analysis of the factors responsible for variation between forms (suwar) and subtances (haqa`iq) of islamic financial contracts : a case study of bay` al-wafa`
par: Alufanla, Adam Abdulmajeed
Publié: (2024)
par: Alufanla, Adam Abdulmajeed
Publié: (2024)
A building information modelling based on contractual framework for construction of building projects
par: Ahmad Huzaimi Abd Jamil
Publié: (2025)
par: Ahmad Huzaimi Abd Jamil
Publié: (2025)
Common approach used by the industry in assessing the contractor entitlement for extention of time in the event of concurrent delay
par: Mohammad Irfan Ahmad Zaki
Publié: (2025)
par: Mohammad Irfan Ahmad Zaki
Publié: (2025)
Electronic contract under Jordanian law : comparative study with Islamic Law
par: Al-Qassaymeh, Maen (Mohammad Ali) S.
Publié: (2024)
par: Al-Qassaymeh, Maen (Mohammad Ali) S.
Publié: (2024)
Extension of time : the issue of delay notification
par: Chin, Sze Nee
Publié: (2025)
par: Chin, Sze Nee
Publié: (2025)
Assessment of loss and expense for extension of time
par: Sorfina 'Izzati Mohd. Said
Publié: (2025)
par: Sorfina 'Izzati Mohd. Said
Publié: (2025)
The profile of construction delay cases
par: Jenny Loo Shih Yein
Publié: (2025)
par: Jenny Loo Shih Yein
Publié: (2025)
Risk And Return For The Dollar-Cost Averaging (Dca) Versus Lump-Sum (Ls) Strategy On The Market Portfolio Of Stocks Listed On The Kuala Lumpur Stock Exchange (Klse)
par: CHOW, FATT VING
Publié: (2004)
par: CHOW, FATT VING
Publié: (2004)
Misrepresentation : a comparative study of English, Malaysian and Islamic law of contract
par: Sa`odah bt. Ahmad
Publié: (2024)
par: Sa`odah bt. Ahmad
Publié: (2024)
New Variable Sampling Interval Run Sum Standard Deviation And Run Sum Multivariate Coefficient Of Variation Charts
par: Lim, Alex Jun Xiong
Publié: (2017)
par: Lim, Alex Jun Xiong
Publié: (2017)
Production sharing contracts of oil and gas in Kurdistan region of Iraq
par: Sharif, Sabah Karim
Publié: (2024)
par: Sharif, Sabah Karim
Publié: (2024)
Construction insurance
par: Lim, Wan Wei
Publié: (2025)
par: Lim, Wan Wei
Publié: (2025)
THE RELATIONAL CONTRACTING FACTORS IN BUILDING INFORMATION MODELLING (BIM) PROTOCOL FOR BIM-BASED CONSTRUCTION PROJECTS IN MALAYSIA
par: FATIMAH AQILAH BINTI MOHD HALIMI
Publié: (2024)
par: FATIMAH AQILAH BINTI MOHD HALIMI
Publié: (2024)
Compensatory damages under law of contract : a comparative study under English law, Malaysian law and Islamic law
par: Che Thalbi binti Md. Ismail
Publié: (2024)
par: Che Thalbi binti Md. Ismail
Publié: (2024)
Extension of time in commencement of arbitration proceedings
par: Noor Halwani Mokhtar,
Publié: (2025)
par: Noor Halwani Mokhtar,
Publié: (2025)
Documents similaires
-
Variation in the standard form of contract in Malaysia and Indonesia
par: Bayu Dwi Rahmatyo
Publié: (2025) -
Employer's implied obligation in construction contract
par: Nurulain Tazol Arrief
Publié: (2025) -
Recovery of interest / financing charges due to prolongation in construction contract
par: Ng, Chee Kuang
Publié: (2025) -
Comparison between construction contract used for governmnet projects in Indonesia and Malaysia
par: Adi Argo Soewendo
Publié: (2025) -
Level of understanding the contract requirements of PWD 203A (Rev.2007) standard form of contract among the construction professional
par: Norazreen Abu Bakar
Publié: (2025)
