Kajian terhadap kelongsong penyambung grout dengan gegelung untuk sambungan konkrit pra-tuang

Also available in printed version

Bibliographic Details
Main Author: Mohd. Asrul Abdul Ghani
Other Authors: Ahmad Baharuddin Abd. Rahman, supervisor
Format: Bachelor thesis
Language:Malay
Published: Universiti Teknologi Malaysia 2025
Subjects:
Online Access:https://utmik.utm.my/handle/123456789/59849
Abstract Abstract here
_version_ 1854975067995242496
author Mohd. Asrul Abdul Ghani
author2 Ahmad Baharuddin Abd. Rahman, supervisor
author_facet Ahmad Baharuddin Abd. Rahman, supervisor
Mohd. Asrul Abdul Ghani
author_sort Mohd. Asrul Abdul Ghani
description Also available in printed version
format Bachelor thesis
id utm-123456789-59849
institution Universiti Teknologi Malaysia
language Malay
publishDate 2025
publisher Universiti Teknologi Malaysia
record_format dspace
record_pdf Abstract
spelling utm-123456789-598492025-08-20T23:53:36Z Kajian terhadap kelongsong penyambung grout dengan gegelung untuk sambungan konkrit pra-tuang Mohd. Asrul Abdul Ghani Ahmad Baharuddin Abd. Rahman, supervisor Civil engineering Also available in printed version Precast concrete systems are getting popular in construction due to fast completion of project. However, there are large numbers of connections in precast concrete system that can cause a problem, in term of the reliability and the cost of the connectors. This research is a preliminary study to develop an economic and reliable sleeve connection for precast concrete system. In this study a total of nine steel pipe splice sleeves were experimentally tested under incremental tensile load. Spiral were welded onto the end of sleeves to provide interlocking mechanism for the grout. This prevents the grout from slipping out of the sleeve. The embedded length of Y16 steel bar, inner-diameter of splice sleeve and pitch distance of spiral were varied to study their effect to the tensile performance. The Y16 steel bar was used as control specimen. This paper presents the results obtained from tensile test and discussion of the failure mode for each specimen. The experiment result shows that none of the specimens could achieve the required strength. However, the understandings of the causes of failures obtained from the study provide essential basis for future research snhas UTM 83 p. Project Paper (Sarjana Muda Kejuruteraan (Awam)) - Universiti Teknologi Malaysia, 2010 2025-03-17T06:17:36Z 2025-03-17T06:17:36Z 2010 Bachelor thesis https://utmik.utm.my/handle/123456789/59849 valet-20170420-142548 vital:97821 ML Closed Access UTM Complete Unpublished application/pdf Universiti Teknologi Malaysia
spellingShingle Civil engineering
Mohd. Asrul Abdul Ghani
Kajian terhadap kelongsong penyambung grout dengan gegelung untuk sambungan konkrit pra-tuang
thesis_level Other
title Kajian terhadap kelongsong penyambung grout dengan gegelung untuk sambungan konkrit pra-tuang
title_full Kajian terhadap kelongsong penyambung grout dengan gegelung untuk sambungan konkrit pra-tuang
title_fullStr Kajian terhadap kelongsong penyambung grout dengan gegelung untuk sambungan konkrit pra-tuang
title_full_unstemmed Kajian terhadap kelongsong penyambung grout dengan gegelung untuk sambungan konkrit pra-tuang
title_short Kajian terhadap kelongsong penyambung grout dengan gegelung untuk sambungan konkrit pra-tuang
title_sort kajian terhadap kelongsong penyambung grout dengan gegelung untuk sambungan konkrit pra tuang
topic Civil engineering
url https://utmik.utm.my/handle/123456789/59849
work_keys_str_mv AT mohdasrulabdulghani kajianterhadapkelongsongpenyambunggroutdengangegelunguntuksambungankonkritpratuang