Alignment during pre project planning
Also available in printed version
| Main Author: | Nurul Nadia Abd. Karim |
|---|---|
| Other Authors: | Aziruddin Ressang, supervisor |
| Format: | Master's thesis |
| Language: | English |
| Published: |
Universiti Teknologi Malaysia
2025
|
| Subjects: | |
| Online Access: | https://utmik.utm.my/handle/123456789/45810 |
| Abstract | Abstract here |
Similar Items
PRE-BID risk assessment in oil and gas project
by: Siti Ummrah Musa
Published: (2025)
by: Siti Ummrah Musa
Published: (2025)
Adoption of Building Information Modelling (BIM) tools during pre-construction stage in Malaysian construction industry
by: Mak, Tuck Kiong
Published: (2025)
by: Mak, Tuck Kiong
Published: (2025)
Ground improvement on land reclamation project-prefabricated vertical drain with pre-loading
by: Lee, Yoon Leong
Published: (2025)
by: Lee, Yoon Leong
Published: (2025)
Emergency response plan during earthquake disaster at mountainous area of Kinabalu Park, Sabah
by: Fung, Alex
Published: (2025)
by: Fung, Alex
Published: (2025)
Causes of delay in the planning and design phases for public works department construction projects
by: Azrul Hanif Ab. Halim
Published: (2025)
by: Azrul Hanif Ab. Halim
Published: (2025)
2D simulation of a straight channel morphological bed changes due to groynes alignments
by: Muhammad Syahmi Salmin
Published: (2025)
by: Muhammad Syahmi Salmin
Published: (2025)
The impact of value management on project success in Felda projects
by: Nurul Izzaida Othman
Published: (2025)
by: Nurul Izzaida Othman
Published: (2025)
Impact Of Enterprise Resource Planning (ERP) System Misfit On Information Quality : A Moderated Model Of Alignment Strategies
by: Tan, Shiang Yen
Published: (2012)
by: Tan, Shiang Yen
Published: (2012)
Jabatan Kerja Raya project delivery excellence through effective project communication management
by: Noorhayati Abd. Hamid
Published: (2025)
by: Noorhayati Abd. Hamid
Published: (2025)
Analysis and testing of WELLGUARD pre - cast retaining element
by: Yii, Hing
Published: (2025)
by: Yii, Hing
Published: (2025)
Design of an automatic alignment on multiple choices of survey forms
by: Mohd. Saiful Abdul Razak
Published: (2025)
by: Mohd. Saiful Abdul Razak
Published: (2025)
Forepoling pre-support application in the shallow tunneling through weathered granite
by: Sarder Mohammad Yahya
Published: (2025)
by: Sarder Mohammad Yahya
Published: (2025)
Risk management of design and build project
by: Nurul Khalida Amat Bakri
Published: (2025)
by: Nurul Khalida Amat Bakri
Published: (2025)
Cash flow planning of building contractors
by: Low, Yee Wai
Published: (2025)
by: Low, Yee Wai
Published: (2025)
Planning and management of peak demand transport during the haji
by: Mohammed Abdullah Alzahrani
Published: (2025)
by: Mohammed Abdullah Alzahrani
Published: (2025)
The effect of creep and shrinkage on the deflection of pre - stressed high strength concrete beam
by: Teow, Ching Ching
Published: (2025)
by: Teow, Ching Ching
Published: (2025)
Challenges faced by project manager in oil and gas construction project in Malaysia
by: Som Phong Wetsandornphong Eh Suk
Published: (2025)
by: Som Phong Wetsandornphong Eh Suk
Published: (2025)
The impact of changing project delivery model on precontract administration for infrastructure project
by: Norfahana Abdul Ghani
Published: (2025)
by: Norfahana Abdul Ghani
Published: (2025)
Construction site layout planning for residential project
by: Tan, Jiun Yang
Published: (2025)
by: Tan, Jiun Yang
Published: (2025)
Reservoir storage planning for various water demands
by: Muhammad Hasnan Na'iem Nazemi
Published: (2025)
by: Muhammad Hasnan Na'iem Nazemi
Published: (2025)
Aligning short carbon fibres in hybrid composites for high performance application
by: Jong, Alexander Jiun Wei
Published: (2025)
by: Jong, Alexander Jiun Wei
Published: (2025)
Study on the influence of head of project team throughtout JKR project life cycle
by: Mohd. Hafiz Mohd. Ali
Published: (2025)
by: Mohd. Hafiz Mohd. Ali
Published: (2025)
The influence of emotional intelligence of main contractor project team towards project performances for the construction industry at Lot 91 project, Kuala Lumpur
by: Nadzarith Raiha Abdul Rahim
Published: (2025)
by: Nadzarith Raiha Abdul Rahim
Published: (2025)
Pre-contract cost management:|ba study on risk management and its effect towards costs
by: Akmal Fazrin Mohamed Nazri
Published: (2025)
by: Akmal Fazrin Mohamed Nazri
Published: (2025)
Seismic torsional response of multistory asymmetric plan building
by: Lo, Pamela Adeline
Published: (2025)
by: Lo, Pamela Adeline
Published: (2025)
Critical influencing factors to construction cost in planning stage
by: Lau, Sie Yuong
Published: (2025)
by: Lau, Sie Yuong
Published: (2025)
Sustainable campus master plan for UTM land development
by: Chai, Woei Dar
Published: (2025)
by: Chai, Woei Dar
Published: (2025)
Weightage of criteria for road green planning and procurement implementation
by: Normuslizam Abdul Mutalib
Published: (2025)
by: Normuslizam Abdul Mutalib
Published: (2025)
The effect of communication management practice between head of project team and superintending officers towards project success for slope project in Jabatan Kerja Raya (JKR)
by: Norlinah Nawir
Published: (2025)
by: Norlinah Nawir
Published: (2025)
Contract management in construction project
by: Nur Naimah Suhaime
Published: (2025)
by: Nur Naimah Suhaime
Published: (2025)
Biogranulation development during treatment of real textile wastewater
by: Ranjeni Krishnen
Published: (2025)
by: Ranjeni Krishnen
Published: (2025)
Noise exposure of construction workers during the earthwork stage
by: Muhammad Syazwi Shafie
Published: (2025)
by: Muhammad Syazwi Shafie
Published: (2025)
Evaluation of noise level during sub structure activities
by: Nur Liyana Ahmad Zuki
Published: (2025)
by: Nur Liyana Ahmad Zuki
Published: (2025)
Cost planning in water resources infrastructure maintenance project
by: Erwando Rachmadi
Published: (2025)
by: Erwando Rachmadi
Published: (2025)
The influence of project managers� leadership in successful interior projects
by: Riza Rasyilah Arifin
Published: (2025)
by: Riza Rasyilah Arifin
Published: (2025)
Mitigation of variation order in construction project at Kota Bharu, Kelantan Darul Naim
by: Ahmad Muzhafarruddin Abd. Mallek
Published: (2025)
by: Ahmad Muzhafarruddin Abd. Mallek
Published: (2025)
Improvise planning elements in the perspective to reduce the risk of flash flood
by: Syamsul Azwan Adnan
Published: (2025)
by: Syamsul Azwan Adnan
Published: (2025)
Development Of Spacer Free
Self-Aligned Contact Implantation For Power Devices
by: Poobalan, Banu
Published: (2009)
by: Poobalan, Banu
Published: (2009)
The Effects Of Pre-Task Planning Time And Task Structure On Second Language Learner’s Writing Performance
by: Seyyedi, Keivan
Published: (2014)
by: Seyyedi, Keivan
Published: (2014)
Fuzzy ant colony algorithm for pairwise sequence alignment
by: Sabahi, Bahman Fakhr
Published: (2025)
by: Sabahi, Bahman Fakhr
Published: (2025)
Similar Items
-
PRE-BID risk assessment in oil and gas project
by: Siti Ummrah Musa
Published: (2025) -
Adoption of Building Information Modelling (BIM) tools during pre-construction stage in Malaysian construction industry
by: Mak, Tuck Kiong
Published: (2025) -
Ground improvement on land reclamation project-prefabricated vertical drain with pre-loading
by: Lee, Yoon Leong
Published: (2025) -
Emergency response plan during earthquake disaster at mountainous area of Kinabalu Park, Sabah
by: Fung, Alex
Published: (2025) -
Causes of delay in the planning and design phases for public works department construction projects
by: Azrul Hanif Ab. Halim
Published: (2025)