Projek perumahan di Kota Bharu
Migration record. Kindly check the attachment for the abstract
| Main Author: | Elinawati Mat Jusoh |
|---|---|
| Other Authors: | Migration record. Kindly check the attachment for the supervisor's name. |
| Format: | Bachelor thesis |
| Language: | Malay |
| Published: |
Universiti Teknologi Malaysia
2025
|
| Subjects: | |
| Online Access: | https://utmik.utm.my/handle/123456789/175821 |
| Abstract | Abstract here |
Similar Items
Cadangan pembangunan semula Pasar Siti Khadijah Kota Bharu Kelantan
by: Tuan Sapuan Tuan Mat
Published: (2025)
by: Tuan Sapuan Tuan Mat
Published: (2025)
Kajian tempat letak kereta : kes kajian : di kawasan medan letak kereta Pantai Jaya, Jalan Pintu Pong, Kota Bharu, Kelantan
by: Norasimah Mat Nor
Published: (2025)
by: Norasimah Mat Nor
Published: (2025)
Kajian terhadap projek perumahan di Kelantan (Full text)
Published: (2025)
Published: (2025)
Kajian ke atas pemilihan tanah yang dijadikan tapak pelupusan sampah di Majlis Perbandaran Kota Bharu
by: Izuhan Hasan
Published: (2025)
by: Izuhan Hasan
Published: (2025)
Evaluation of travel trips over rescheduling of working trends : a case study at Kota Bharu, Kelantan (Fulltext)
Published: (2025)
Published: (2025)
Strategi agensi kerajaan untuk memenuhi kuota bumiputera dalam projek perumahan
by: Fatin Afiqah Md. Azmi
Published: (2025)
by: Fatin Afiqah Md. Azmi
Published: (2025)
Faktor-faktor yang membantu pemaju melaksanakan konsep bina kemudian jual di dalam projek pembangunan perumahan
by: Mas Aini Muhamad
Published: (2025)
by: Mas Aini Muhamad
Published: (2025)
Faktor-faktor kritikal bagi kejayaan perlaksanaan projek perumahan awam kos rendah
by: Zamakhsyari Khariri
Published: (2025)
by: Zamakhsyari Khariri
Published: (2025)
Pemulihan projek perumahan terbengkalai
by: Yushermi Kamal Yusah
Published: (2025)
by: Yushermi Kamal Yusah
Published: (2025)
Perlaksanaan konsep 5:95 dalam sistem penyampaian perumahan
by: Zuhaida Iberahim
Published: (2025)
by: Zuhaida Iberahim
Published: (2025)
Pembinaan perumahan di kawasan luar bandar : kajian kes
by: Ewi Ahai
Published: (2025)
by: Ewi Ahai
Published: (2025)
Masalah tunggakan sewa gerai dan pasar kajian kes : Pasar Besar Awam Siti Khadijah
by: Siti Norhazwani Abdullah Sani
Published: (2025)
by: Siti Norhazwani Abdullah Sani
Published: (2025)
Influences Of Peers On Tobacco Use And Academic Motivation In Lower Secondary School Students In Pasir Mas, Kelantan
by: Nurul Athirah Binti Fauzi
Published: (2024)
by: Nurul Athirah Binti Fauzi
Published: (2024)
Ramalan kadar alir banjir di tadahan Sungai Kelantan menggunakan perisian HEC-HMS
by: Mohd. Hafiz Yahya
Published: (2025)
by: Mohd. Hafiz Yahya
Published: (2025)
Determination of depths of closure along the Kelantan coast (Full text)
Published: (2025)
Published: (2025)
Kajian penjanaan sisa pepejal dan kepuasan hati penduduk : kajian kes : Taman Makmor, Kok Lanas, Kelantan
by: Dzul Azrie Arahim
Published: (2025)
by: Dzul Azrie Arahim
Published: (2025)
Pembinaan jalan luar bandar di Gua Musang
by: Mohd. Ridzuan Ab. Rahim
Published: (2025)
by: Mohd. Ridzuan Ab. Rahim
Published: (2025)
Simulasi curahan -air larian di kawasan tadahan Sg. Kelantan menggunakan HEC-HMS
by: Azhar Mat Zain
Published: (2025)
by: Azhar Mat Zain
Published: (2025)
Determinants of tax compliance behavior of micro-small and medium enterprises (SMEs) in Kelantan / Roslizawati Muhammad Yusof
by: Muhammad Yusof, Roslizawati
Published: (2023)
by: Muhammad Yusof, Roslizawati
Published: (2023)
Prospek perumahan masa kini dan yang akan datang di kawasan Cibinong Bogor (Fulltext)
Published: (2025)
Published: (2025)
An evaluation of privatization in land development in Kelantan (Full text)
Published: (2025)
Published: (2025)
Salah urus risiko dalam projek pembangunan projek perumahan : kajian ke atas projek perumahan terbengkalai di Malaysia (Full text)
Published: (2025)
Published: (2025)
Faktor-faktor dan kesan pertambahan pemilikan kenderaan di kawasan perumahan : kawasan kajian : Taman Sri Putra Sungai Petani, Kedah Darul Aman
by: Syafawati Johari
Published: (2025)
by: Syafawati Johari
Published: (2025)
The role of the public and private sectors in the production of houses in urban areas of Peninsular Malaysia (Fulltext)
Published: (2025)
Published: (2025)
Construction safety in Kelantan
by: Mohd. Azlan Mustapa
Published: (2025)
by: Mohd. Azlan Mustapa
Published: (2025)
Factors that influence ethical judgement of accounting students at UiTM Machang / Nur Zalifah Rasdi
by: Rasdi, Nur Zalifah
Published: (2024)
by: Rasdi, Nur Zalifah
Published: (2024)
Sistem maklumat tender JKR Kota Bharu secara atas talian
by: Saiful Nizam Sekari
Published: (2025)
by: Saiful Nizam Sekari
Published: (2025)
Masalah pembinaan rumah kos rendah di Negeri Sabah
by: Jackson Malindai
Published: (2025)
by: Jackson Malindai
Published: (2025)
Faktor-faktor yang mempengaruhi pembelian rumah kedua
by: Intan Nor Akhashah Nor Hazman
Published: (2025)
by: Intan Nor Akhashah Nor Hazman
Published: (2025)
Faktor-faktor yang mempengaruhi kejayaan kontraktor di jajahan Kota Bharu dalam menjayakan projek pembinaan
by: Mohd. Yusnie Mohamad
Published: (2025)
by: Mohd. Yusnie Mohamad
Published: (2025)
Strategies for preventing the premature and fault certification of housing development project
by: Yong Kum Weng
Published: (2025)
by: Yong Kum Weng
Published: (2025)
Decision making process model for housing developers in Malaysia
by: Rozlin Zainal
Published: (2025)
by: Rozlin Zainal
Published: (2025)
Kuarters kerajaan di daerah Kerian yang tidak berpenghuni : faktor dan penyelesaian
by: Mohamad Soffie Borham
Published: (2025)
by: Mohamad Soffie Borham
Published: (2025)
Housing needs and preferences based on maslow,s motivational theory
by: Zavei, Sayyed Javad Asad Poor
Published: (2025)
by: Zavei, Sayyed Javad Asad Poor
Published: (2025)
Faktor yang mempengaruhi permintaan penyewaan perumahan
by: Siti Noor Farahanis Fadzil
Published: (2025)
by: Siti Noor Farahanis Fadzil
Published: (2025)
Lebihan penawaran kondominium di Kota Bharu
by: Muhammad Islahuddin Husin
Published: (2025)
by: Muhammad Islahuddin Husin
Published: (2025)
Evaluation of housing estate development by using modified leed neighbourhood development rating system : case study : Iskandar Malaysia
by: Tan, Lip Seng
Published: (2025)
by: Tan, Lip Seng
Published: (2025)
Perlaksanaan sistem CCC bagi pembangunan hartanah kediaman dalam kawasan Majlis Perbandaran Ampang Jaya (MPAJ), Selangor Darul Ehsan
by: Zaidi Mohamad
Published: (2025)
by: Zaidi Mohamad
Published: (2025)
Housing affordability for public servants in Bauchi State, Nigeria
by: Amamata Larai Zakari
Published: (2025)
by: Amamata Larai Zakari
Published: (2025)
The contribution and challenges faced by private developers in addressing the housing d eficit in Ghana
by: Ebenezer Afrane
Published: (2025)
by: Ebenezer Afrane
Published: (2025)
Similar Items
-
Cadangan pembangunan semula Pasar Siti Khadijah Kota Bharu Kelantan
by: Tuan Sapuan Tuan Mat
Published: (2025) -
Kajian tempat letak kereta : kes kajian : di kawasan medan letak kereta Pantai Jaya, Jalan Pintu Pong, Kota Bharu, Kelantan
by: Norasimah Mat Nor
Published: (2025) -
Kajian terhadap projek perumahan di Kelantan (Full text)
Published: (2025) -
Kajian ke atas pemilihan tanah yang dijadikan tapak pelupusan sampah di Majlis Perbandaran Kota Bharu
by: Izuhan Hasan
Published: (2025) -
Evaluation of travel trips over rescheduling of working trends : a case study at Kota Bharu, Kelantan (Fulltext)
Published: (2025)