Collaborative procurement strategy in private sector housing projects using industrialised buidling system
Also available in printed version
| Main Author: | Mahdi Moharrami Meynagh |
|---|---|
| Other Authors: | Abdul Kadir Marsono, supervisor |
| Format: | Doctoral thesis |
| Language: | English |
| Published: |
Universiti Teknologi Malaysia
2025
|
| Subjects: | |
| Online Access: | https://utmik.utm.my/handle/123456789/47058 |
| Abstract | Abstract here |
Similar Items
Strategies to elevate the performance of industrialised building system in government project
by: Zul Amri Abu Bakar
Published: (2025)
by: Zul Amri Abu Bakar
Published: (2025)
Productivity rate for industrialised building system project
by: Raja Puteri Marlina Raja Abd. Assis
Published: (2025)
by: Raja Puteri Marlina Raja Abd. Assis
Published: (2025)
Suitability of design and build procurement system for BIM projects
by: Ibrahem Ahmed Hamed Alhaisami
Published: (2025)
by: Ibrahem Ahmed Hamed Alhaisami
Published: (2025)
A Comparative Study Between Public And Private Procurement System In Building Projects In Malaysia
by: Radzi, Nurhidayah Mohd
Published: (2012)
by: Radzi, Nurhidayah Mohd
Published: (2012)
Seismic performance of industrialised building block house system with different damping configurations
by: Lee, Shu Chi
Published: (2025)
by: Lee, Shu Chi
Published: (2025)
Structural performance of industrialised building system block house under static and dynamic loadings
by: Yip, Chun Chieh
Published: (2025)
by: Yip, Chun Chieh
Published: (2025)
Experimental of industrialised building system blockwork for housing
by: Farah Nabila Shamsul Anwar
Published: (2025)
by: Farah Nabila Shamsul Anwar
Published: (2025)
Corruption in public procurement systems Malaysian public sector perspective
by: Nurhamdiana Muddin
Published: (2025)
by: Nurhamdiana Muddin
Published: (2025)
Challenges or constraints in the implementation of industrialised building system for projects under Jabatan Kerja Raya Negeri Perak
by: Nurul Akmal Nordin
Published: (2025)
by: Nurul Akmal Nordin
Published: (2025)
Factors and impacts of excusable delays in Malaysia engineering, procurement and consturction projects
by: Suresh Munusamy
Published: (2025)
by: Suresh Munusamy
Published: (2025)
Implementation strategy for industrialised building system (Full text)
Published: (2025)
Published: (2025)
Factors Influencing The Readiness Of
The Public And Private Sectors To
Implement Public-Private
Partnerships In Developing
Affordable Housing In
Yemen
by: Al Shareem, Khaled Mohammed Ahmed
Published: (2014)
by: Al Shareem, Khaled Mohammed Ahmed
Published: (2014)
The role of the public and private sectors in the production of houses in urban areas of Peninsular Malaysia (Fulltext)
Published: (2025)
Published: (2025)
Industrialised building system versus conventional system towards sustainability in construction
by: Tria Yuliani Resat
Published: (2025)
by: Tria Yuliani Resat
Published: (2025)
A framework on improving integration of supply chain in Industrialised Building System (IBS) using design & build procurement in Malaysia / Ani Saifuza Abd. Shukor
by: Abd. Shukor, Ani Saifuza
Published: (2015)
by: Abd. Shukor, Ani Saifuza
Published: (2015)
Cyclic nonlinear test for Industrialised Building System (IBS) interlocking blockwork system
by: Tan, Chun Hong
Published: (2025)
by: Tan, Chun Hong
Published: (2025)
Cyclic nonlinear test for Industrialised Building System (IBS) interlocking blockwork system
by: Tan, Chun Hong
Published: (2025)
by: Tan, Chun Hong
Published: (2025)
Perception on industrialised building system (IBS): a case study in Sabah
by: Azureen Sabina Walter
Published: (2025)
by: Azureen Sabina Walter
Published: (2025)
Comparative constructionduration between Industrialised Building System (IBS) and conventional method
by: Tee, Yong Sheng
Published: (2025)
by: Tee, Yong Sheng
Published: (2025)
Challenges faced by private developers in developing affordable housing in Kuala Lumpur
by: Raja Saharudin Raja Muda
Published: (2025)
by: Raja Saharudin Raja Muda
Published: (2025)
Low cost housing provision by the private sector in a booming economy / Mat Zain Mat Hassan
by: Mat Hassan, Mat Zain
Published: (2004)
by: Mat Hassan, Mat Zain
Published: (2004)
Project manager's competency framework in managing Industrialised Building System (IBS) construction project / Izatul Laili Jabar
by: Jabar, Izatul Laili
Published: (2017)
by: Jabar, Izatul Laili
Published: (2017)
Evaluating IT project requirement in private sector: a case study of TNB / Mohd Khairi Ismayuddin
by: Ismayuddin, Mohd Khairi
Published: (2015)
by: Ismayuddin, Mohd Khairi
Published: (2015)
Industrialised building system (IBS) : behaviour of low-storey residential building frame
by: Voon, Poh Luan
Published: (2025)
by: Voon, Poh Luan
Published: (2025)
Implementation of E-procurement for construction materials
by: Ling, Steven Hoe Khing
Published: (2025)
by: Ling, Steven Hoe Khing
Published: (2025)
Strategies for preventing the premature and fault certification of housing development project
by: Yong Kum Weng
Published: (2025)
by: Yong Kum Weng
Published: (2025)
Decision making tool for industrialised building system adoption through integrated life cycle cost analysis
by: Siti Mazzuana Shamsuddin
Published: (2025)
by: Siti Mazzuana Shamsuddin
Published: (2025)
Green building features and construction cost in housing project
by: Nur Nabila Bazli
Published: (2025)
by: Nur Nabila Bazli
Published: (2025)
ICT procurement officer competency measurement model for Malaysia public sector / Azran Ahmad
by: Ahmad, Azran
Published: (2021)
by: Ahmad, Azran
Published: (2021)
Challenges affecting the project delivery of affordable housing development in Malaysia
by: Ariff Mohd. Arshad
Published: (2025)
by: Ariff Mohd. Arshad
Published: (2025)
Weightage of criteria for road green planning and procurement implementation
by: Normuslizam Abdul Mutalib
Published: (2025)
by: Normuslizam Abdul Mutalib
Published: (2025)
Best value procurement for contractor selection in the Malaysian construction industry
by: Mohd. Shamsuri Shamsuddin
Published: (2025)
by: Mohd. Shamsuri Shamsuddin
Published: (2025)
Procurement methods and contractor's bidding strategy in Middle East construction industry
by: Omidreza Amirsoleimani
Published: (2025)
by: Omidreza Amirsoleimani
Published: (2025)
Building information modeling (BIM) and design and build procurement in building construction projects
by: Rozana Mohamed Salleh
Published: (2025)
by: Rozana Mohamed Salleh
Published: (2025)
The strategies of Malaysian contractors involvement in international project
by: Muhammad Izat Ishak
Published: (2025)
by: Muhammad Izat Ishak
Published: (2025)
Construction Owner's Role In Construction Safety (Private Sector)
by: Khor, Boon Sian
Published: (2007)
by: Khor, Boon Sian
Published: (2007)
Model Of Technology Acceptance Affecting User Behavioural Intention In E-procurement Adoption In The Nigerian Public Sector
by: Musa, Usman
Published: (2023)
by: Musa, Usman
Published: (2023)
The market opportunity for student's private-rented housing
by: Siah, Lay Hoon
Published: (2025)
by: Siah, Lay Hoon
Published: (2025)
A hybrid multi-criteria decision making method for risk assessment of public-private partnership projects
by: Hadi Sarvari
Published: (2025)
by: Hadi Sarvari
Published: (2025)
Profiling of construction disputes in private projects
by: Felicia, Yong Yan Yan
Published: (2025)
by: Felicia, Yong Yan Yan
Published: (2025)
Similar Items
-
Strategies to elevate the performance of industrialised building system in government project
by: Zul Amri Abu Bakar
Published: (2025) -
Productivity rate for industrialised building system project
by: Raja Puteri Marlina Raja Abd. Assis
Published: (2025) -
Suitability of design and build procurement system for BIM projects
by: Ibrahem Ahmed Hamed Alhaisami
Published: (2025) -
A Comparative Study Between Public And Private Procurement System In Building Projects In Malaysia
by: Radzi, Nurhidayah Mohd
Published: (2012) -
Seismic performance of industrialised building block house system with different damping configurations
by: Lee, Shu Chi
Published: (2025)